Seminole County · Zoning Ordinance
Appendix A - ZONING ZONING ORDINANCE SEMINOLE COUNTY, GEORGIA / Article IV - GENERAL PROVISIONS
Section 4.03. Only one principal dwelling per lot.
About this text
- As published by Municode, current through 2011-03-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Except as herein provided, there shall be no more than one principal dwelling per lot or parcel other than within a PUD development. However, in AG zones within the unincorporated area of Seminole County, there shall be permitted as many as four residential uses (farm-related dwellings) on any parcel of land under single ownership where the following conditions can be met:
A. The purpose for this special use is to support established farming operations located on the property being requested.
B. Each such nonprincipal residential use shall occupy a land area not less than 40,000 square feet in size.
C. Each such land area shall be so defined by permanent physical markers as to be given a numerical address and location designation.
D. Each such land area shall receive approval from the Seminole County health authorities as to its suitability as a site for an effective sanitary sewage disposal system designed to accommodate wastes generated by the user of that land site.
E. An acceptable domestic water supply shall be available to each satellite user of this special provision and such water supply shall meet local public requirements as administered by the Seminole County health authorities.
F. Each such use shall be accessible either by private drive or public roadway to the public thoroughfare system.
G. Individual power supply sources shall be provided to each user under this special provision and each utility installation shall meet such standards as have been adopted by local authorities.
H. Facilities established under this special provision for residential use shall meet the requirements of local construction and use codes established by the Seminole County Commission.
I. Permits for construction will not be issued prior to the approval of each of the aforementioned condition by the zoning administrator. In addition, any change in use or occupancy must be approved by the zoning administrator.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.