Skip to content
Georgia Commons
Menu

Savannah · Zoning Ordinance

Article 9.0 - General Site Standards / 9.2 - Access Management and Connectivity

9.2.14. Pedestrian Circulation and Access

About this text

  • As published by enCodePlus, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

To improve inter-parcel connectivity and pedestrian access, designated pedestrian paths shall be provided to principal uses from the street right-of-way and to adjacent properties, in accordance with the following standards.

| Figure 9.2-2 Pedestrian Access | |----| | |

1. Access from Public Rights-of-Way

A pedestrian path shall be provided where any building entrance open to the public or principal on-site destination for any multi-family, commercial or mixed-use development is located more than 100 feet from any property line that is adjacent to a public street. Access onto the site shall be provided in accordance with the following:

1. Separation shall not exceed 300 linear feet between pedestrian paths and/or between pedestrian paths and any property line which forms an intersection with a street right-of-way; and 2. Pedestrian paths shall be located as to provide the shortest route of travel from the public sidewalk or street right-of-way to the building entrance or principal on-site destination.

2. Connectivity 1. Multifamily, commercial and mixed-use developments which contain more than one (1) principal use and/or building may provide walkways between the principal entrances of the uses and/or buildings; 2. Within any Residential Multi-family, Office and Institutional, Business, Industrial or Planned Development zoning district, all multi-family, commercial and mixed-use developments may provide pedestrian path connections within cross-access easements to serve outparcels and/or adjacent multi-family, commercial and mixed-use developments. Furthermore, where an adjacent property is undeveloped a pedestrian path connection and cross access easement may be provided, regardless of the zoning district. 3. All pedestrian paths may be constructed and stubbed to the property line. Future development of an adjacent property may complete the connection to such existing stub-out. Where the adjacent property is developed and a stub-out has been provided, the proposed development may connect to the stub-out. A recorded cross-access easement shall be required prior to the issuance of a building permit. 4. Pedestrian paths shall be clearly identified on the site development plan.

3. Design Standards 1. Pedestrian paths shall meet City lighting standards as required by the Traffic Engineering Site Plan Review Manual and be physically separated from driveways and parking spaces by landscaping, barriers, grade separation or other means to protect pedestrians from vehicular traffic. 2. Pedestrian paths shall be a minimum of four (4) feet of unobstructed width and be constructed of a material approved by the City Manager or his or her designee.

4. Waiver or Modification

The City Manager or his or her designee may waive or modify the requirements when one of the following situations exists:

1. Any improvement which would create an unsafe condition or security concern; 2. There are topographical constraints, or existing structures effectively block access; 3. The land use would not generate the need for pedestrian access; or 4. The public is not allowed access to the subject land use.

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/zoning/9.2.14@2026-11-14-54cbc30d36

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Savannah Zoning Ordinance, 9.2.14. Pedestrian Circulation and Access | Georgia Commons