--- title: Savannah Zoning Ordinance, 3.8.2. Development Review Process collection: local-codes id: local-code:savannah/zoning/3.8.2 cite_as: Savannah, Ga., Zoning Ordinance ยง 3.8.2 canonical_url: https://georgiacommons.org/code/local/savannah/zoning/3.8.2 md_url: https://georgiacommons.org/code/local/savannah/zoning/3.8.2.md text_url: https://georgiacommons.org/code/local/savannah/zoning/3.8.2/text source_url: https://online.encodeplus.com/regs/savannah-ga/doc-view.aspx?secid=6683&h=1 date: 2026-11-14 status: active jurisdiction: city:savannah jurisdiction_name: Savannah place_fips: "1369000" corpus_version: local-codes-savannah-495e0c8a3648 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/savannah/zoning/~article-3.0.md previous: https://georgiacommons.org/code/local/savannah/zoning/3.8.1.md next: https://georgiacommons.org/code/local/savannah/zoning/3.8.3.md index: https://georgiacommons.org/code/local/savannah.md branch: zoning edition: As published by enCodePlus, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: enCodePlus version_id: local-code:savannah/zoning/3.8.2@2026-11-14-858a354586 --- # Savannah Zoning Ordinance, 3.8.2. Development Review Process > As published by enCodePlus, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Article 3.0 - Application and Review Procedures / 3.8 - Development Plan Review The Development Plan Review process has been divided into two phases: Development Review and Construction Review. This Ordinance is primarily focused on Development Plans. 1. Development Plans consist of general development plans, specific development plans and group development plans. This phase of review focuses on aspects of development that does not require construction level design drawings. Development Plans are typically reviewed and approved before developers move on to the construction design phase. This ensures projects have the appropriate use for any given location before more detailed drawings are required. *Commentary: Elements that may be part of a Development Plan include but are not limited to land use information, spatial layouts, parking, density, landscaping, lighting, access management, and signage.* 2. Construction Plans are required to be reviewed and approved prior to the issuance of site development permits or building permits. Construction plans are reviewed by City staff under the coordination of the City Manager or his or her designee. The review process for Construction Plans is not covered in detail within this Ordinance. *Commentary: Permits that require Construction Plans are site development permits, building permits, sign permits, plumbing permits, electrical permits, and mechanical permits.*