Sec. 302-67. As-built drawings.
About this text
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) As-built drawings required in article III of this chapter 302 shall show the location, vertical and horizontal alignment and finished elevations (top and inverts, as appropriate) of the improvements listed below:
(1) Drainage system pipes and channels.
(2) Bridges or culverts.
(3) Stormwater management facilities.
(4) Sanitary sewer system in accordance with requirements of Rockdale Water Resources.
(5) Water system in accordance with requirements of Rockdale Water Resources.
(6) Streets, including street centerlines showing angles of deflection and standard curve data of intersection, radii, length of tangents and arcs, and degree of curvature with basis of curve data. Also indicate
pavement width and pavement structure (individual thickness of wearing course, binder course, base, and/or sub-base).
(7) Curb and gutter, sidewalks, multi-purpose trails, bicycle facilities, and recreation improvements on property dedicated to the public.
(8) Signage in public rights-of-way and other public dedicated areas.
(9) Any other improvements subject to maintenance by the county.
(b) As-built drawings shall bear the stamp and certification of a professional engineer or registered land surveyor.
(c) Digital as-built submittal standards. As of August 1, 2007, all as-built plans submitted to Rockdale County must be provided in electronic computer aided design (CAD) format. The following standards must be followed for all plans. Final plans will not be approved or certificates of occupancy will not be issued until these standards are met. The as-builts must be submitted with the
first review set of plans delivered to the Rockdale County Plans Coordinator.
General Requirements
(1) Requirements for as-built plans submitted to Rockdale County.
a. All as-built drawings must be referenced to the Rockdale County control network. All drawings must contain four-reference survey markers (pins or monuments) tied to the
Rockdale County monument network. Each marker should have the coordinates established on the drawing. A copy of the Rockdale County monument network can be found on
the county's website at:
www.rockdalecounty.org or may be obtained in person at the Rockdale County Administrative Services building, Room 207. This requirement is in addition to the monument requirement contained in the Unified Development Ordinance.
b. All features depicted in the as-built drawings must be surveyed after construction. Rockdale County may, at its discretion, spot check coordinates
for accuracy. In the case where a spot check is made and a significant discrepancy exists, the as-builts will be rejected. A significant discrepancy is defined as greater than one and one-half times the horizontal or
vertical tolerance.
c. The following features are acceptable: Line, polyline, and polygon. Any other features such as leaders, blocks,
etc., should not be present on the standard Rockdale County CAD features layers.
d. Profiles for roads, stormwater and sewer are required.
e. In addition to the electronic version, two sets of paper copies must be submitted.
f. Electronic "as-built" files must be compatible with the Rockdale County Water Resources (RCWR) version of AutoCAD. Contact Rockdale County Water Resources for clarification.
g. The following text blocks must be included in the electronic as-builts per RCWR Water and Wastewater Standards:
I certify that this project has been constructed in accordance with Rockdale County Water Resources Water and Wastewater Standards and Specifications, latest edition. I also certify that this project has been built as
shown on the "As Built" drawings.
I certify that the plans and specifications of this project were designed in accordance with all applicable standards. I also certify that all facilities, structures and
utilities were installed in full accordance with the project design drawings and specifications.
I certify that this project has been built as depicted on "AsBuilt" drawings. I further certify that I have field verified all elevations, volumes and locations as appropriate for the potable
water, sanitary sewer and stormwater management structures depicted on these drawings.
b.
C.
d.
e.
f.
g.
h.
All required layers listed in the Rockdale County CAD layers must contain only the features that are described for that layer. For example, the "BOUNDARY_LINE" layer must only contain the boundary line
and not such features as north arrows or parcels.
All required layers must be present in the drawing except for features that do not pertain to a particular project. For example, some commercial projects or apartment complexes may not contain sewer taps as part
of the construction and should not be included in the drawing.
All layers must be clearly differentiated from each other.
