Snellville · Zoning Ordinance
Snellville Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2026-07-13
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 6 of 7. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
306-4.2. Refusal to Issue Permits If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the construction codes or other pertinent laws or ordinances, the Building Official may not issue a permit, but will return the contract documents to the applicant with their refusal to issue such permit. Such refusal must, when requested, be in writing and must contain the reason for refusal.
306-4.3. Special Foundation Permit When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the Building Official may, at his discretion, issue a special permit for the foundation only. The holder of such a special permit is proceeding at his own risk and without assurance that a permit for the remainder of the work will be granted or that corrections will not be required in order to meet provisions of the construction codes.
306-4.4. Public Right-of-Way A permit may not be given by the Building Official for the construction or alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, unless the applicant has made application at the office of the director of public works for the right-of-way lines of the public street on which he/she proposes to build, erect or locate said building. It is the duty of the Building Official to see that the right-of-way lines are not encroached upon except as provided for in City codes.
Sec. 306-5. Contractor Responsibilities It is the duty of every contractor who makes contracts for the installation or repairs of building, structure, electrical, gas, mechanical, sprinkler or plumbing systems, for which a permit is required, to comply with State or local rules and regulations concerning licensing which the applicable governing authority may have adopted. In such case that the State requires a contractor to have obtained a State license before they are permitted to perform work, the contractor must supply the local government with their license number before receiving a permit for work to be performed.
Sec. 306-6. Conditions of the Permit 306-6.1. Permit Intent A permit issued will be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the construction codes, nor will issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction, or violations of the construction codes. Every permit issued will become invalid unless the work authorized by such permit is commenced within 6 months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 6 months after the time the worked is commenced. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit.
The extension must be requested in writing prior to the expiration of the existing permit and justifiable cause must be demonstrated. Extensions that are granted must be in writing by the Building Official.
306-6.2. Plans When the Building Official issues a permit, they must endorse, in writing or by stamp, both sets of plans "Reviewed for Code Compliance." One set of drawings so reviewed must be retained by the Building Official and the other set must be returned to the applicant. The permitted drawings must be kept at the site of work and must be open to inspection by the Building Official or their authorized representative.
Sec. 306-7. Fees 306-7.1. Payment of Fees A permit may not be issued until the fees prescribed by the governing body have been paid. Nor may an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, and mechanical or gas systems, etc., has been paid.
306-7.2. Work Commencing Before Permit Issuance Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing, etc., system before obtaining the necessary permits, will be subject to a penalty of 100% of the usual permit fee in addition to the required permit fees.
306-7.3. Accounting The Building Official must keep a permanent and accurate accounting of all permit fees and other money collected, and the names of all persons upon whose account the same was paid, along with the date and amount thereof.
306-7.4. Schedule of Permit Fees On all buildings, structures, electrical, plumbing, mechanical and gas systems or alterations requiring a permit, a fee for each permit must be paid as required at the time of filing application, in accordance with the fee schedules as set by the governing body.
306-7.5. Building Permit Valuations If, in the opinion of the Building Official, the valuation of building, alteration, structure, electrical, gas, mechanical or plumbing systems appears to be underestimated on the application, permit will be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Permit valuations must include total cost, such as electrical, gas, mechanical, plumbing equipment and other systems, including materials and labor.
Sec. 306-8. Inspections 306-8.1. Existing Building Inspections Before issuing a permit the Building Official may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. They must inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. They must make a record of every such examination and inspection and of all violations of the construction codes.
306-8.2. Manufacturers and Fabricators When deemed necessary by the Building Official they must make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record must be made of every such examination and inspection and of all violations of the construction codes.
306-8.3. Inspection Service The Building Official may make, or cause to be made, the inspections required by Sec.
306-8.6. They may accept reports of inspectors of recognized inspection services provided that after investigation he/she is satisfied as to their qualifications and reliability. A certificate called for by any provision of the construction codes may not be based on such reports unless the same are in writing and certified by a responsible officer of such service.
306-8.4. Inspections Prior to Issuance of Certificate of Occupancy or Completion The Building Official must inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection must be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion.
306-8.5. Posting of Permit Work requiring a permit may not commence until the permit holder or their agent posts the permit card in a conspicuous place on the premises. The permit must be protected from the weather and located in such position as to permit the Building Official or representative to conveniently make the required entries thereon. This permit card must be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the Building Official.
306-8.6. Required Inspections The Building Official, upon notification from the permit holder or their agent, must make the following inspections and such other inspections as necessary, and must either release that portion of the construction or notify the permit holder or their agent of any violations which must be corrected in order to comply with the construction codes:
A. Building
1. Foundation inspection: To be made after trenches are excavated and forms erected.
2. Frame inspection: To be made after the roof, all framing, fireblocking and bracing are in place, and all wiring, all pipes, chimneys, ducts and vents are complete.
3. Final inspection: To be made after the building is completed and ready for occupancy.
B. Electrical
1. Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.
2. Rough-in inspection: To be made after the roof, framing, fireblocking and bracing is in place and prior to the installation of wall or ceiling membranes.
3. Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.
C. Plumbing
1. Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.
2. Rough-in inspection: To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete, and prior to the installation of wall or ceiling membranes.
3. Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.
Note: See Section 312 of the International Plumbing Code for required tests.
D. Mechanical
1. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place.
2. Rough-in inspection: To be made after the roof, framing, fire blocking and bracing are in place and all ducting and other concealed components are complete, and prior to the installation of wall or ceiling membranes.
3. Final inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy.
E. Gas
1. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected.
2. Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection must include a pressure test.
3. Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes in order to insure compliance with all the requirements of the construction codes and to assure that the installation and construction of the gas system is in accordance with reviewed plans.
Note: See Section 406 of the International Fuel Gas Code for required tests.
F. Energy
1. Foundation inspection: To be made before slab concrete is poured in place, and to verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required.
2. Frame inspection: To be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage.
3. Final inspection: To be made after the building is completed and ready for occupancy, to verify installation and R-value of ceiling and floor insulation, and to verify correct SEER ratings on appliances.
G. Swimming pool
1. Site inspection: Required only for private swimming pools.
2. Initial construction inspection: To inspect reinforcing steel or basket inspection and erosion control inspection.
3. Final inspection: All swimming pool installations must be completed with all fences, gates, decks, plumbing equipment, filters, heaters and appliances in place. The pool must be completely filled with water and in operation before final inspection.
306-8.7. Written Release Work may not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the Building Official. Such written release will be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections.
306-8.8. Reinforcing Steel, Structural Frames, Insulation, Plumbing, Mechanical, or Electrical Systems
Reinforcing steel, structural frame, insulation, plumbing, work of any part of any building or structure may not be covered or concealed without first obtaining a release from the Building Official.
306-8.9. Plaster Fire Protection In all buildings where plaster is used for fire protection purposes, the permit holder or his agent must notify the Building Official after all lathing and backing is in place. Plaster may not be applied until the release from the Building Official has been received.
Sec. 306-9. Certificates 306-9.1. Certificate of Occupancy
A. Building occupancy A new building may not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the Building Official has issued a certificate of occupancy. Said certificate may not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the construction codes and other applicable laws and ordinances and released by the Building Official.
B. Issuing certificate of occupancy Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the construction codes, reviewed plans and specifications, and after the final inspection, the Building Official will issue a certificate of occupancy that includes the following:
1. The building permit number.
2. The address of the structure.
3. The name and address of the owner.
4. A description of that portion of the structure for which the certificate is issued.
5. A statement that the described portion of the structure has been inspected for compliance with the requirements of this Code for the occupancy and division of occupancy and the use for which the proposed occupancy is classified.
6. The name of the Building Official.
7. The edition of the code under which the permit was issued.
8. The use and occupancy, in accordance with the provisions of Chapter 3, 2012 International Building Code currently in affect.
9. The type of construction as defined in Chapter 6, 2012 International Building Code currently in affect.
10. The design occupant load.
11. If an automatic sprinkler system is provided, whether the sprinkler system is required.
12. Any special stipulations and conditions of the building permit.
C. Temporary/partial occupancy A temporary/partial certificate of occupancy may be issued for a portion of a building, which may safely be occupied prior to final completion of the building.
