Sec. 22-36. Water supply and fire flow adequacy study required for permit issuance.

About this text

  • As published by Municode, current through 2026-03-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A water supply and fire flow adequacy study indicating sufficient water flow and pressure to serve both fire protection and domestic needs is required before the city will issue any of the following approvals:

(1) A development, land disturbance, or building permit for any multi-unit and single-unit attached projects.

(2) Any approval for a project that includes new or extended public water mains.

(3) Any approval for a project that the city engineer or fire marshal determines may significantly affect the water system.

For these projects referenced above in (1), (2), and (3), the city shall not issue a developFIRE PREVENTION AND PROTECTION § 22-36 ment permit, land disturbance permit, building permit, subdivision approval, site plan approval, or certificate of occupancy, until a water supply and fire flow adequacy study has been completed, submitted, and approved by the city. Rezoning and conditional use approvals shall not require a full water supply and fire flow adequacy study; however, the applicant shall provide conceptual water/ fire capacity information as requested by staff. A full study shall be required prior to issuance of a land disturbance permit or building permit for projects meeting

thresholds referenced in (1), (2), and (3), above. The water study and fire flow adequacy study shall not be required for any project that can show water supply is fed directly by a 48-inch water main. The city may, at its discretion, require a review of the study to be completed by a firm designated by staff;

in such instances, the applicant shall contract the services of the designated firm directly and shall be solely responsible for all fees and other costs associated with this process.

All testing, analysis, modeling, and reporting required as part of the water supply and fire flow adequacy study must comply with the city's adopted water supply and fire flow adequacy study technical manual, as it may be amended from time to time.

History

The history line the source prints at the end of the section.

(Ord. No. 2026-03-003, § I, 3-3-2026)

Meetings that refer to this section

Found 1: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:sandy-springs/code/22-36@2026-03-17-d9749919c5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Sandy Springs Code of Ordinances, Sec. 22-36. Water supply and fire flow adequacy study required for permit issuance | Georgia Commons