Savannah · Zoning Ordinance
Article 8.0 - Use Standards / 8.9 - Wireless Communications Facilities
8.9.13. Notification
About this text
- As published by enCodePlus, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
An application that requires review by the Planning Commission (not to include reviews by the Planning Director) shall have public notice to include:
1. Mailed Notification
A notification of the date and time of the Planning Commission meeting shall be mailed to all property owners within a 300-foot radius of the proposed WCF subject property at least 15 days but no more than 45 days prior to the meeting.
2. Posting of Property
A sign shall be posted on the property to announce the date and time of the Planning Commission meeting at least 15 days but no more than 45 days before the meeting. The sign shall be posted to face the most traveled right-of-way.
3. Published Notification
For Local System Master Plans, posted notice is required for each proposed installation location, as described in 8.9.12.b. Additionally, public notification is required
Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.