4.7.1 Location. The following utilities shall be located underground to the extent possible: potable water supply and distribution systems; wastewater collection, treatment, and disposal; irrigation, cable television, telephone, broadband multi-use transmission; and other utility services. Power distribution systems shall be located underground except for the existing utility corridor and the overhead power lines located on Little Neck Road and Bush Road. Underground utilities can be placed within the buffers and setbacks (as defined in Section 4.4.1) provided they are planned so as to accommodate the minimum 8' paved pedestrian leisure trail as well as other required buffer elements. Temporary overhead power lines shall be allowed during construction. See Figure 4.2 Primary Road Buffer.