6.4.7. Acceptance of public improvements.

About this text

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. If construction of any required public improvements was deferred at the time

of final plat approval, said work must be completed during the one-year

maintenance period for the subdivision.

b. Prior to end of the maintenance period, a final acceptance inspection of the public improvements shall be conducted by the

Public Works Department.

c. The owner must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to approximate the as-built condition of the improvements.

d. Upon certification by the Public Works Director that the public improvements

depicted on the as-built surveys are in conformance with the specifications of this Development Code and are in good repair, the Governing Body shall accept the public improvements into perpetual maintenance.

(Ord. No. 01-7-2, § I, 7-16-01; Ord. No. 02-9-2, §§ III—VI, 9-3-02; Ord. No. 2017-11-2, § I, 11-27-17)

6.5. Subdivision design standards.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rome/zoning/6.4.7@2026-01-26-64ec6db29f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Rome Zoning Ordinance, 6.4.7. Acceptance of public improvements | Georgia Commons