Review procedures vary by the type of WCF facility proposed. Where due to the complexity of the methodology or analysis required to review an application for a WCF requiring radio frequency analysis, the Planning Director may require a technical expert review as described in Sec. 8.9.13 Review procedures are as follows: Table 8.9-4 Review Responsibility by Facility Type Facility Type | Review Responsibility | Other Considerations Concealed Attached | Planning Director Collocation or Combined on Existing Antenna Support Structure | Planning Director Non-concealed Attached | Planning Director | Planning Commission review required if proposed in a recognized historic area. Concealed Freestanding | Planning Commission Non-concealed Freestanding | Planning Commission | Not allowed within a residential district, a recognized historic area as identified in Sec. 8.9.5.g, within 100 feet of either, or within a scenic vista or landscape as identified in Sec. 8.9.5.h. Modification | Planning Director Exceptions to the Above Facilities A request for any waiver identified in this Section | Planning Commission Replacement or reconstruction of existing antennas and monopoles | Planning Commission | Sec. 8.9.9