Skip to content
Georgia Commons
Menu

Savannah · Charter

Division I - THE CHARTER AND RELATED LAWS / Article 7 - MUNICIPAL UTILITIES / Chapter 2 - SEWERS

Section 7-207. Apportionment of storm drain construction costs.

About this text

  • As published by enCodePlus, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The ratio which the breadth or face of any lot abutting on the line of any such storm drain bears to the length of such drain on said line shall be the ratio of computation of the amount to be assessed upon the owner of such lot as his pro rata of expense in the construction of such drain, it being understood that the total cost of construction of a primary drain shall be divided between the owners of the lots abutting on both sides of the street or lane, or portion thereof, through which said primary drain shall have been constructed; provided, that when a primary drain lies abreast of one front of any lot, and a cross or trunk drain shall be constructed along another front of the same lot, no assessment shall be made upon said lot except for its pro rata apportionment of the cost of such primary drain; and provided further, that in the case of said larger cross drains or main trunk outlets, such assessments shall be distributed between the lot owners and the corporation as provided for in the preceding section.

History

The history line the source prints at the end of the section.

(1884-85 Ga. Laws, page 294, § 3)

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/charter/7-207@2026-11-14-d2aad07606

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.