The following utilities shall be installed and in operating condition before acceptance of the subdivision and before any paving is installed. 1102.1. Water system. All water mains shall be installed along with a service connection for each lot. This system shall be connected to the city water system or a source accepted by the health department. All pipe, valves, hydrants and other components shall conform to the city and health department specifications and regulations. 1102.2. Sanitary sewerage system. When, in the written opinion ofthe city engineer, public sanitary sewers are within reasonable distance and access to the subdivision, the subdivider shall provide sanitary sewer services to each lot within the bounds ofthe subdivision. A formula may be developed by the city engineer to provide for a sharing of costs of other sewer facilities needed to serve the subdivision when certain ofthe required sewer facilities are necessary to serve other subdivisions located in the same drainage basin. When, in the written opinion of the city engineer, a public sanitary sewer is not accessible, an alternate method ofsewage disposal for each lot may be used when in compliance with health department standards and regulations. If public sewerage is not available, but is expected to be available within a reasonable period of time after completion ofthe subdivision, an alternate method for sewage disposal for individual lots shall be required on an interim basis. In such instance, and at the discretion of the mayor and council, the developer may be required to construct a complete sanitary sewer system for the subdivision, including outfall lines, street sewers and service stubs to individual lots. All sewers shall be plugged and otherwise protected to ensure serviceability at the time of connection to the public system. The dry sewers shall be constructed to city specifications.