(a) Transportation infrastructure. A primary objective of the overlay as concerns Highway 85 is establishment of a "secondary road network." Such a network is intended to minimize disruption of traffic flow on Highway 85 and to provide opportunities for provision of abundant landscaping characterizing the overlay. Platting of properties being developed within the overlay shall afford construction and dedication of such a network either through provision of single loaded building sites to the rear of the secondary road or by platting of building sites along Highway 85. In either case, a 40-foot landscaped buffer or, at the developer's option, a 30-foot buffer with berming having a minimum height of four feet, shall be maintained adjacent to the Highway 85 right-of-way, encroached upon only by public streets and sidewalks. (1) It is encouraged that each site plan submitted for any development within the overlay provide for present or future dedication of right-of-way as previous platting may accommodate for construction of public roads. Such roads shall provide access to property interior to the development. Approval of any site plan for development along the proposed secondary access road shall be conditioned upon agreement of the developer of the property to fully fund the cost of construction of such proposed public road along that development's frontage. The site plan shall consider the alignment of such secondary road on adjacent parcels and shall cooperate with the city in design and layout of an efficient and economical secondary road network. (2) Upon a finding by the city engineer that a development poses inordinate traffic impacts, the applicant shall prepare a professional traffic study according to the standard traffic methodology. In addition to the general standards of the methodology, the traffic study shall include weekend traffic generation and impact analysis. The traffic study shall also evaluate all intersections nearest to the site, or any area designated by the city engineer. (b) Interparcel access. Interparcel vehicle access between all contiguous office and commercial lots is encouraged. (c) Access. All building lots along Highway 85 shall be accessed from a city road; direct access from Highway 85 shall be as determined by GDOT. No building lot shall have direct access from Highway 85 or Highway 16 unless specifically approved by the city. (1) No new driveway shall be permitted to provide ingress or egress to property on Highway 85 following adoption of this overlay, except for the purpose of serving existing lots of record. Access to Highway 16 shall be controlled by limiting the number of curb cuts, which shall not exceed two for the first 200 feet of frontage, with 24 feet being the maximum curb cut width. The number of such cuts may be increased by one for each additional 150 feet of road frontage on Highway 16. (d) Street width. Where secondary roads are approved, the combined pavement and curb and gutter width of undivided streets within the overlay shall not exceed 24 feet. (e) Parking. Unless a parking courtyard design can be achieved, off-street parking shall be uniformly distributed across the building site. In the case of freestanding buildings or shopping centers that do not have a street along the front and rear of the property, the area between the front of the building and the right-of-way shall be limited to a maximum of 25 percent of the required parking and limited to a maximum of one double row of parking. A maximum of 50 percent of off-street parking shall be located to the sides of the building, with the remaining parking located to the rear of the building. (1) Development tracts having no public right-of-way to the rear of the site and accommodating truck loading areas to the rear of the principal building shall be exempt from these requirements; however, parking located between the front of the building and the right-of-way shall be limited to a maximum of 50 percent of the required parking. (2) No parking or service areas shall be permitted within 50 feet of the property line of an adjoining residential zoning lot. Parking and service areas shall be separated from adjoining residential zoning lots using a suitable landscaped screen across the entire width of this 50-foot buffer, which may be provided in combination with a fence or wall. Installation of such fence or wall shall not be a substitute for plant materials distributed appropriately across the entire buffer. Such screening shall achieve a reasonable visual separation between the properties, subject to approval by the city administrator.