D. Existing building certificate of occupancy A certificate of occupancy for any existing building may be obtained by applying to the Building Official and supplying the information and data necessary to determine compliance with the construction codes for the occupancy intended. Where necessary, in the opinion of the Building Official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the construction codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy must be issued.
E. Revocation The Building Official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this Code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any provisions of this Code.
F. Certificate of completion Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.
306-9.2. Service Utilities
A. Connection of Service Utilities No person may make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the construction codes for which a permit is required, until released by the Building Official and a certificate of occupancy or completion is issued.
B. Temporary Connection The Building Official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy.
C. Authority to Disconnect Service Utilities The Building Official has the power to authorize disconnection of utility service to the building, structure or system regulated by the construction codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The Building Official must notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system must be notified in writing, as soon as practical thereafter.
Sec. 306-10. Posting Floor Loads 306-10.1. Occupancy An existing or new building may not be occupied for any purpose which will cause the floors thereof to be loaded beyond their safe capacity. The Building Official may permit occupancy of a building for mercantile, commercial or industrial purposes by a specific business when he is satisfied that such capacity will not thereby be exceeded.
306-10.2. Storage and Factory-Industrial Occupancies It is the responsibility of the owner, agent, proprietor or occupant of Group S and Group F occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer in computing the safe load capacity. All such computations must be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. The computations and affidavit must be filed as a permanent record of the building department.
306-10.3. Signs Required In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads, as reviewed by the Building Official on the plan, must be marked on plates of approved design which must be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates may not be removed or defaced, and if lost, removed or defaced, must be replaced by the owner of the building.
ARTICLE 7. MOVING AND DEMOLITION OF BUILDINGS
Sec. 307-1. Condition Precedent to Permit
A. Whenever any dwelling or other structure formerly used for human habitation in excess of 150 sq. ft., or any commercial building or other structure formerly occupied in the conduct of any trade or business in excess of 150 sq. ft., is removed from a location within the city to another and different location, either within or without the city, or there is to be a demolition of the structure, the applicant for the permit to move or demolish such structure must agree in writing that they will leave the premises in a safe and sanitary condition and is required to do the following:
1. Remove from such location or premises all trash, debris, garbage and other similar material.
2. Fill all holes and depressions caused by the removal of any part of the structure or caused as a result of compliance with this article, which might become a harboring place for insects, rodents or vermin.
3. Tear down and remove all underpinnings, pilasters, steps, plumbing connections and fixtures above ground level. All water, gas and sewer lines must be closed off, sealed and made to be gastight and watertight.
4. Fill or cover all wells with a concrete cap.
B. Until the premises is completely restored to a safe and sanitary condition, the premises must be secured by a fence to prevent unauthorized entry.
Sec. 307-2. Time Limits; Costs
A. All persons to whom this article is applicable must comply with its provisions within 30 days following the date of the removal of any structure specified herein.
B. If any such person fails to comply with the provisions of this article, the City, its agents, employees, designees or contractors are authorized to enter upon the premises and to perform the work necessary thereon to comply with this article. The work may be performed by City forces or by parties employed by the City and the cost thereof charged against the person failing or refusing to comply. Any person applying for a permit under this article grants to the City an easement on the premises to perform the work.
Sec. 307-3. Permit to Move Building; Fees; Issuance; Bond
A. No person owning or leasing a building or a portion of a building to be moved, may move or authorize the moving of any house, dwelling, apartment building or other similar structure or any portion thereof from within the city to a point outside the city or from within the city to another point within the city; or from a point outside the city to a point within the city, or from a point outside the city through the city to another point outside the city without first having obtained a permit to do so. No person may be issued a permit to move or authorize the moving of any house, dwelling, apartment building or other similar structure or any portion thereof in the city or into the city or from the city to a point outside the city or through the city until they have paid a permit fee as set forth in the schedule of fees and charges.
B. Before moving a structure or any portion of a structure for which a permit has been issued the mover is required to give 2 days' notice to the Chief of Police of the Snellville Police Department prior to such moving.
C. Where application for a permit to move a structure or a portion thereof as identified in A above has been filed and the requisite permit fee paid, where written agreement regarding cleanup of the site has been signed and where all applicable ordinances of the City have been complied with, the Building Official is authorized to issue a permit to the applicant.
D. No permit to move a structure or any portion thereof from inside the city to a point inside or outside the city may be issued until the applicant posts with the City Clerk a cash bond in the amount set forth in the schedule of fees and charges.
Sec. 307-4. Permit to Locate Building onto Vacant Land; Application Fee When any person desires to move or authorize the moving of a house, apartment, duplex or other similar structure or any building, excluding any house, dwelling, apartment or other structure formerly used for human habitation which is 150 square feet or less, onto any vacant land in the city, they must file an application for a permit with the City and must pay a fee as set forth in the schedule of fees and charges in addition to any other required fees or bonds specified in this article.
Sec. 307-5. Placement on Vacant Land without Permit; Submission of Plan
A. It is unlawful to move any house or other structure onto vacant land without a permit.
No permit to move a house or other building onto vacant land in the city may be granted, and no house or other structure may be placed on vacant land in the city, until the person desiring a permit to move a house or other structure must have submitted all required plans and specifications showing the proposed additions or changes to be made on the structure including foundation plans; plans for paving proposed driveways, if any; types of materials to be used in additions or changes; the proposed location on the plat of land; and any and all pertinent information required for new construction, where applicable. Provisions of this UDO and ordinances applicable to applying for permits to move houses or other buildings onto vacant land in the city and in improving houses and other buildings moved onto vacant land in the city must be followed and all resultant fees paid.
B. It be unlawful to move any structure onto any land within the city (whether the move is to be temporary or permanent) unless a permit has been granted therefor as provided in this article. Any violation of this section will be a continuing violation and each day of violation will constitute a new offense.
Sec. 307-6. Demolition of Buildings
A. Whenever any person desires to demolish any house, dwelling, apartment or other similar structure formerly used for human habitation or any commercial, industrial, or other structure formerly used in the conduct of any trade or business, they must, before being entitled to the issuance of a permit, agree in writing that they will, following the demolition of the structure, take all necessary action including the following to ensure that the premises or location where the structure is demolished must be left in a sanitary condition and free from all trash, debris and structures which might become a harboring place for insects, rodents or vermin:
1. Remove from such location or premises all trash, debris, garbage and other similar material.
2. Fill all holes and depressions caused by the removal of any part of the structure, or caused as a result of compliance with this article, which might become a harboring place for insects, rodents or vermin.
3. Tear down and remove all underpinnings, pilasters, steps, plumbing connections and fixtures above ground level. All water, gas and sewer lines must be closed off, sealed and made to be gastight and watertight.
4. Fill or cover with a concrete cap all wells.
B. No permit to demolish a structure may be issued until the applicant posts with the City Clerk a cash bond in the amount set forth in the schedule of fees and charges. The cash bond is to be returned to the applicant after the permitted structure has been demolished and the applicant has placed the premises or location in the condition as set forth in this article. If the permit holder fails to comply with this requirement, all or any portion of the cash bond will be applied by the City to the cost of City forces entering upon the premises or location and placing them in the condition as specified in this article. No permit or bond is required for the demolition of sheds or other accessory buildings where the structure was not used for human habitation or any commercial, industrial, trade or business purpose, or any building not having gas, water, electricity and other utilities connected.
C. It is unlawful to demolish any house, dwelling or other similar structure formerly used for human habitation or any commercial, industrial or other structure formerly used in the conduct of any trade or business without a proper permit. Any violation of this section will be a continuing violation and each day of violation will constitute a new offense.
Sec. 307-7. Transporting Structure
A. Any person transporting any house, dwelling, apartment or other structure formerly used for human habitation, or any commercial building or other structure formerly occupied in the conduct of any trade or business across or along the public roads or highways of the City must establish that it is licensed by the State public service commission or must furnish proof that it has in effect public liability insurance with minimum coverage of $1,000,000.00 to protect the property and persons who may be damaged as a result of the moving of the structure.
B. A permit may be required by the State or federal departments of transportation for the transport of a structure on City, County, State or federal roads. Any required transport permit is the sole responsibility of the applicant.