Two layers having the names "WATER_LINE" and "WATER_LINES" should not exist in the same drawing.
"SEWER_LINE_TEXT" and "SEWER_TEXT" shall not exist in the same drawing.
All text must appear on separate layers from the layers they annotate. For example, text describing a sewer line must be on the
"SEWERLINE_TEXT" layer, not the "SEWERLINE" layer.
(2) The following are requirements for the layering of the as-built plans.
Text leaders should be placed on the text layer, not the feature layer. For example, the leader for the diameter of a water pipe should be on "WATER_LINE_TEXT" layer, not the "WATER_LINE" layer. Leaders should be drawn using Line features, not Leaders.
a. Layer names for required layers must exactly match Rockdale County standard layer names.
Rockdale County Standard Layers Layer Name Layer Description Survey _Marker Permanent Survey Marker and/or Property Corner Pin Survey_Marker_Text Permanent Survey Marker and/or Property Corner Pin Description/Thxt
San Sewer Manholes Sanitary Sewer Manholes San_Sewer_Pipes Sanitary Sewer Pipes Layer Name Layer Description San Sewer Taps Sanitary Sewer Taps at Right-of-Way or Stub-Out Location San Sewer Laterals Sanitary Sewer Lateral
San Sewer Text Sewer System Description/Text Water Features Water Valves, Water Meters, Fire Hydrants, Tees, Caps, etc.
Water_Pipes Water Mains Water Laterals Water Laterals Water Text Water System Descriptionfl'ext Storm_Features Catch Basins, Headwalls, Drop Inlets, Outlet Structures, Etc.
Storm Pipes Storm Drain Pipes and Culverts Storm Text Storm Drain Descriptions/Text Detention_Features Detention/Retention Ponds Road Polygon Roadway Polygons Road Centerline Roadway Centerline Road Text Roadway Descriptions/Text Property Boundary Closed Property Boundary Polygons Property Easement Boundary Closed Easement Boundary Polygons Property Text Property/Easement Descriptions/Text/Address Impervious Surface Impervious Surface Features Impervious_Surface_ Text Impervious Surface Descriptionfl'ext
(3) Annotations.
a. Any non-standard water and/or sewer lines must be annotated as such.
Line diameter, material, ownership, etc., that does not conform to standard practice should be noted in the corresponding annotation layer.
b. All required text must be single line text.
c. All annotation for polyline (polygon) features must be bounded by the polygon it annotates.
( 4) Filing name and revisions.
a. File names should correspond exactly to the subdivision or project name and should be consistent from
one version to the next. The file name should include the drawing revision date (in YYYYMMDD format) as part of the name. There should be no spaces in the name, only underscores. An example file name for the May 7, 2007 revision for the third phase of the Orange Grove Subdivision is "Orange_ Grove_3_20070507"
b. File revision dates shall be updated only by the contractor/developer.
(5) Deliverable format.
a. All files will be delivered on a single disk media inAutoCAD (Release 2000 or higher). CDs and DVDs are the only acceptable media. No submission will be accepted via internet as an e-mail attachment.
b. All deliverables will be labeled with the file name, company name, contact name and phone number. A transmittal letter stating this information will also accompany the disk.
(6) Sanitary sewer specifications.
a. Survey accuracy requirements for sanitary sewer infrastructure.
1. Coordinate data for sanitary sewer manholes shall be established at the center of the top of the lid. Accuracy requirements
shall be a horizontal accuracy <
0.25 foot and a vertical accuracy of< 0.1 foot.
2. Coordinate data for sanitary sewer lines shall be established through the use of the sanitary sewer manhole coordinate data.
Invert elevations shall be established by direct measurement of the distance from the lid elevation to the invert of each (7) pipe. Vertical accuracy of< 0.1 foot shall apply to all sanitary sewer inverts.
