a. The maximum slope for all fill or cut slopes shall be 2:1. b. The depth of cut shall be construed to be the maximum cut or fill occurring in any one section of cut or fill. The slope on cut or fill shall be uniform throughout for each section of cut or fill. When a cut is made in rock that requires blasting, slope may be changed to vertical slope upon the written approval of the appropriate City or County Engineer.