4.7.1 Location. The following utilities shall be located underground to the extent possible: potable water supply and distribution systems; wastewater collection, treatment, and disposal; irrigation, cable television, telephone, broadband multi-use transmission; and, other utility services. Power distribution systems shall be located underground except for the existing utility corridor and the overhead power lines located on Little Neck Road, Georgia Highway 204, and John Carter Road. Underground utilities can be placed within the Road and Perimeter setbacks (as defined in Sec. 4.4.1) provided they are planned so as to accommodate the minimum 8' paved pedestrian leisure trail as well as other required buffer elements. Temporary overhead power lines shall be allowed during construction. See Figure 4.2 Typical Primary Road Buffer and Leisure Trail. 4.7.2 Utility Substations and Utility Corral Areas. These areas shall be enclosed using screening materials and methods as indicated in Figure 4.3. Landscaping and watering methods shall be required and adequacy determined by the NHDRC & City Manager or his designee. FIGURE 4.3 UTILITY SUB-STATION SCREEN FENCE & GATE NTS