3. Coordinate data for sanitary sewer taps at the right-of-way or stub-out shall be a horizontal accuracy of< 0.5 foot. Coordinate data for the connection of the tap to the sewer line
shall be based on computed coordinates utilizing the distance from the upstream or downstream manholes and the sewer line geometry. The vertical coordinate (i.e. elevation) shall not apply to sewer taps.
Digital drawing specifications. The following specifications shall apply to the development of all digital as-built drawings pertaining to the sanitary sewer system.
a. Sewer lines will be drawn with proper directionality; lines must be drawn from the upstream manhole to the downstream manhole.
b. All sewer lines shall be drawn from the center point of the upstream manhole to the center point of the downstream manhole with a single line. No gaps should exist between the sewer lines. Lines must not continue for more than one manhole.
c. Manholes shall be drawn consistently with a circle centered exactly on the sewer line endpoints.
d. Sewer tap locations shall be drawn with a single line from the location of the intersection of the right-of-way or stub-out (if applicable) to a point intersecting the sewer line.
e. All manholes shall be labeled with a unique identifier (Sanitary _Sewer _Manhole# 1, SSMH_l, etc).
f. All Sewer Lines shall be labeled with a unique identifier (Sanitary _Sewer_Pipe#l, SSPipe_l, etc), pipe diameter (8 inch, etc.) and pipe material (PVC, DIP, etc).
g. All sewer taps shall be labeled with a unique identifier (Sanitary _Sewer_Tap#l, SSTap_l, etc.).
(8) Approved sewer symbology.
(9) @ Manhole Water system specifications.
a . Survey accuracy requirements for water system infrastructure:
1. Coordinate data for fire hydrants, valves and meters shall be established at the center of the top of the fire hydrant, valve or water meter. Accuracy requirements shall be a horizontal accuracy of< 0.25 foot and a vertical accuracy of < 0.1 foot.
2. Coordinate data for water line tees, caps, bends and reducers shall be established at a point on the ground surface directly above the tee, cap, bend or reducer as determined by a utility locate. Accuracy requirements shall be a horizontal accuracy of < 0.25 foot and a
vertical accuracy < 0.1 foot. Alternatively, tees, caps, bends and reducers can be surveyed
directly prior to back filling. If this alternative method is utilized, a note should be added to the drawing indicating these
features were surveyed as such.
3. Coordinate data for water lines shall be established at points on the ground surface directly above the water line as deter- mined by a utility locate and data collected for valves, tees, caps, bends and reducers. Coordinates should be collected for points along the water line averaging every 50 feet or closer if appropriate. Accuracy requirements shall be a horizontal accuracy of< 0.25 foot and avertical accuracy of 0.5 foot.
Alternatively, water lines can be surveyed directly prior to back filling. If this alternative method is utilized, a note should be added to the drawing indicating these features were surveyed as such.
(10) Digital drawing specifications. The following specifications shall apply to the development of all digital as-built drawings pertaining to the water system:
a. All water lines shall be drawn from valves, tees, caps, etc. to the next valve, tee, cap, etc and be continuous between these features. No gaps should exist between water lines.
b. Water meters, valves, hydrants, reducers, caps, etc. shall be drawn consistently with approved symbology centered exactly at the coordinates provided for the feature.
c. Water line laterals shall be drawn from the location of the water meter to a point intersecting the water line.
d. All water meters, valves, hydrants, reducers, caps, etc. shall be labeled with a unique identifier (Fire_Hydrant#l, FH_l, etc.).
e. All water lines shall be labeled with a unique identifier (Water_Line#l, WL_l, etc.), pipe diameter (eight-inch, etc.) and pipe material (PVC, DIP, etc.).
(11) Approved water symbology.
Water Meter Water Line Valve Water Line Reducer Backflow Preventer [>i<J Water Line Bend Water Line Tee Water Line Cap Fire Hydrant
(12) Stormwater infrastructure drainage.
a. Survey accuracy requirements for storm drainage infrastructure.