Sec. 307-8. Eminent Domain Proceedings; Exemption from Fees When an owner of a single-family dwelling or the owner of a two-family dwelling who resides in the dwelling is effectively evicted by eminent domain proceedings or other governmental action, and desires to move his dwelling to another properly zoned location in the city where he will thereafter reside as his home, such owner must obtain a permit as specified in this article but is not required to pay the moving permit fees.
Sec. 307-9. Penalties Any violation of this article is punishable as provided in Sec. 1-11 of the Snellville Code of Ordinances.
ARTICLE 8. TESTS
Sec. 308-1. Generally The Building Official may require tests or test reports as proof of compliance. Required tests are to be made at the expense of the owner or their agent, by an approved testing laboratory or other approved agency.
ARTICLE 9. CONSTRUCTION BOARD OF ADJUSTMENT AND APPEALS
Sec. 309-1. Appointment The Board of Appeals will act as the construction board of adjustment and appeals. The Director will be an ex-officio member of the Board of Appeals, without voting privileges, when any matter concerning this article is heard by the board of appeals.
Sec. 309-2. Powers The construction board of adjustments and appeals has the power, as further defined in Sec. 309-3, to hear the appeals of decisions and interpretations of the Building Official and consider variances of the construction codes.
Sec. 309-3. Appeals 309-3.1. Decision of the Building Official The owner of a building, structure or service system, or his duly authorized agent, may appeal a decision of the Building Official to the construction board of adjustment and appeals whenever any one of the following conditions are claimed to exist:
A. The Building Official rejected or refused to approve the mode or manner of construction proposed to be followed or materials to be used in the installation or alteration of a building, structure or service system.
B. The provisions of the construction codes do not apply to this specific case.
C. That an equally good or more desirable form of installation can be employed in any specific case.
D. The true intent and meaning of the construction codes or any of the regulations thereunder have been misconstrued or incorrectly interpreted.
309-3.2. Variances The construction board of adjustments and appeals, when so appealed to and after a hearing, may vary the application of any provision of the construction codes to any particular case when, in its opinion, the enforcement thereof would do manifest injustice and would be contrary to the spirit and purpose of this or the construction codes or public interest, and also finds all of the following:
A. That special conditions and circumstances exist which are peculiar to the building, structure or service system involved and which are not applicable to others.
B. That the special conditions and circumstances do not result from the action or inaction of the applicant.
C. That granting the variance requested will not confer on the applicant any special privilege that is denied by the construction codes to other buildings, structures or service system.
D. That the variance granted is the minimum variance that will make possible the reasonable use of the building, structure or service system.
E. That the grant of the variance will be in harmony with the general intent and purpose of the construction codes and will not be detrimental to the public health, safety and general welfare.
309-3.3. Condition of Variances In granting the variance, the board may prescribe a reasonable time limit within which the action for which the variance is required must be commenced or completed or both. In addition, the board may prescribe appropriate conditions and safeguards in conformity with the construction codes. Violation of the conditions of a variance will be deemed a violation of the construction codes.
309-3.4. Notice of Appeal Notice of appeal must be in writing and filed within 30 days after the Building Official renders the decision. Appeals must be in a form acceptable to the Building Official.
309-3.5. Unsafe or Dangerous Buildings or Service Systems In the case of a building, structure, or service system, which, in the opinion of the Building Officials, is unsafe, unsanitary or dangerous, the Building Official may, in his order, limit the time for such notice of appeals to a shorter period.
Sec. 309-4. Rules and Regulations The board must establish rules and regulations for its own procedure not inconsistent with the provisions of these procedures. The board must meet on call of the chairman. The board must meet within 30 days after notice of appeal has been received.
309-4.1. Decisions.
The construction board of adjustment and appeals must, in every case, reach a decision without unreasonable or unnecessary delay. Each decision of the board must also include the reasons for the decision. If a decision of the board reverses or modifies a refusal, order, or disallowance of the Building Official or varies the application of any provision of the construction codes, the Building Official must immediately take action in accordance with such decision. Every decision must be promptly filed in writing in the office of the Building Official and must be open to public inspection. A certified copy of the decision must be sent by mail or otherwise to the appellant and a copy must be kept publicly posted in the office of the Building Official for two weeks after filing. Every decision of the board will be final, subject however to such remedy as any aggrieved party might have at law or in equity.
CHAPTER 400. LAND DEVELOPMENT
ARTICLE 1. STREETS AND PUBLIC IMPROVEMENTS
Sec. 401-1. General 401-1.1. Applicability This article applies to any development permit, land disturbance Permit, or building permit.
401-1.2. Intent The article is intended to promote good subdivision and site design that:
A. Creates a functional and attractive development for future inhabitants and users;
B. Minimizes adverse impacts on adjoining properties and residents;
C. Minimizes adverse impacts on the natural environment; and
D. Ensures that a project will be an asset to the community.
401-1.3. Land Suitability and Site Analysis
A. Primary Conservation Areas
1. The following areas are unsuitable for development and are considered to be primary conservation areas:
a. Unique and/or fragile areas, including wetlands as defined by the Army Corps of Engineers pursuant to the Clean Water Act;
b. The regulatory 100-year floodplain;
c. Steep slopes over 25%, as measured over a 20-foot horizontal interval, of at least 5,000 square feet contiguous area;
d. Buffer zones of at least 75 feet width along all U.S.G.S. perennial and intermittent streams;
e. Habitats for or populations of endangered or threatened wildlife, as identified on federal or State lists;
f. Historically significant structures and sites, as listed on federal, State, City, or County lists of historic places; and
g. Archaeological sites; cemeteries, and burial grounds.
2. Primary conservation areas:
a. Must be used for open space;
b. May not be subdivided for residential occupancy;
c. May not be developed for any uses that may be reasonably concluded to be harmful to the health, safety, life, property, or general welfare; and
d. Must be protected by a conservation easement in perpetuity in accordance with Georgia law and City regulations.
3. Relief from primary conservation area requirements may be approved by the Board of Appeals when an applicant demonstrated that conformance would be an unusual hardship and would be counter to the intent of this article.
B. Secondary Conservation Areas
1. The following are considered secondary open space areas and should be used as open space to the maximum extent possible:
a. Existing healthy, native forests of at least 1 contiguous acre;
b. Individual, existing healthy trees greater than 8 inches caliper, as measured at the diameter breast height (DBH);
c. Other significant natural features and scenic viewsheds, such as ridgelines, peaks, and rock outcroppings, particularly those that can be seen from public roads;
d. Important historic sites;
e. Prime agricultural lands of at least 5 acres; and
f. Existing trails that connect the tract to neighboring areas.
C. Site Analysis Map Required
1. A site analysis map must be made in the form of a sketch plat or concept plan of characteristics of the development site and site context including:
a. Geology of soil, topography;
b. Ecology;
c. Existing vegetation;
d. Surrounding structures and road networks;
e. Visual features; and
f. Past and present uses of the site.
The development of the site must be based on the site analysis. To the maximum extent practicable, development must be located to preserve natural features, to avoid areas of environmental sensitivity, and to minimize negative impacts and alteration of natural features.
2. The design of the development must take into consideration all existing local and regional plans for the surrounding community including, but not limited to, the areas designated as conservation lands on the Future Land Use Map.
3. The development must be laid out to:
a. Avoid adversely affecting groundwater and aquifer recharge;
b. Reduce cut and fill;
c. Avoid unnecessary impervious cover;
d. Prevent flooding;
e. Provide adequate access to lots and sites; and
f. Mitigate adverse effects of shadow, noise, odor, traffic, drainage, and utilities on neighboring properties.
4. Minimum Lot Sizes. Primary conservation areas or secondary conservation areas must be:
a. Located on their own lot meeting the minimum size requirements of the zoning district; or
b. Placed in a buildable lot as excess land.
401-1.4. Offers of Land Dedication When a developer proposes the dedication of land to public use, and the reservation is not envisioned in the Comprehensive Plan or is otherwise deficient, the Director must obtain approval for the proposed reservation of land from the City Council before approval of the preliminary plat. If the Director finds that such land is neither required nor suitable for public use, the Director will require the rearrangement of lots to include such land in private ownership.
