--- title: Rome Zoning Ordinance, 6.15.7. Stormwater performance surety collection: local-codes id: local-code:rome/zoning/6.15.7 cite_as: Rome, Ga., Zoning Ordinance ยง 6.15.7 canonical_url: https://georgiacommons.org/code/local/rome/zoning/6.15.7 md_url: https://georgiacommons.org/code/local/rome/zoning/6.15.7.md text_url: https://georgiacommons.org/code/local/rome/zoning/6.15.7/text source_url: https://library.municode.com/ga/rome/codes/code_of_ordinances date: 2026-01-26 status: active jurisdiction: city:rome jurisdiction_name: Rome place_fips: "1366668" corpus_version: local-codes-rome-05fce873fc1b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/rome/zoning/~appendix-b/~article-6.md previous: https://georgiacommons.org/code/local/rome/zoning/6.15.6.md next: https://georgiacommons.org/code/local/rome/zoning/6.15.8.md index: https://georgiacommons.org/code/local/rome.md branch: zoning edition: As published by Municode, current through 2026-01-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:rome/zoning/6.15.7@2026-01-26-9c04375b96 --- # Rome Zoning Ordinance, 6.15.7. Stormwater performance surety > As published by Municode, current through 2026-01-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 6 - SUBDIVISION AND PROJECT STANDARDS a. Upon approval of the Stormwater Management Plan, but before the issuance of a building permit or subdivision plat approval, the applicant shall be required to post a performance bond, cash escrow, certified check, or other acceptable form of performance. b. The amount of the surety shall not be less than the total estimated construction cost of the facilities required by the Stormwater Management Plan. c. The performance bond or other securities shall not be released until the following requirements have been met. The Director of Public Works shall: (1) Perform a final inspection of the facilities and determine that they have been constructed in compliance with the Stormwater Management Plan. (2) Determine that all provisions of the Stormwater Management Plan have been faithfully executed. d. A provision may be made for partial release of the amount of the bond pro rata upon completion and acceptance of various stages of development as specifically delineated, described and scheduled in the Stormwater Management Plan. The applicant shall notify the Public Works Department upon completion of each stage that is ready for inspection.