Coordinate data for storm drain surface structures shall be established at the center of the top of the access lid (Catch Basins, Junction Boxes), center of the top of the grate (drop inlets, hooded grate inlets) or the invert of the pipe (headwalls, flared end sections).
Accuracy shall be a horizontal distance of< 0.25 foot and a vertical accuracy of< 0.1 foot.
Coordinate data for storm drain pipes/culverts shall be established through the use of the storm drain surface structure coordinate data. Invert elevations shall be established by direct measurement of the distance of the lid or grate elevation to the invert of each pipe.
Vertical accuracy of< 0.1 foot shall apply to all storm drain pipe/culvert inverts.
(13) Digital drawing specifications: The following specifications shall apply to the development of all digital as-built drawings pertaining to the storm sewer system.
a. Storm lines will be drawn with proper directionality; lines must be drawn from the upstream structure to the downstream structure with a single line.
b. All storm lines shall be drawn from the coordinates of the upstream structure to the coordinates of the downstream structure. No gaps should exist between storm lines. Lines must not continue for more than one structure.
c. Headwalls, drop inlets, catch basins, etc. Shall be drawn consistently with approved symbology centered exactly at the coordinates provided for the feature.
d. All structures shall be labeled with a unique identifier (Catch_Basin#l, CB_l, HW _19, etc).
e. All storm lines shall be labeled with a unique identifier (Storm_Pipe#l, SP _l, etc.), pipe diameter (36 inch, etc.) and pipe material (BCCMP, RCP, HDPE, etc.).
f. Detention ponds must be a closed polygon representing the limits of the structure, and must be labeled with a unique identifier (DetPond#!, Det_l, etc.).
(14) Approved storm drain symbology.
Drop Inlet Hooded
■ Grate Inlet i Single Wing Catch Basin Double Wing Catch Basin Raised Lid Yard Inlet Junction □ Box 0 Headwall Flared End Section cJ Outlet Structure
(15) Roadway specifications.
a. Survey requirements for roadway infrastructure. Accuracy requirements shall be a horizontal accuracy of< 0.1 foot for all centerlines and roadway polygons.
b. Digital drawing specifications. The following specifications shall apply to the development of all digital as-built drawings pertaining to new roadways.
1. Roadway centerlines shall be drawn from intersection to intersection and should not continue beyond the intersection points.
2. Roadway polygon edges should be drawn from the right-of-way to the right-of-way.
3. Intersecting road polygons should meet at the point of centerline intersections.
4. All edges on polygons must be snapped together at the vertices. Gaps in polygon boundaries will not be accepted.
5. Roadway polygons should be completely enclosed.
6. All roadway centerlines shall be labeled with the road name and right-of-way width.
(16) Proper method of segmenting roadway polygons.
Polygon 1 Polygon 2 Polygon 3 T-Street Polygon 1 Polygon 2 Polygon 4 Polygon 3 Cross-Street
(17) Property boundary I easement specifications.
a. Digital drawing specifications. The following specifications shall apply to the development of all digital asbuilt drawings pertaining to property and easement boundaries.
1. Each property, lot, easement or greenspace parcel must be an enclosed polygon.
2. Each enclosed polygon shall be labeled with a unique identifier (lot number, etc.).
3. All edges on polygons must be snapped together at the vertices. Gaps in polygon boundaries will not be accepted.
(18) Impervious surface specifications (nonsingle family residential only).
a. Digital drawing specifications.
Survey Accuracy Requirements for Impervious Surfaces.
Accuracy requirements shall be a horizontal accuracy of< 0.25 foot.
The following specifications shall apply to the development of all digital as-built drawings pertaining to impervious surfaces.
1. Impervious surface polygons must be closed.
2. Each impervious surface polygon must be labeled with a unique identifier (Imp_Surf#l, IS_l, etc.).
(Ord. No. 0-2006-32, §§ 1-3, 11-28-2006; Ord. No.
0-2007-14, § 17(Exh. A), 7-24-2007)