6.15.3. Stormwater Management Plan.
About this text
- As published by Municode, current through 2026-01-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. The Stormwater Management Plan shall be prepared under the supervision of, and certified by, a professional engineer registered in the state and consistent
with all provisions of the most currently adopted local stormwater management
ordinance. The Stormwater Management Plan shall also address Water Quality as required by General NPDES Stormwater Permit No. GAG610000, or
the currently adopted General NPDES Stormwater Permit for the State of Georgia applicable to the City of Rome and Floyd County.
b. The Stormwater Management Plan shall include sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed development on water
resources, and the effectiveness and acceptability of measures proposed for managing stormwater runoff. The developer shall certify on the drawings that all clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the plan.
c. The minimum information submitted for support of a Stormwater Management
Plan shall be as follows:
(1) Site plan. Provide a site plan drawn to a scale of not less than one inch
equals 50 feet with the following characteristics and information:
(a) Graphic scale, north arrow, and date. The north arrow shall be identified as magnetic, true, or grid north.
(b) Vicinity map showing the site location relative to surrounding landmarks, highway intersections, rivers, and
streams.
(c) Topography showing existing and proposed elevations in accordance with the following:
1) For sites smaller than one
(1) acre in size, show the direction of drainage and spot elevations at all breaks in grade and along drainage channels or swales at selected points not more than 100 feet apart.
2) For sites of one (1) acre and larger with slopes of less than approximately two (2) percent, show contours at intervals of not more than two feet and spot elevations at all breaks in grade along drainage channels or swales at selected points not more than 100 feet apart.
3) For sites of one (1) acre and larger with slopes of more than two (2) percent, show contours with an interval of not more than five (5) feet.
4) Elevations shall be based on the datum plane established by the United States Coastal and Geodetic Survey.
(d) Delineation of property lines and deed record names of adjacent property owners.
(e) Locations and right-of-way of streets, roads, railroads and utility lines, either on or adjacent to the property to be developed. Specify whether utility lines are in easements or rights-of-way and show the location of towers and poles.
(f) Size and location of existing sewers, water mains, drains, culverts or other underground facilities within the tract or within the right-of-way of streets or roads adjoining the tract. Grades and invert elevations of sewers shall be shown.
(g) Location of existing buildings and other improvements.
(h) Proposed conditions:
1) Layout of proposed streets, roads, alleys, drives, paved areas and public crosswalks, with widths and road names or designations.
2) Preliminary plans of storm sewer system with grade, pipe size and location of outlet.
3) Location of proposed buildings and other improvements.
4) Certification by a registered land surveyor or professional engineer attesting that the site plan has been prepared in conformity with the minimum standards of this Section.
(2) An adequate drainage system for the property or development, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be
provided for the proper drainage of all surface water. The location and size of all proposed drainage improvements shall be designed in accordance with and meet all standards relating to Stormwater Drainage under Article 6 of this Development Code. The Stormwater Management plan shall include:
(a) Location and profiles of all storm drainage pipes and slopes of receiving channels.
Hydraulic grade lines to be shown on all pipes that cross streets and on all detention basin outfalls.
(b) Stormwater detention facility design and construction details.
(c) Location and typical construction details of all inlets and catch basins, headwalls and
other drainage structures.
(d) The 100-year ponding limits above each street cross drain.
(e) The hydrologic and hydraulic analysis required for the system design under Article 6.15.4.
(f) When required by the Director of Public Works, provides a soils investigation for all sites proposed as ponds or impoundments or for stormwater detention. Locate all soil borings on the site plan required in section 6.15.3a(1) above.
(g) Provide a reconstruction schedule for both temporary and permanent facilities. Reference the schedule to other development activities such as
clearing, rough grading, construction, final grading, and vegetation establishment.
(h) Provide a plan for maintenance of the Stormwater and/or Water Quality facilities. Describe specific actions and a recommended schedule of maintenance required to
maintain the facilities at a satisfactory level of service. All Stormwater and/or Water Quality Facilities which will not be maintained by the City of Rome,
or Floyd County, will require a Stormwater Facility Maintenance Agreement to be executed and placed on record in the Office of Clerk of Superior Court of Floyd County prior to the issuance of a Certificate of Occupancy for the project, or the approval of a Final Plat.
(i) Provide a cost estimate for construction of the Stormwater/ Water Quality management facilities. Provide a separate estimate of the annual cost for maintenance of the proposed facilities.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.