Skip to content
Georgia Commons
Menu

Savannah · Zoning Ordinance

Article 9.0 - General Site Standards / 9.8 - Lighting

9.8.5. Lighting Plan Required

About this text

  • As published by enCodePlus, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A lighting plan shall be submitted and shall demonstrate the following:

1. Existing, if any, and proposed lighting fixture types and locations on the site; 2. The manufacturer’s specifications for each newly proposed outdoor light fixture; 3. The proposed height of each outdoor light fixture; 4. The calculated post-development foot-candles. Such measurement shall be taken at ground level, with the light-registering portion of the meter held parallel to the ground pointing up, and shall be measured at no more than a 10 square foot grid that covers the development site up to the property line; and 5. The lighting plan shall meet IESNA (Illuminating Engineering Society of North America) standards.

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/zoning/9.8.5@2026-11-14-5011b1bbbb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Savannah Zoning Ordinance, 9.8.5. Lighting Plan Required | Georgia Commons