Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 6 - SUBDIVISION AND PROJECT STANDARDS

6.7.9. Storm drainage.

About this text

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. Street Cross Drains or Culverts.

(1) Pipe size for culverts under streets (street cross drains) shall be determined by design runoff and hydrau-

Art. 6, 6. 7.9 ROME CITY CODE

lie capacity. The minimum allowable C.

street cross drain diameter shall be d. 18 inches, with a minimum slope of one percent.

(2) Street cross drains shall be con - structed of Class III reinforced concrete.

(3) Street cross drains shall be sized to handle the runoff of a 25-year, 24- hour storm. Cross drains shall be designed to handle the peak rate of discharge associated with a 100-year storm with at least one foot of freeboard from the top of the roadway shoulder.

(4) Velocity at design flow shall be sloped so as to maintain a minimum velocity of at least three feet per second e.

but not more than the velocity that would cause erosion damage to the conduit.

(5) Street cross drain design is to be in accordance with the methods contained in the State Highway Standard 1030D, latest edition.

(6) Street cross drains carrying live streams shall extend to where the crown of the pipe intersects the street embankment slope and shall have flared end sections with a one-foot wide collar of six inch thick concrete.

(7) Maintain full shoulder width across all cross drains as the minimum length.

(8) Street water shall be limited to a maximum distance as follows: 400 feet on grade up to seven percent;

300 feet on grades from seven to ten percent; 250 feet on grade over ten percent.

(9) Bridges shall be designed to span a 100-year storm frequency.

(10) Junction boxes having access to the pipe shall be constructed to meet the requirements of Georgia DOT Standard 1030D (or most current).

b. Reserved.

Reserved.

Traffic and Erosion. Before any traffic over a storm drain is allowed the developer shall provide an adequate depth and width of compacted backfill to protect the

structure from damage or displacement.

The developer shall remove any debris or silt that constricts the flow through a pipe as often as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted. Any damage

or displacement that may occur due to traffic or erosion shall be repaired or corrected at the developer's expense. The developer's obligation to clean and repair pipes ceases after acceptance of the system by the proper authority.

Inlets and Catch Basins.

(1) Inlets and catch basins shall be designed in accordance with the Georgia Department of Transportation's Drainage Manual for Highways, latest edition and in accordance with the Standard Drawings.

(2) Frames and grates shall be as selected by the Public Works Director based upon site conditions.

(3) Stormwater catch basins shall be spaced as approved by the Public Works Department.

(4) Catch basins shall be located at all low points of streets and as approved by the Public Works Department.

f. Piped Systems.

(1) Design runoff and hydraulic capacity shall determine pipe size. The minimum allowable pipe diameter

shall be 18 inches under a street and 15 inches under a driveway.

(2) Minimum Clearances. Minimum clearances are: One foot between the bottom of the roadway base and the exterior crown of the culvert, and a minimum of six inches between underground utilities and exterior crown of culverts.

(3) Trench Construction. Trench construction for storm drainage pipe shall be in accordance with standard

drawings.

( 4) Storm drainpipes shall be constructed of Class III reinforced concrete or aluminized Type II or steel corrugated culvert.

(a) Concrete Pipe.

1) Concrete pipe shall be reinforced within the rightof-way but may be plain pipe outside of the rightof-way.

2) Flat bottom and circular pipe sections shall be laid in a prepared trench with the socket ends pointing upstream. Sections shall be joined in accordance with manufacturer's recommendations.

(b) Corrugated Aluminum or Steel Pipe.

1) Metal pipe shall be fully bituminous coated.

2) Corrugated aluminum or steel pipe and pipearches sections shall be laid in a prepared trench with outside laps of circumferential joints pointing upstream and with longitudinal joints at the

C.

sides. Coupling bands, fastened by two or more bolts, shall join the sections. The

space between adjoining sections shall be not more than the width of one corrugation.

3) All damaged spots in galvanized coating that expose the base metal shall be repaired before the

structure is backfilled. All damaged spots in bituminous coating that expose the base metal shall be re-coated with asphalt before the structure 1s backfilled.

PVC or HDPE Plastic Pipe.

