--- title: Rossville Zoning Ordinance, Section 74. Water supply system collection: local-codes id: local-code:rossville/zoning/74 cite_as: Rossville, Ga., Zoning Ordinance ยง 74 canonical_url: https://georgiacommons.org/code/local/rossville/zoning/74 md_url: https://georgiacommons.org/code/local/rossville/zoning/74.md text_url: https://georgiacommons.org/code/local/rossville/zoning/74/text source_url: https://library.municode.com/ga/rossville/codes/code_of_ordinances date: 2024-06-12 status: active jurisdiction: city:rossville jurisdiction_name: Rossville place_fips: "1367256" corpus_version: local-codes-rossville-5bbce259c575 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/rossville/zoning/~appendix-a/~article-vii.md previous: https://georgiacommons.org/code/local/rossville/zoning/73.md next: https://georgiacommons.org/code/local/rossville/zoning/75.md index: https://georgiacommons.org/code/local/rossville.md branch: zoning edition: As published by Municode, current through 2024-06-12 edition_date_kind: current_through source_publisher: Municode version_id: local-code:rossville/zoning/74@2024-06-12-5976bfb9e5 --- # Rossville Zoning Ordinance, Section 74. Water supply system > As published by Municode, current through 2024-06-12 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - RESERVED / Article VII - REQUIRED IMPROVEMENTS Each lot or other site in a subdivision shall be connected to a public water supply system by lines of sufficient size to accommodate the anticipated water demand. Lot service connections shall be stubbed in so that there will be no necessity for cutting into any pavement in order to make any future connections. Three copies of the plan of the water supply system of the subdivision, showing the seal of a registered professional engineer, shall be submitted to, checked and approved by the planning commission prior to installation. Said system shall be designed in accordance with standard engineering practice. Arrangements for the installation of the water system are the responsibility of the subdivider.