Standards that are specific to the Savannah River Landing PUD may be modified, as provided in Sec. 8-3344( d)( 1) below by the Metropolitan Planning Commission.

1. Modifications. Modifications are classified as major or minor. The classification of the modification will determine the type of review.

a. Major Modifications Permitted. Major modifications require review and approval by the Metropolitan Planning Commission and are limited to the following:

i. Development Standards. Any development standard that is specific to this PUD where the minimum requirement, if any, is proposed to be reduced by 10 percent or more, or where the maximum requirement, if any, is proposed to be exceeded by 10 percent or more.

ii. Parking. A reduction in the number of parking spaces required by this Section.

b. Minor Modifications Permitted. Minor modifications require review and approval by Metropolitan Planning Commission staff. In the event that a minor modification is denied by the Metropolitan Planning Commission staff, then the matter shall be deemed a major modification and reviewed by the Metropolitan Planning Commission.

Minor modifications are limited to the following:

i. Development Standards. Any development standard that is specific to this PUD where the minimum requirement, if any, is proposed to be reduced by less than IO percent, or where the maximum requirement, if any, is proposed to be exceeded by less than IO percent.

ii. Buffers. Any buffer standard that is specific to this PUD where the minimum requirement, if any, is proposed to be reduced by less than 10 percent, or where the maximum requirement, if any, is proposed to be exceeded by less than 10 percent.

iii. Street relocation. Any relocation of a street, road or lane shown on the Master Plan or any addition of a street, road or lane not shown on the Master Plan shall be submitted to the Metropolitan Planning Commission as a Site Development Plan and submitted for approval pursuant to Section 8-3033.

iv. Subdivision. Any subdivision or recombination of lots shall be submitted to the Metropolitan Planning Commission as a Site Development Plan and submitted for approval pursuant to Section 8-3033.

2. Variances. A denial of a decision by the Metropolitan Planning Commission with respect to matters described in Sec. 8-3347(1) may be appealed to the Board of Appeals and the variance process shall follow the procedure established in Article H (Board of Appeals).

3. Site Development Plan. A Site Development Plan shall be required for each proposed development within the PUD which shall be consistent with the Master Plan. The criteria for submittal shall be the same criteria as set forth in the Planned Unit Development District pursuant to Sec. 8-3033. Any Site Development Plan submitted to the Metropolitan Planning Commission must be accompanied with a written approval from the master developer.

History

The history line the source prints at the end of the section.

(Ord. of 4-27-2017(13), § 1)

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/zoning/8-3347@2026-11-14-f4ebac7214

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Savannah Zoning Ordinance, Sec. 8-3347. Modifications and Variances to the Adopted PUD | Georgia Commons