1) PVC and HDPE plastic pipe shall be seamless with a smooth inner wall and corrugated outer wall. PVC pipe shall meet the requirements ofASTM F949.

HDPE pipe shall meet the r equirements of AASHTO M252 or M294, Type S.

The pipe shall be manufactured as a single extru - sion with annular corrugations. Joints shall be bell and spigot type with

elastomeric gasket seals.

2) Plastic pipe shall be laid in a prepared trench and adjusted to grade in accordance with ASTM D2321.

Connections to manholes or other structures shall be made with a flexible connector secured with stainless steel bands, or grouted in place according to the manufacturer's recommendations.

(d) Elongation. Elongation of metal pipes shall be as shown on the plans. The contractor shall or- der the elongation of the vertical axis of the pipe to be done in the shop. Corrugated metal pipe

shall be shipped with wire-tie in the pipe ends. Wire-ties shall be removed as soon as possible after the fill is completed.

(5) The design of piped storm water collection systems shall be based upon conveyance of the peak rate of discharge associated with a 25-year, 24-hour storm.

(6) Storm water pipes that do not carry live streams shall extend at least 50 feet beyond the front building setback lines, and may be required to extend farther where necessary to

provide an adequately protected building site on the property.

(7) Any storm drainage pipe dedicated to the public that extends outside of the street right-of-way shall be located within a 20-foot wide easement.

g.

(11) Under no circumstances shall structures be constructed over an existing or proposed storm drain, whether

public or private.

(12) Maximum continuous length of pipe shall be 300 feet.

Headwalls

(1) Headwalls or flared end sections with concrete collars are required at the inlet and outlet on all street cross drains and storm drain pipes.

(2) Headwalls are to be pre-cast concrete, stone masonry with reinforced concrete footings, or poured-in-place,

reinforced concrete with reinforced concrete footings.

(3) Flared end sections shall be constructed of the same material as the drainage pipe to which they are being connected.

(4) High water elevation contour is to be based on a 25-year storm at the entrance of each head wall.

(5) Energy dissipation devices, such as splash pads, rip-rap, stilling basins, etc., shall be provided at the outlet of every street cross drain and storm drainpipe.

(8) All storm drainage pipes shall be at least 18 inches below the surface and shall h ave a slope of at least one per cent. Subdrainage will be installed to control the surplus ground water by intercepting sidehill seepage or by lowering or regulating the ground water level where such conditions exist.

h . Open Channels.

(9) Pipe bedding shall be provided as specified in Design and Construction of Sanitary and Storm Sewers, prepared by the American Society of Civil Engineers (Manuals and Reports on Engineering Practice No.

37), latest edition.

(10) Development storm drain outlet systems shall connect to a public stormwater conveyance system or to

a free-flowing stream. The developer shall be required to provide evidence of acceptable capacity to receive additional flow.

(1) All storm water channels shall be designed to carry at least the 25- year frequency storm with one foot of freeboard.

(2) Velocity at design flow shall be not less than six inches per second but not greater than four feet per second. A high er velocity may be allowed if actions are taken that would avoid erosion or scouring of the channel.

(3) All storm water channels must be designed to convey flows that prevent dwelling flooding, property damage, or public access and/or utility interruption.

(4) The Public Works Director may determine that the expected long-term maintenance of a surface drainage

system could prove impractical, and a storm water pipe collection system may be required.

(5) Any storm drainage channel that extends outside of the street rightof-way shall be located within a 20- foot wide easement.

(6) In cases in which a subdivision or development is traversed by a stream, there shall be provided an easement extending ten feet from each side of the stream bank.

(7) All drainage easements, natural ditches, and drainage areas shall be grassed and/or rip-rapped as necessary to control erosion.

(8) Cross drains under driveways shall meet the standards for street cross drains.

History

The history line the source prints at the end of the section.

(Ord. No. 01-7-2, § I, 7-16-01; Ord. No. 03-7-10, § I, 7-21-03; Ord. No. 2003-10-5, § I, 10-6-03)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rome/zoning/6.7.9@2026-01-26-96597fca4f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Rome Zoning Ordinance, 6.7.9. Storm drainage | Georgia Commons