--- title: Senoia Zoning Ordinance, Sec. 74-206. Development regulations collection: local-codes id: local-code:senoia/zoning/74-206 cite_as: Senoia, Ga., Zoning Ordinance § 74-206 canonical_url: https://georgiacommons.org/code/local/senoia/zoning/74-206 md_url: https://georgiacommons.org/code/local/senoia/zoning/74-206.md text_url: https://georgiacommons.org/code/local/senoia/zoning/74-206/text source_url: https://library.municode.com/ga/senoia/codes/code_of_ordinances date: 2025-12-10 status: active jurisdiction: city:senoia jurisdiction_name: Senoia place_fips: "1369672" corpus_version: local-codes-senoia-f8909b3ca665 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/senoia/zoning/~chapter-74/~article-ix.md previous: https://georgiacommons.org/code/local/senoia/zoning/74-205.md next: https://georgiacommons.org/code/local/senoia/zoning/74-207.md index: https://georgiacommons.org/code/local/senoia.md branch: zoning edition: As published by Municode, current through 2025-12-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:senoia/zoning/74-206@2025-12-10-3f1dd75d1d --- # Senoia Zoning Ordinance, Sec. 74-206. Development regulations > As published by Municode, current through 2025-12-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 74 - ZONING TABLE OF CONTENTS / Article IX - (A). COMMERCIAL CORRIDOR OVERLAY (a) Site development. Mass grading of a site shall be prohibited and all clearing shall be subject to this article. Projects to be developed in phases shall be issued land disturbance permits for only those phases or portions of phases to be built within a subsequent 12-month period. (b) Site inspection. All required silt fence and tree protection fencing shall be installed and inspected before land disturbance commences. (c) Underground utilities. All on site utilities, including electrical lines, shall be located underground and be connected to the buildings on secondary façades. (d) Material samples. Exterior materials and colors submitted by the applicant and approved by the city shall be represented in a building mockup located on the development site prior to installation of any exterior finish. A city representative shall verify the mock up against the approved materials or provide alternative direction as required. (e) Parcel access and connectivity. An access and connectivity plan for all development in the overlay shall be subject to approval by mayor and city council. New development should seek to create parcel access and connectivity that does not rely solely on Highway 16. The goal is to reduce congestion on Highway 16 and provide efficient ingress and egress for new development. Two ways this can be incorporated into a development plan: Secondary street network and interparcel access. (f) A "secondary street network" is intended to minimize disruption of traffic flow on Highway 16 by providing new, alternative routes. Platting of properties being developed within the overlay shall afford construction and dedication of such a network either through provision of building sites accessed from secondary street or by platting of building sites along Highway 16. See Possible Secondary Street and Alley Network Figure 2.0. (1) It is required that each site plan submitted for any development within the overlay provides for present or future dedication of right-of-way as previous platting may accommodate for construction of public streets. Such streets shall provide access to property interior to the development. Approval of any site plan for development along the proposed secondary street shall be conditioned upon agreement of the developer of the property to fully fund the cost of construction of such proposed public street along that development's frontage. The site plan shall consider the alignment of such secondary street on adjacent parcels and shall cooperate with the city in the design and layout of an efficient and economical secondary street network and a minimum of a 50-foot right-of-way to be established on the property. See Street Sections Figures 3.1, 3.2, 3.3, 3.4. (2) Upon a finding by the city engineer that a development poses inordinate traffic impacts, the applicant shall prepare a professional traffic study according to the standard traffic methodology. In addition to the general standards of the methodology, the traffic study shall include weekend traffic generation and impact analysis. The traffic study shall also evaluate all intersections nearest to the site, or any area designated by the city engineer. Upon evaluation of the traffic study findings, the city may require the applicant to modify the proposed site plan to achieve more acceptable traffic impacts. (3) Street width. Where secondary streets are approved, the combined travel lane width of undivided streets within the overlay shall be as a standard ten feet wide. Parking, if incorporated, shall be as follows: parallel spaces should be no more than seven feet wide (exclusive of gutter width); or if 45 degree angled parking is incorporated, spaces should be no more than 15 feet wide (exclusive of gutter width) as measured from the curb. See Street Sections Figure 3.1, 3.2, 3.3, 3.4. (g) Interparcel access. Interparcel vehicle and/or pedestrian access between all contiguous retail, office and multi-use lots is required unless unconducive to future development, and in that case could be waived administratively. This may or may not be in addition to a newly created secondary street network (public street). If vehicular, a ten-foot minimum travel lane is required. Pedestrian access route is encouraged to accompany a vehicle access route and can be in the form of a sidewalk or path. If interparcel access is pedestrian only, access should be no less than eight feet wide and incorporate shade trees. When designing interparcel access, connection points should be coordinated with neighboring parcels. If the parcel in question is the first to develop, reasonable care should be taken to ensure that a future connection can be made from neighboring parcels. (h) Highway 16 access. All building lots along Highway 16 shall be accessed from a city street; direct access from Highway 16 shall be as determined by GDOT. No building lot shall have direct access from Highway 16 unless specifically approved by the city. A coordinated effort between adjacent properties is encouraged to promote interparcel access and reduce the total number of access points from any city street and Highway 16. (1) No new driveway shall be permitted to provide ingress or egress to property on Highway 16 following adoption of this overlay, except for the purpose of serving existing lots of record. Access to Highway 16 shall be controlled by limiting the number of curb cuts, which shall not exceed two for the first 200 feet of frontage, with 24 feet being the maximum curb cut width. The number of such cuts may be increased by one for each additional 150 feet of street frontage on Highway 16. ## History (Ord. No. 21-16, § 2, 11-15-2021)