401-1.5. Required Public Improvements Improvements and associated lands required by this article must be provided at no cost to the City and must be dedicated or otherwise transferred, as required, to the public in perpetuity and without covenant or reservation, except as otherwise provided herein.
401-1.6. Survey Monuments
A. Marker requirements.
All lot corners must be marked with an iron rebar or pin, at least 0.5 inch in diameter and 18 inches long and driven to extend no less than 1 inch above the finished grade.
B. Floodplains On subdivisions containing floodplains, flood elevation references must be set in accordance with the requirements of the Flood Damage Prevention Ordinance.
401-1.7. Standard drawings
A. Maintenance The Department must maintain a set of Snellville and Gwinnett County Department of Planning and Development standard drawings on file for consultation and distribution.
These drawings illustrate details of the construction and design of streets, stormwater drainage facilities, site improvements, and other elements related to the development of land in accordance with this UDO.
B. Case-by-Case Basis The standard drawings provide minimum acceptable standards for land development activities authorized under this article and this UDO, but will not supersede more restrictive prudent design requirements or good engineering practice as may be applied by the Director to specific situations on a case-by-case basis.
C. Minimum Standards The standard drawings are incorporated by reference as part of this UDO and establish the minimum standards for design and construction of required improvements, subject to the amendment and appeal provisions of Chapter 100 Article 3.
Sec. 401-2. Open Space 401-2.1. Open Space Conservation
A. Applicability This subsection applies to the following developments and is in addition to any recreation areas required by Sec. 401-2.2:
1. Residential subdivisions over 10 acres in size, except in the TCO, TC, MU, NR, or RO districts; and
2. Residential developments over 5 acres in size or with more than 36 units, except in the TCO, TC, MU, NR, or RO districts.
3. Commercial, industrial, and mixed-use, developments over 10 acres in size, except in the TCO, TC, MU, NR, or RO districts.
B. Intent The intent of this subsection is to require applicable new developments to provide open space, in order to achieve the following purposes:
1. Conserve open land, including those areas containing historic or cultural resources, or sensitive natural features and wildlife habitats;
2. Provide greater design flexibility and efficiency in the siting of utilities and streets and the opportunity to reduce the length of roads, utility runs, and the amount of paving and land disturbance;
3. Reduce erosion and sedimentation by minimizing land disturbance;
4. Create developments with direct visual access to open land, open space amenities, and strong community identity;
5. Provide active and passive recreational opportunities for residents and other users of developments;
6. Provide multiple options for landowners in order to minimize the impact on environmental resources and provide standards reflecting the variety of circumstances and interests of individual property owners; and
7. Implement the Comprehensive Plan, and other adopted land use and transportation policies of the City of Snellville and Gwinnett County and to implement the Georgia Greenspace Act (O.C.G.A. §§ 36-22-1—36-2-12).
C. Existing Features Subject to the review of the City Council, the Director may require that existing features which would add value to the planned development or to the city as a whole, such as trees, watercourses and falls, historic sites, and similar irreplaceable assets, be preserved.
D. Open Space Requirement
1. At least 20% of the site must be set aside as open space.
2. Open space required by this section may be used in a variety of ways, including natural areas for wildlife and ecological functions, parks, gardens, landscaped medians, squares, village greens, courtyards, recreational space, or recreational facilities, provided the use is consistent with the requirements of this section.
3. Land designated as unsuitable under Sec. 401-1.3 (Land Suitability and Site Analysis) counts toward the 20% open space requirement. Where the unbuildable area of a site is equal to or greater than 20% of the total area in the site, the open space requirement has been fulfilled. Where the unbuildable area is less than 20% of the total site area, additional land must be set aside so that the overall 20% open space requirement is fulfilled.
4. Open space may not include areas devoted to public or private streets or any land which has been, or is to be, conveyed to a public agency, via a purchase agreement for such uses as parks, schools, or other public facilities, or which lies within any required private recreation facility, overhead power easement, or stormwater detention facility. No more than 50% of required stream buffers, 100-year floodplain, delineated wetlands, and proposed permanent lakes may be credited as open space.
E. Open Space Standards Open space required to meet the minimum requirements must comply with the following:
1. Undeveloped and natural
a. General. Open space must remain undeveloped and natural except for the provision of non-motorized passive recreation opportunities such as running, walking, biking, and similar outdoor activities, except as provided in sentence E.1.b below.
b. Exceptions. "Greens" may be constructed and maintained in open space. A "green" is a landscaped area larger than 0.33 acre constructed for gathering or play, or visual enhancement. "Greens" may not exceed 10% of the total open space. At least 75% of the open space must be contiguous with a minimum width of 40 feet.
2. The open space must adjoin any neighboring areas of open space, other protected areas, and non-protected natural areas that would be candidates for inclusion as part of a future area of protected open space, as defined by the Comprehensive Plan, the Gwinnett County Open Space and Greenway Master Plan, the Snellville Greenway Master Plan, or any other official City plan or project.
3. Uses of open space may only include the following:
a. Conservation of natural, archaeological, and/or historical resources.
b. Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas.
c. Walking or bicycle trails, provided they are constructed of porous paving materials.
d. Passive recreation areas, such as open fields.
e. Active non-commercial recreation areas, such as playing fields, playgrounds, courts, and bikeways. They may be credited to no more than 25% of the required open space or 10 acres, whichever is less, and may not be located within primary conservation areas. Active recreation areas over this limit must be located outside of the protected Active recreation areas and may include impervious surfaces. Parking facilities for the same must also be permitted provided they may not be included in the required minimum open space.
f. Agriculture, horticulture, silviculture, and/or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts and such activities are not conducted within primary conservation areas.
g. Pastureland for horses and other grazing livestock used solely for recreational purposes. Equestrian facilities, including commercial facilities, are permitted but may not consume more than 25% of the minimum required greenway land.
Outdoor riding arenas are permitted. Rodeo facilities, indoor arenas, seating areas, and facilities for audiences are specifically excluded.
h. Outdoor open space amenities such as village greens, commons, picnic areas, community gardens, trails, and similar low-impact passive recreational uses specifically excluding motorized off-road vehicles, rifle ranges, and other uses similar in character and potential impact as determined by the Department.
i. Golf courses may comprise up to 50% of the minimum required open space, but may not include driving ranges or miniature golf. Golf course parking areas and any associated structures may not count toward the minimum required area of open space.
j. Other conservation-oriented uses compatible with the purposes of this regulation.
4. Prohibited uses of open space include the following:
a. Roads, parking lots and impervious surfaces, except as specifically authorized in this article.
b. Agricultural and forestry activities not conducted according to accepted best management practices.
c. Commercial livestock operations involving swine, poultry, mink, and other animals likely to produce highly offensive odors.
d. Impoundments.
e. Other activities as determined by the applicant and recorded on the legal instrument for permanent protection.
5. The use of certain areas to meet minimum open space requirements is restricted as follows:
a. Environmentally critical areas such as required stream buffers, 100-year floodplains, delineated wetlands, and proposed permanent lakes only count at a ratio of 50% of their land area.
b. Recreation area improvements. Impervious surfaces in recreation areas may be located in a protected open space but do not count towards requirements.
c. Utility rights-of-way and/or easements for drainage, access, and underground utilities may be located in a protected open space but do not count towards requirements.
d. Stormwater management facilities and practices do not be count towards requirements unless integrated into open spaces as follows:
i. The open space containing the stormwater feature must be designed and stamped by a Landscape Architect licensed in the State of Georgia;
ii. Stormwater features in open spaces must be designed as formal or natural amenities for the open space;
iii. Stormwater features may not constitute more than 50% of the required open space;
iv. Exposed concrete is not allowed in the stormwater management facility.
This includes concrete located in retention or detention ponds, spillways, or basins;
v. Stormwater features may not be fenced or enclosed by retaining walls over 30 inches in height.
e. Land devoted to public or private streets or any land that has been, or is to be, conveyed to a public agency via a purchase agreement for such uses as parks, schools, or other public facilities do not count towards requirements.
