3.19.7. Review by the Planning Director

About this text

  • As published by enCodePlus, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. Review Responsibility The following shall be reviewed by the Planning Director:

i. Minor changes to contributing and noncontributing resources including color changes, window and door replacement (provided the opening size remains the same), roof replacement and shutter installations;

ii. A material change to, or the new construction of walls, fences, screens or paving;

iii. The erection, placement or alteration of any non-illuminated sign exceeding three (3) square feet except for those identified in Sec. 3.19.8.a.ii.; and

iv. The erection, placement or alteration of awnings.

b. Review Criteria The Planning Director shall review and take final action on the proposed Certificate of Appropriateness by applying the applicable standards and criteria below. Depending on the specific nature of the proposed material change, one or more of the standards and criteria below may apply (see application for more information on which standards and criteria to apply).

i. The design standards and visual compatibility criteria established for the district as provided in Sec. 7.8, Savannah Downtown Historic Overlay District;

ii. The Secretary of the Interior’s Standards and Guidelines for Rehabilitation, where applicable;

iii. The sign criteria in Sec. 9.9, Signs;

iv. The relocation or demolition standards identified in Sec. 3.19.9;

v. Development standards within applicable zoning districts as identified in Article 5.0 Base Zoning Districts; and/or

vi. Accessory structure and accessory dwelling unit standards in Sec. 8.7.

c. Special Exceptions\ The Planning Director shall be permitted to grant certain adjustments as identified in Sec. 3.12.2.a.ix. – xi., Special Exceptions.

d. Action by the Planning Director Based on the applicable review criteria, findings shall be provided with the following action which shall indicate if the application should be:

i. Approved as proposed by the applicant within 45 days of receipt of a complete application;

ii. Approved with modifications or conditions within 45 days of receipt of a complete application;

iii. Denied; or

iv. Referred to the Historic Board of Review at the discretion of the Planning Director. Public notice shall be consistent with Sec. 3.2, Public Notice.

History

The history line the source prints at the end of the section.

(Ord. of 05-14-2020(39), § 1, Ord. of 3-12-2026(11), § 1)

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/zoning/3.19.7@2026-11-14-dbfeeedcd6