--- title: Rome Zoning Ordinance, 6.15.4. Hydrologic and hydraulic analysis collection: local-codes id: local-code:rome/zoning/6.15.4 cite_as: Rome, Ga., Zoning Ordinance ยง 6.15.4 canonical_url: https://georgiacommons.org/code/local/rome/zoning/6.15.4 md_url: https://georgiacommons.org/code/local/rome/zoning/6.15.4.md text_url: https://georgiacommons.org/code/local/rome/zoning/6.15.4/text source_url: https://library.municode.com/ga/rome/codes/code_of_ordinances date: 2026-01-26 status: active jurisdiction: city:rome jurisdiction_name: Rome place_fips: "1366668" corpus_version: local-codes-rome-05fce873fc1b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/rome/zoning/~appendix-b/~article-6.md previous: https://georgiacommons.org/code/local/rome/zoning/6.15.3.md next: https://georgiacommons.org/code/local/rome/zoning/6.15.5.md index: https://georgiacommons.org/code/local/rome.md branch: zoning edition: As published by Municode, current through 2026-01-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:rome/zoning/6.15.4@2026-01-26-17e4ce3738 --- # Rome Zoning Ordinance, 6.15.4. Hydrologic and hydraulic analysis > As published by Municode, current through 2026-01-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 6 - SUBDIVISION AND PROJECT STANDARDS a. Analyses and design shall be performed in accordance with the publication entitled #Manual for Erosion and Sediment Control in Georgia# published by the Soil and Water Conservation Commission, and the most recent edition of the #Georgia Stormwater Management Manual.# b. In order to obtain a Development Permit, a hydrology report shall be prepared that includes appropriate calculations for the 2-year, 10-year, 25-year, and 100-year design frequency storms. The report shall show detailed calculations indicating the formula used, along with co-efficient of run-off, the time of concentration, the rainfall intensity, the discharge velocity, and the source of all data used. c. The hydrology report shall include a map outlining the areas and showing the acreage of all on-site and off-site drainage basins contributing flow through the project for both the pre- and post- development conditions. d. Runoff peak rate of discharge for drainage areas up to 50 acres in size may be calculated using the Rational Method. Flows from drainage areas larger than 50 acres in size shall be calculated using the SCS Method. e. Rainfall intensities used in hydrologic analyses shall not be less than those shown by applicable rainfall curves published within the most recent edition of the #Georgia Stormwater Management Manual.# f. Runoff coefficients used for pre- and postdevelopment activity conditions for the Rational Method shall be consistent with local conditions. For the SCS method, the runoff curve numbers found in the most recent edition of the #Georgia Stormwater Management Manual.# g. Hydraulic capacity for open channel flow, pipes, and ditches shall be determined using the Manning Equation. h. The controlled release of stormwater runoff shall be required for all developments or construction in order to prevent any increase in excess of 10 percent of 1 cubic foot per second of the predevelopment rate of runoff for a ten-year frequency storm. Where controlled release is required, such releases shall prevent any increase in the predevelopment rate of runoff of less frequent storms up to and including the 100-year storm event.