F. Conservation Surety
1. Open space, except for "greens," must be permanently protected by the conveyance of
(a) a covenant or scenic easement which runs in perpetuity under O.C.G.A. § 44-5-60 in favor of any corporation, trust, or other organization holding land for the use of the public or certain governmental entities; or (b) a conservation easement running in perpetuity to a third party "qualified organization" recognized by federal Treasury Regulation section 1.170A-14(c)(1). Qualified organizations recognized by this treasury regulation include, but may not be limited to: governmental entities, certain publicly supported charities, local and national land trusts, or other conservation groups that are organized or operated primarily or substantially for one of the conservation purposes specified in the Internal Revenue Code. Governmental entities qualifying to be named in covenants under O.C.G.A. § 44-5-60 or to receive conservation easements under the treasury regulation referred to above for purposes of this section include the federal government, the State of Georgia, Gwinnett County, or political subdivisions or authorities of the State of Georgia or Gwinnett County. If a covenant or conservation easement is recorded in favor of a governmental entity, the written acceptance of the covenant or conservation easement by the governmental entity must be obtained before the recording of the covenant or easement. The developer must record the necessary legal instrument to accomplish protection of the open space before, or concurrent with, the recording of the final subdivision plat.
2. The instrument for permanent protection must include clear restrictions on the use of the open space. These restrictions must include all restrictions contained in this article, as well as any further restrictions the applicant chooses to place on the use of the open space or the City Council imposes as a condition of zoning.
G. Ownership Requirements Open space must be owned in fee-simple by a property owner's association; by the property owners; or by another entity approved in advance by the City. The developer must record the deed to the open space before, or concurrent with, the recording of the first final subdivision plat. An access easement following the alignment of future public streets is acceptable. However, "greens" may be deeded concurrent with the unit or phase of the final subdivision plat of which it is a part.
H. Property Owner's Association When a property owner's association is established, its bylaws must include the following:
1. Governance of the association by the Georgia Property Owner's Association Act (O.C.G.A. § 44-3-220 et seq.) or a successor to that Act that grants lien rights to the association for maintenance expenses and tax obligations.
2. Responsibility for maintenance of the open space.
3. Responsibility for insurance and taxes.
4. Automatic compulsory membership of all lot purchasers and their successors; and compulsory assessments.
5. Conditions and timing for transferring control of the association from the developer to the lot owners.
6. Guarantee that the association will not be dissolved without the advance approval of the City Council.
I. Maintenance
1. The property owner's association, or other entity approved in advance by the City Council, is responsible for the continuous maintenance of buffers, open space, and recreation areas.
2. An open space management plan or private covenants must be prepared and submitted before the issuance of a site development permit. The open space management plan must:
a. Allocate responsibility and guidelines for the maintenance and operation of the open space and any facilities located thereon, including provisions for ongoing maintenance and long-term capital improvements;
b. Estimate the costs and staffing requirements needed for maintenance and operation of, and insurance for, the open space, and outlines how such funding will be obtained or provided;
c. Provide that any changes to the plan be approved by the City Council; and
d. Provide for the enforcement of the plan.
3. If the party responsible for maintenance of the open space fails to maintain all or any portion in reasonable order and condition, the City may assume responsibility for its maintenance and may enter the premises and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the property owner, homeowner association, or to the individual property owners that make up the homeowner association, and may include administrative costs and penalties. Such costs will become a lien on all subdivision properties, when applicable.
J. Tax assessment of open space When a legal instrument for permanent protection has been placed upon the open space, the City must reassess the open space at a lower value to reflect its more limited use. If the open space is used purely for passive recreational purposes and the terms of the instrument for permanent protection effectively prohibit any type of significant economic activity, then the assessment must be at a value of zero.
401-2.2. Recreation Areas
A. Applicability This subsection applies to the following and is in addition to any open space conservation required by Sec. 401-2.1:
1. Single-family detached subdivisions with more than 75 dwelling units and with an average residential lot size of less than 1 acre, except in TC, MU, NR, or RO districts;
and
2. Two-family subdivisions with more than 50 dwelling units, except in TC, MU, NR, or RO districts; and
3. Single-family attached, townhouse, and multi-family developments greater than 5 gross acres in size or with more than 40 units, except in TC, MU, NR, or RO districts.
B. General
1. At least 6% of the site's gross land area must be provided for recreational use, but in no case will the area required exceed 6 acres, subject to the following:
a. Not over 60% of the required recreational use land may be within the 100-year floodplain;
b. The required recreational use land must be contiguous or separated only by parking areas and private drives; and
c. The required recreational use land must be of suitable shape and condition for the construction of at least one swimming pool and one regulation-size tennis court.
2. In subdivisions, recreational use land required by clause 1 above that is not proposed for improvement by the developer must be deeded to a qualified property owners association or the City (upon approval of City Council). Such land must be deeded upon the approval of the final plat and may only be used for recreational purposes.
Membership in the qualified property owner's association must be mandatory for all the owners in the subdivision, and must be established under the laws of Georgia; it shall be responsible for the perpetuation, maintenance and function of the recreation areas and all uses or facilities therein. The association must have the authority and duty to assess its members for such maintenance and improvements as set forth in the instrument creating the association. All covenants must be recorded simultaneously with the final subdivision plat.
3. If the developer builds recreational facilities as required and allowed by clause 1 above, the land area must be deeded to a homeowner association or other legal entity incorporated under the laws of Georgia. The land must be deeded to said organization with a restriction that the land may only be used for recreational purposes and is available to all residents of the subdivision on an equal basis. The deed must be filed with the Department simultaneously with the final plat and must be held by the Department until a certificate of occupancy is issued for the recreational improvements, whereupon the deed must be recorded.
4. In multifamily rental or condominium projects, the land provided for recreational use in accordance with these requirements must be held in the ownership of the owner of the project.
5. The City may lease or sell land reserved for public parks to a qualified property owners association. Such land must include a deed restriction that it must be used exclusively for open space or public recreational purposes in perpetuity. The organization of a qualified property owners association and its adequate financing for the discharge of its responsibilities shall be assured through acceptable private deed covenants running with the land or other such documents as approved by City Council.
401-2.3. Civic Space
A. Applicability
1. This subsection applies in TC, MU, NR, and RO districts.
2. Open space in C, MU, NR, and RO districts includes two types: civic space and amenity space.
3. Open spaces must be incorporated into developments as required by district regulations, except as provided by a fee in lieu.
B. Civic Space
1. Defined. Civic space is the portion of open space for public use defined by the combination of certain physical constants including the relationships among their intended use, their size, their landscaping, and their adjacent buildings.
2. Types. Civic spaces are limited to the following types:
a. Park. An open space available for structured or unstructured recreation. A park may be independent of surrounding buildings at its edges. Its landscape may consist of paths and trails, meadows and lawns, water bodies, and woodlands. Recreation fields and courts may also be included but may not exceed 50% of the individual park area. The minimum size for a park is 1 acre.
b. Square. An open space available for unstructured recreation and civic purposes.
A square is spatially defined by buildings or streets at its edges. Its landscape must consist of paths and trees and may also include lawns and non-asphalt paved surfaces. The minimum size for a square is 0.5 acre.
c. Plaza. An open space, available for civic purposes and commercial activities. A plaza must be spatially defined by buildings or streets at its edges. Its landscape must consist primarily of non-asphalt paved surfaces and trees. The minimum size for a plaza is 0.25 acre.
d. Pocket Park. An open space, available for unstructured recreation. A pocket park may be spatially defined by buildings or streets at its edges. Its landscape must consist of lawn and trees, or just trees when the pocket park is wooded.
There is no minimum size for pockets parks.
e. Playground. An open space designed and equipped for the recreation of children. A playground must be fenced and may include an open shelter.
Playgrounds must be interspersed within residential areas, may be placed within a block, and may be included in parks and greens. There is no minimum size for playgrounds.
C. Amenity Space
1. Defined. Amenity space is any covered or uncovered, but unenclosed, outdoor area of at least 100 square feet that is intended for use by the occupants, invitees and guests of the development and specifically excluding civic spaces and required sidewalks.
2. Types. Amenity spaces may include, but are not limited to:
a. Rooftop decks;
b. Balconies;
c. Patios and porches;
d. Outdoor dining areas;
e. Pool areas;
f. Tennis courts, basketball courts, and similar uses;
g. Yards, lawns, and gardens;
h. Hardscape areas improved for pedestrian enjoyment; and
i. Wooded areas.
