Skip to content
Georgia Commons
Menu

Rome · Charter

Part - CHARTER / Article 3 - CITY MANAGER

Section 3-3. Control and supervision of public property and construction.

About this text

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

It shall be the duty of the city manager, and he is given full power and authority, to improve, keep in repair, light, sprinkle and clean, as far as the same is possible within the appropriations made by the commission for such purposes, the streets, sidewalks, crossings, bridges, lanes, alleys, waterworks, public buildings and grounds, sewers, drains and other property of the city, except where

otherwise provided in this charter, either by contract or by agents and employees of the city, and shall have authority to purchase all necessary materials and implements for any and all such work to be done, and shall also have complete control

and authority over any new construction work of any kind which may be determined upon and ordered by the commission. The city commission shall determine and pass resolutions providing for

all new construction work upon the streets, sidewalks, crossings, bridges, lanes, alleys, sewers, drains, waterworks, public buildings and grounds,

and other public property, and shall also specify the character and quality of materials to be used, and the work to be done under the supervision and control of the city manager. In the event any work is done by contract under the provisions of this section, such contract shall be made after advertisement once a week for two (2) weeks for proposals, with the right reserved to reject any and all proposals; and in the event of any contract

being made, the contractors shall execute a bond payable to the City of Rome, in an amount equal to the contract price, by a surety company authorized to do business in this state, conditioned for the faithful performance of the contract. Before

beginning to pave or otherwise improve any street, the commission shall fix and designate the location and position for telegraph, telephone, electric light and power and street-railway poles and wires

and gas pipes thereon, and shall have power and authority to require the owners or persons using same to place the same as thus located.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rome/charter/3-3@2026-01-26-79e197cab6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Rome Charter, Section 3-3. Control and supervision of public property and construction | Georgia Commons