Skip to content
Georgia Commons
Menu

Rockdale County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Part B - PLANNING AND DEVELOPMENT / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 302 - SUBDIVISION AND SITE DEVELOPMENT STANDARDS / Article VI - SPECIFICATIONS OF STANDARD DEVELOPMENT DOCUMENTS

Sec. 302-65. Street, sidewalk and bicycle improvements plan.

About this text

  • As published by Municode, current through 2026-01-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Plans, profiles, and sections required. Plans must include centerline profiles of all proposed streets. Profiles shall be drawn on standard plan and profile sheets with plan section showing street layout, pavement and right-of-way width, curvature and required drainage facilities.

(b) Underground utilities. Where sanitary sewer or stormwater sewers are to be installed within a street, the grade, size, location and bedding class of pipe, and the location and invert elevations of manholes shall be indicated on the road profile.

(c) Street profiles. Centerline profiles of new streets shall include elevations at 50 feet intervals for such distance as may be adequate to provide continuity consistent with the standards required by chapter 332 for street improvements, but no less than 200 feet.

(d) Elevations. All plan elevations shall be coordinated and sited into U.S. Coast and Geodetic Survey or Georgia Department of Transportation benchmarks where feasible.

(e) Striping and signage plan. A street striping and signage plan, showing improvements in accordance with the Manual on Uniform Traffic Control Devices, latest edition as published by the Federal Highway Administration, shall be prepared for any street newly constructed or widened to three or more lanes.

(f) Bicycle improvements.

(1) Bicycle improvements, where applicable, are to be designed in accordance with

subsection 332-9(h), and construction drawings prepared in the street, sidewalk and bicycle improvements plan. All of

the following improvements shall be located and designed where required by this UDO or applicable conditions of rezoning or permit approval:

a. Multi-purpose trails.

b. On-street bicycle lanes.

c. Ramps and bollards at intersections with public streets.

d. Bicycle signage and pavement markings.

e. Bicycle parking spaces.

(2) Bicycle improvement plan. Where bicycle improvements or multi-purpose trails are required or provided, a bicycle plan shall be submitted, reviewed and approved

consisting of the following elements:

a. A site plan at a scale of one inch = 50 feet showing the location of onstreet and off-street bike lanes or paths with respect to rights-ofways, easements, streets, sidewalks, trails, streams, parking areas and

buildings on the site.

b. The typical cross-section of the bicycle facilities showing the typical cross-slopes, paving or surfacing and sub-base, drainage, and horizontal and vertical clearance standards.

c. A profile sheet or other indication of the grade of bicycle lanes or paths.

d. Typical construction details of the paving or surfacing, drainage, signage, pavement marking, bollards, ramps, and intersections with public

streets.

e. Location and construction of any proposed amenities such as restrooms, rest areas, shelters, benches, lighting, refuse collection, water

fountains, bicycle parking fixtures, and landscaping.

History

The history line the source prints at the end of the section.

(Ord. No. 0-2006-32, §§ 1—3, 11-28-2006)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rockdale-county/zoning/302-65@2026-01-27-607ab6aff0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Rockdale County Zoning Ordinance, Sec. 302-65. Street, sidewalk and bicycle improvements plan | Georgia Commons