D. General
1. Wetlands, lakes, ponds, streams, rivers, flood zones, and stream buffers may only be considered open space when located within one of the five types of civic spaces identified in paragraph B.2 above.
2. No required buffer, except stream buffers, may be used to satisfy open space requirements.
3. Stormwater management facilities and practices do not be count towards open space requirements unless integrated into open spaces as follows:
a. The open space containing the stormwater feature must be designed and stamped by a Landscape Architect licensed in the State of Georgia;
b. Stormwater features in open spaces must be designed as formal or natural amenities for the open space;
c. Exposed concrete is not allowed in the stormwater management facility. This includes concrete located in retention or detention ponds, spillways, or basins;
and
d. Stormwater features may not be fenced or enclosed by retaining walls over 30 inches in height.
4. No areas used for vehicles, except incidental service, maintenance, or emergency actions, may be used to satisfy open space requirements.
E. Fee-in-Lieu If the required civic space cannot be provided on-site, the Director may approve a fee contribution to the City of Snellville Open Space Fund. The following standards are established for administering these contributions and fund:
1. The Director must review and approve all requests for fee-in-lieu compliance.
2. No permit may be issued until the required fee contribution has been made to the Open Space Fund.
3. The amount of the fee contribution is determined based on a developer-provided appraised value of the civic space acreage required. The appraisal must determine fair market value based upon an appraisal methodology consistent with the Uniform Standards of Professional Appraisals or other real estate valuation techniques approved and used by the State of Georgia when expending State funds for land acquisition. The appraisal must be prepared by a certified appraiser.
4. The City of Snellville Open Space Fund must be used for purchasing and maintaining public open spaces within or within 1 mile of (as measured in a straight line) of the Towne Center.
F. Credit for Off-Site Public Open Spaces Developments within 500 feet of a public park or other public open space (measured in a straight line from the development lot line to the closest lot line of the park or open space) may use the area of such off-site open space to satisfy its open spaces requirements as follows:
1. The Director must review and approve all requests to use this credit;
2. Only credit from one off-site park or open space may be used per development;
3. The area from one public park or open space may provide credit to multiple developments on multiple occasions; and
4. If the credit area does not satisfy all open space requirements, additional open space must be provided on-site or by fee-in-lieu.
G. Ownership Requirements Civic space, but not amenity space, must be owned in fee-simple by a property owner's association; by the property owners; or by another entity approved in advance by the City.
The developer must record the deed to the civic space before, or concurrent with, the recording of the first final subdivision plat. An access easement following the alignment of future public streets is acceptable.
H. Property Owner's Association When a property owner's association is established, its bylaws must include the following:
1. Governance of the association by the Georgia Property Owner's Association Act (O.C.G.A. § 44-3-220 et seq.) or a successor to that Act that grants lien rights to the association for maintenance expenses and tax obligations.
2. Responsibility for maintenance of the open space.
3. Responsibility for insurance and taxes.
4. Automatic compulsory membership of all lot purchasers and their successors; and compulsory assessments.
5. Conditions and timing for transferring control of the association from the developer to the lot owners.
6. Guarantee that the association will not be dissolved without the prior approval of the City Council.
I. Maintenance
1. The property owner's association, or other entity approved in advance by the City Council, is responsible for the continuous maintenance of buffers and civic space.
2. A civic space management plan or private covenants must be prepared and submitted before the issuance of a site development permit. The management plan must:
a. Allocate responsibility and guidelines for the maintenance and operation of the civic space and any facilities located thereon, including provisions for ongoing maintenance and long-term capital improvements;
b. Estimate the costs and staffing requirements needed for maintenance and operation of, and insurance for, the civic space, and outlines how such funding will be obtained or provided;
c. Provide that any changes to the plan be approved by the City Council; and
d. Provide for the enforcement of the plan.
3. If the party responsible for maintenance of the civic space fails to maintain all or any portion in reasonable order and condition, the City may assume responsibility for its maintenance and may enter the premises and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the property owner, homeowner association, or to the individual property owners that make up the homeowner association, and may include administrative costs and penalties. Such costs will become a lien on all subdivision properties, when applicable.
J. Tax assessment of open space When a legal instrument for permanent protection has been placed upon the civic space, the City of Snellville must reassess the civic space at a lower value to reflect its more limited use. If the civic space is used purely for passive recreational purposes and the terms of the instrument for permanent protection effectively prohibit any type of significant economic activity, then the assessment must be at a value of zero.
Sec. 401-3. Blocks and Access 401-3.1. Intent
A. The intent of the block standards is to provide a well-connected street network. Large blocks with limited connectivity discourage walking, contribute to street congestion, and add driving distance that can negatively impact emergency services. New streets should be designed to consider future development.
B. The intent of access standards is to provide safe and convenient vehicular and pedestrian access within developments and between adjacent developments and to lessen traffic congestion and increase connectivity. Pedestrian, bike, and vehicular access should be safe, direct, and convenient.
401-3.2. Blocks
A. Layout The lengths, widths, and shapes of blocks shall be determined with regard to:
1. Provision of adequate building sites suitable to the special needs of the type of use contemplated;
2. Applicable zoning district requirements as to lot size and dimensions;
3. Needs for convenient access, circulation, control, and safety of street traffic; and
4. Limitations and opportunities of topography.
B. Measurement
1. A block is bounded by a public street or a private street built to public standards (excluding alleys).
2. Block perimeter is measured from intersecting street centerlines.
3. The Board of Appeals may consider modification of the block perimeter requirements when steep slopes over 25%, pre-existing development, tree protection areas, stream buffers, cemeteries, open space, or easements would make the provision of a complete block infeasible.
C. Town Center Overlay, Town Center Districts, NR District, MU District
1. The following applies to developments in the TCO, TC, NR, or MU districts that are more than 5 acres in size.
2. Developments must incorporate existing or new streets that terminate at other existing or new streets to form an interconnected network with the maximum block perimeter lengths shown in Table 401-3.3., except as provided in clauses C.3 and 4 below.
Table 401-3.3. Towne Center, NR, MU Block Sizes Zoning Districts Block Perimeter TC-MU, MU 2,100 ft. max.
TC-R, NR 2,500 ft. max.
Town Center Overlay (not zoned TC-MU or TC-R 2,500 ft. max.
3. Blocks bounded by one or more State routes may increase their maximum permitted block perimeter lengths by an additional 100 feet for each abutting a State route.
4. There is no maximum block perimeter length when a block contains a civic space of at least 1 acre in size and when no other use is located in said block.
5. Streets used to satisfy this requirement must conform to Sec. 401-5 (Streets).
6. Streets may not be gated.
7. Other than stub-out streets, dead-end streets are not allowed unless a variance is granted by the Board of Appeals or City Council for topographic hardship.
(UDO 23-02, § 5, 6-12-2023)
401-3.3. Pedestrian Access In block faces over 1,000 feet long, the Director may, when existing or proposed pedestrian circulation patterns or public gathering places so justify, require pedestrian ways or pedestrian access easements, as appropriate, through the block.
401-3.4. Vehicular Access
A. Vehicular Access Required Any lot or site required to provide minimum frontage by the zoning district in which it is located must provide vehicular access directly from a public street or public alley built to the standards in these regulations except as provided in paragraph G below (Vehicular Access Easements).
B. Subdivisions
1. General
a. When land is subdivided into larger parcels that would allow further subdivision into building lots, such parcels must be arranged and designed to allow for the opening of future streets and to provide access to those areas not presently served by streets. The right-of-way for such future streets must be reserved and dedicated on the preliminary and final plats.
b. No subdivision may be designed to eliminate all street access to adjoining parcels of land. Proposed streets must extend to the boundaries of the tract to be subdivided. Every development must be designed to facilitate either pedestrian or vehicular access to adjoining properties that are developed or anticipated to be developed. Locations of inter-parcel access will be as required by and subject to the approval of the Director.
c. A stub street must be provided to the boundary of a development when necessary to provide access to a land-locked abutting property, for planned continuity of future circulation, for improved access for public safety vehicles, or for the extension of public water or other utilities to neighboring lands. Such stub streets must be designed to allow their reasonable extension and must be located to be reasonably incorporated into a street design for the neighboring property. The stub street requirement may be waived by the Director, in consultation with the Director of the Departments of Public Safety and the Gwinnett County Department of Public Utilities.
d. Stub streets on an abutting property must be extended into a proposed development and incorporated into its street design. This requirement may be modified by the Director when a serious topographical hardship or dissimilar zoning exists which would create unacceptable land use conflicts between the two developments. This modification may be conditioned on the provision of easements necessary for the extension of public utilities, the provision of a cul-de-sac or other permanent turnaround on the stub street, or the removal of the stub street back to its nearest intersection.
