--- title: Smyrna Zoning Ordinance, Sec. 1103 (Appendix B, Article XI). Compliance and completion ofimprovements collection: local-codes id: local-code:smyrna/zoning/appendix-b-article-xi-1103 cite_as: Smyrna, Ga., Zoning Ordinance, Appendix B, Article XI, § 1103 canonical_url: https://georgiacommons.org/code/local/smyrna/zoning/appendix-b-article-xi-1103 md_url: https://georgiacommons.org/code/local/smyrna/zoning/appendix-b-article-xi-1103.md text_url: https://georgiacommons.org/code/local/smyrna/zoning/appendix-b-article-xi-1103/text source_url: https://library.municode.com/ga/smyrna date: 2026-11-11 status: active jurisdiction: city:smyrna jurisdiction_name: Smyrna place_fips: "1371492" corpus_version: local-codes-smyrna-55e624716b18 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/smyrna/zoning/~appendix-b/~article-xi.md previous: https://georgiacommons.org/code/local/smyrna/zoning/appendix-b-article-xi-1102.md next: https://georgiacommons.org/code/local/smyrna/zoning/article-xii.md index: https://georgiacommons.org/code/local/smyrna.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:smyrna/zoning/appendix-b-article-xi-1103@2026-11-11-07b73b0bf4 --- # Smyrna Zoning Ordinance, Sec. 1103 (Appendix B, Article XI). Compliance and completion ofimprovements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS / Article XI - REQUIRED IMPROVEMENTS 1103 .1. Letter ofapproval. The subdivider shall, upon completion ofthe required improvements indicated herein, request in writing from the city engineer a letter indicating that all provisions of article XI have been satisfactorily completed. The city engineer shall send copies ofthis letter to the planning commission and the mayor and council, stating whether or not the subdivision complies with the provisions of this ordinance as they relate to the required improvements. If no action is taken by the city engineer within 30 days of the receipt of the subdivider’s letter, the improvements shall be considered acceptable. 1103 .2. Inspection. All underground installations, subgrades, bases or courses of asphalt shall not be covered or hidden until they are inspected and accepted by the city engineer or his/her] agent. 1103 .3. Certification. All improvements required under the provisions ofthis ordinance shall be installed by a person, firm or corporation, competent, qualified, licensed and bonded to do such work. 1103 .4. Marking. All lot and block corners or changes in direction shall be marked by either metal or concrete monument approved by the city engineer.