(a) Land. (1) The lawful use of land existing at the time of the enactment of the ordinance from which this chapter is derived, although such use does not conform to the provisions of this chapter, may be continued; provided, however, that no such nonconforming use shall be enlarged or increased, nor shall any nonconforming use be extended to occupy a greater area of land than that occupied by such use at the time of such enactment; and provided further that no such use is subject to any moratorium which might apply to said use. (2) If such nonconforming use shall be discontinued for a continuous period of 90 days, any future use of such land shall be in conformity with the provisions of this chapter. (b) Buildings. (1) The lawful use of a building or structure existing at the time of the enactment of the ordinance from which this chapter is derived may be continued, although the building use does not conform to the provisions of this chapter. (2) The lawful use may be extended throughout the building, provided no structural alterations, except those required by law, ordinances, or ordered by an authorized officer to assure the safety of the building, are made therein. Should any interior extension of the use include loft apartments or similar material building changes, the provisions governing these changes in this chapter shall apply. (3) No use shall be extended to occupy any land outside the building. (4) If the nonconforming building is removed or the nonconforming use of such building is discontinued for a continuous period of 90 days, every future use of the building shall be in conformity with the provisions of this chapter. (c) Destroyed buildings. If a nonconforming building or structure suffers damage which does not exceed 50 percent of its fair market value immediately preceding such damage, the building or structure may be reconstructed and reused (as before) if completed within 12 months from the time such damage occurred. If such damage is greater than 50 percent of its fair market value immediately preceding the damage, the building or structure may only be reconstructed and used in conformity with the standards and requirements for the district in which it is located. Otherwise, it must be removed at the owner's expense within six months from the time such damage occurred. (d) Projects under construction. Nothing in this chapter shall be deemed to require any change in the plans, construction or designated use of any building upon which actual construction was lawfully begun prior to the adoption of the ordinance from which this chapter is derived and upon which actual building construction has been diligently carried on; provided that the building shall be completed within one year from the date of passage and publication of the ordinance from which this chapter is derived and is not the subject of a proper enacted moratorium.