C. Towne Center Overlay, Towne Center Districts, NR District, MU District
1. Applicability The following applies to developments in the TCO, TC, NR, or MU districts that are more than five acres in size.
2. Stub-out Streets Required
a. Where a development abuts a parcel greater than five acres in size that is zoned TCO, TC-MU, TC-R, MU, NR, BG, OP, or CI, stub-out streets within the development must be installed to meet the block standards of Sec. 401-3.2.C.2.
This requirement applies regardless of whether subdivision is proposed.
b. The stub-out street right-of-way, pavement, and curbing must extend to the boundary of the abutting parcel to the point where the connection to the anticipated street is expected.
c. Stub-out streets must be located so that the portion of the block perimeter located on the development does not exceed 50% of the applicable block perimeter maximum.
3. Connecting to an Existing Stub-Out Street If a stub-out street exists on an abutting parcel, the street system of any new development must connect to the stub-out street to form a through street.
4. Exception The Board of Appeals may consider variances to eliminate the requirement for a stub-out street or require pedestrian and bicycle-only access when steep slopes over 25%, highways, waterways, tree conservation areas, stream buffers, cemeteries, open space, civic space, or easements would make the provision of a stub-out street infeasible.
D. Access Improvements for Single-Family Attached Subdivisions and Residential Subdivisions
1. When property that abuts upon an existing or proposed City street is to be developed or redeveloped as a single-family attached or residential subdivision and the City street will provide access to the property, project access improvements to the City street (deceleration lanes, turn lanes, etc.) must be provided by the developer as required by this paragraph.
2. A deceleration lane is required at each subdivision street entrance that is accessed from a minor collector street or major thoroughfare. If a street has an existing or proposed median, and the developer desires to construct a median break to serve the subdivision, then a left turn lane leading to the median break must be provided by the developer and must meet these standards.
3. Deceleration lanes must follow the standards included in Chapter 4 of GDOT's Driveway and Encroachment Control Manual. Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder must be dedicated by the developer to the City at no cost. Associated drainage improvements as deemed necessary by the construction of the deceleration lane are also required.
4. Other project access improvements may be required upon the recommendation of the Director to ensure adequate site access, pedestrian access, convenience, and safety to the motoring public.
5. The developer must relocate public or private utilities and drainage structures, as may be occasioned by the required project access improvements.
E. Access Improvements for Multifamily and Nonresidential Developments
1. When property that abuts upon an existing or proposed City street is to be developed or redeveloped for multifamily or nonresidential uses and the City street will provide access to the property, access improvements to the City street (deceleration lanes, turn lanes, etc.) must be provided by the developer.
2. A deceleration lane is required at each project driveway or subdivision street entrance, as applicable, that is accessed from a minor collector street or major thoroughfare. If a street has an existing or proposed median, and the developer desires to construct a median break to serve the project, then a left turn lane leading to the median break must be provided by the developer and must meet these standards.
3. Deceleration lanes must follow the standards included in Chapter 4 of GDOT's Driveway and Encroachment Manual. Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder must be dedicated by the developer to the City at no cost. Associated drainage improvements deemed necessary by the construction of the deceleration lane are also required.
4. Other project access improvements may be required by the Department upon the recommendation of the Director to ensure adequate site access, pedestrian access, convenience, and safety to the motoring public.
5. The developer is responsible for the relocation of public or private utilities and drainage structures as may be occasioned by the required project access improvements.
F. Dead End Streets
1. Where a dead end street (other than a cul-de-sac) serves more than three lots, the developer must provide a temporary vehicular turnaround within the right-of-way.
This requirement may be waived if an extension of the dead end street is approved and under construction before its inclusion in a final plat.
2. Where a street dead ends at the property boundary and the street exceeds 1,000 feet in length, a permanent cul-de-sac is required. In this situation, right-of-way to the property boundary is required, but the pavement may not extend to the property boundary beyond the edge of the paved cul-de-sac turnaround. In no case may a dead end street exceed 2,000 feet in length unless approved by the Director due to unusual topographic conditions or property configurations.
G. Vehicular Access Easements
1. Applicability The following applies when vehicular access is required by paragraph A above (Vehicular Access Required).
2. General Vehicular access may be provided from a public street indirectly via easement in any one or more of the following circumstances:
a. The property is a buildable lot of record, as defined herein, but does not meet the minimum frontage requirement of the applicable zoning district. The property must be served by an exclusive access easement which must be limited to the provision of access to only one principal use or structure.
b. The access easement serves a single-family residence on a lot which is otherwise a buildable lot of record, and which is sharing a common driveway with no more than one other single-family residence.
c. The access easement was lawfully established as such under the Code, ordinances, or regulations of the City of Snellville before the adoption of this
UDO.
d. The access easement coincides with a private street approved under this UDO.
e. The access easement serves a buildable lot of record which meets the minimum frontage requirements of this UDO, but at which point the access is not achieved.
H. Inter-parcel Access
1. Applicability The following applies in the TCO, TC, RM, RX, MU, NR, BG, HSB, LM, OP, or CI districts along State routes, arterial streets, and collectors when lots of any size abut a lot zoned TCO, TC, RM, MU, NR, BG, HSB, LM, OP, or CI.
2. General
a. Internal vehicular circulation areas must be designed and installed to allow for cross-access between abutting lots.
b. Vehicle cross-access may not be gated.
c. When an abutting lot is vacant or already developed, a stub for a future cross-access connection must be provided at the point where the connection to the abutting parcel is expected to occur in the future.
d. If a cross-access driveway stub exists on an abutting parcel, the internal vehicular circulation area must connect to the stub to form a cross-access connection.
e. When cross-access for vehicles is deemed impractical by the Director based on topography, the presence of natural features, or vehicular safety factors, relief from the requirement for cross-access may be granted by administrative variance. Bicycle and pedestrian connections must be provided between abutting parcels when cross-access relief is granted.
f. Property owners who establish cross-access easements must:
i. Allow pedestrian and vehicular access to all properties on the same block face as the property owner establishing the cross-access. Pedestrian and vehicular access is contingent upon the granting of reciprocal vehicular, bicycle and pedestrian access rights to the granting property;
ii. Record an easement allowing cross-access to and from properties served by the cross-access easement;
iii. Record a joint maintenance agreement requiring each property owner to maintain the vehicular, bicycle and pedestrian access areas on their lot;
iv. Contain a provision prohibiting the erection of fences, walls, and other obstructions that prevent the use of vehicular, bicycle and pedestrian access ways;
v. Include a statement that the cross-access agreement is conveyed with the land, is binding on all successors, heirs, and assignees, and that the easement rights are perpetual; and
vi. The cross-access agreement must be signed by all of the owners of the granting property.
(UDO 23-02, § 5, 6-12-2023)
Sec. 401-4. Streetscapes 401-4.1. General
A. Applicability Streetscapes must be installed when one or more of the following applies:
1. When a new public or private street is constructed; or
2. When a building is built, renovated, or repaired along an existing public street, except as provided in paragraph B below.
B. Exceptions Streetscapes are not required to be installed when one or more of the following applies:
1. When a building or site is renovated or repaired, and when there is no increase in floor area, and when there is no increase in the improved site area, and when said activity is not considered a substantial building permit.
2. When a building or site is increased in floor area or improved site area cumulatively by less than 25% and when said activity is not considered a substantial building permit.
3. When a single-family detached dwelling along an existing street is built, renovated, or repaired.
C. Variances The Board of Appeals may consider variances to the requirements of this section when one or more of the following applies:
1. When the required streetscapes would result in loss of an existing street tree, specimen tree, or special tree;
2. When an existing building is being renovated, repaired, or expanded and its existing placement limits the space available for the required streetscape;
3. When an existing building is being renovated, repaired, or expanded and existing topography prevents the installation of the required streetscape without requiring the construction of retaining walls 3 or more feet in height; or
4. When an existing building is being renovated or repaired and implementing the required streetscape would make a site non-conforming with regards to parking.
D. Location Standards When streetscapes are required, they must be installed:
1. On both sides of new public and private streets; and
2. Along the entire property frontage.
E. State Routes
1. Any development that abuts a State route must conform to the requirements of GDOT for access or improvements along State routes. Where a conflict exists between a requirement of this section and a GDOT requirement, the GDOT requirement applies.
2. An approved permit for proposed access or improvements is required by GDOT and must be incorporated into the construction drawings for the project before the issuance of a Land Disturbance Permit.
(UDO 23-02, § 5, 6-12-2023)
401-4.2. Streetscapes Required
A. General
1. All streetscapes that are required or installed must conform to Table 401-4.2.
Table 401-4.2. Streetscape Table Street Type Zoning & Overlay District Development Type Planter Sidewalk Local All districts except
TC-R, TC-MU, NR,
MU Residential Subdivision 5 ft. min. 4 ft. min.
Local TC-R, NR, MU All development types 5 ft. min. 6 ft. min.
Local TC-MU, TCO All development types 5 ft. min. 10 ft. min.
Principal Arterial, Major Arterial, Minor Arterial, Major Collector All districts except
TC-R, TC-MU, MU
All development types 5 ft. min. 6 ft. min.
Principal Arterial, Major Arterial, Minor Arterial, Major Collector
TC-R, TC-MU, TCO,
MU All development types 5 ft. min. 10 ft. min.
Alley All districts All other development types Not required Not required
2. On existing public streets where there is insufficient right-of-way for the required streetscape improvements, the right-of-way needed for such improvements may be expanded by mutual agreement between the property owner and the entity holding the right-of-way, or a public access easement may be dedicated to the City to meet the required improvements.
3. Where an easement is provided to the City:
a. The back of the minimum required sidewalk (adjacent to the lot) easement area is considered the lot line for the purpose of establishing required setbacks;
b. The easement area is not included in lot coverage calculations; and
c. The easement area does not count towards the minimum lot size requirements for new lots.
4. A greenway or multi-use trail may be required instead of a sidewalk along any new or existing street when the location has been identified for one in the Snellville Greenway Master Plan greenway, in any other official City plan or project, or by GDOT. See Sec. 401-5.2.B.
B. Towne Center Districts
1. All streetscapes that are required or installed must conform to Table 401-4.2.
2. Where a publicly funded streetscape using alternative planter standards was installed after January 1, 2010, the planter standards of the Table 401-4.2.B do not apply.
3. Where streetscape is required and a property abuts a parcel where no streetscape is required, the streetscape within 20 feet of such parcel must taper to provide a smooth transition to the existing sidewalk. If no existing sidewalks exist, the sidewalk must taper to a width of 6 feet.
4. Street trees must be planted in the planter as follows:
a. Street trees must conform to Sec. 207-3.4, except as otherwise specifically provided below.
b. Each tree must have a minimum of 40 square feet pervious planting area. The entire planting area must be planted with evergreen ground cover or a tree grate must be installed.
c. Street trees may count toward the landscape strip requirements of Sec. 207-3.2.
d. The area between required plantings must either be planted with evergreen ground cover or paved in accordance with clause B.6 below.
e. The Director must approve all plantings, planting replacements, and planting removals.
5. Tree grates are not required if sidewalk width requirements are met unless otherwise determined by the Director. If grates are installed, they must be at least 4 feet by 8 feet in size and of a type specified by the Director.
6. All paving must be approved by the Director.
7. No awning or canopy may extend over the planter.
8. Trash receptacles or similar elements, when installed, must be of a type specified by the Director in accordance with design standards utilized by the City for placement of such objects in the public right-of-way.
9. Decorative pedestrian lights must be installed as follows:
a. Lights must be installed in the planter, except as provided in "B.9.c" below, a maximum of 40 feet on center and spaced equal distance between street trees.
b. Lights must be of a type approved by the City for placement in the Towne Center public right-of-way.
c. Lights may be installed in an adjacent yard when GDOT prohibits placing them in the planter.
10. Utilities must be buried or placed to the rear of structures to allow for unobstructed use of sidewalks.
(UDO 22-01, § 6(Exh. I), 2-28-2022) 401-4.3. Design Standards All streetscapes that are required or installed must conform to the following unless a variance is approved by the Board of Appeals:
A. Streets trees must be located in the planter in conformance with Sec. 207-3.4.
B. Concrete curb and gutter are required where streetscapes are installed.
C. Sidewalks must be constructed of concrete and must be a minimum of 4 inches thick.
The concrete must be class "B" (as defined by GDOT) and have a strength of 2,200 psi at 28 days.
D. All new sidewalks must match and provide a smooth transition to any existing sidewalks with no steps. Curb ramps must be provided at all curb termini.
E. Expansion joints must be provided at all property lines (extended) and driveway crossings. Control joints must be provided every ten feet.
F. Disturbed areas resulting from sidewalk construction must be backfilled, stabilized and grassed.
G. All sidewalks must continue across any intervening driveway including any control or expansion joints. Hatched or stamped pattern concrete sidewalk must be used in the event the driveway apron consists of concrete.
(UDO 23-02, § 5, 6-12-2023)
401-4.4. Installation Deadlines
A. All required streetscapes must be installed before the issuance of a certificate of occupancy or final plat approval in accordance with this subsection unless a performance bond is posted. The cost of streetscape installation may be set aside in escrow where proposed road improvements may impact the location of the sidewalk.
B. Streetscapes required on residential building lots must be installed before the issuance of a certificate of occupancy for each individual dwelling.
C. Streetscapes required in recreation areas, open spaces, and retention/detention ponds must be installed before final plat approval.
D. Streetscapes required on other projects must be installed before issuance of a certificate of occupancy or certificate of completion, as appropriate.
Sec. 401-5. Streets 401-5.1. General
A. Applicability This section applies to all existing or new streets, both public and private.
B. Private Streets
1. Private streets must be designed and constructed to public standards.
2. Private street maintenance is the responsibility of private parties and must be clearly established on the final plat of the development.
3. Lots used exclusively for private streets (including alleys) are not required to conform to the minimum size, width, lot coverage, setback, or other zoning district or use standards of this UDO unless such standard also applies to a public street or is specifically required for private streets.
4. Private streets may be gated when approved by the Director upon finding that adequate provisions are made for emergency responder access and other public purposes.
C. Improvements Required Street improvements are required in accordance with this section, except as otherwise approved by the City Council.
D. Dedication of Street Right-of-Way Rights-of-way for existing and proposed public streets must be dedicated as follows:
1. Existing streets or thoroughfares must have additional right-of-way dedicated along their frontage;
2. In accordance with the street classifications as shown on the Gwinnett County DOT long-range road classification map included in the Gwinnett County Comprehensive Transportation Plan (CTP); and
3. In accordance with the widths required in Table 401-5.2.
401-5.2. Right-of-Way and Improvements
A. Right-of-way and Pavement Widths Public and private streets must be built according to one of the categories in Table 401-5.2.
The Director will determine classifications by referencing Gwinnett County DOT's road classification list for existing streets included in the County's CTP, where applicable.
Minimum widths for new construction (streets or project access improvements) must conform to Table 401-5.2.
B. Greenway Trails Public and private streets must incorporate width for a greenway or multi-use trail when the location has been identified for one in the Snellville Greenway Master Plan greenway, in any other official City plan or project, or by GDOT. The greenway or multi-use trail must either be in the roadway or in place of the required streetscape, per Sec. 401-4.2.A.4.
The Director may conduct a review of up to 90 days from the date of the permit application to determine the necessary location and design requirements of the facility. If, after the 90-day review, the Director is unable to reach a decision, there may not be any further delay of a requested permit for this situation.
C. Street Rights-of-Way The minimum width of public street right-of-way must be dedicated based upon the street categories shown in the Gwinnett DOT's long-range road classification map and this UDO.
1. Right-of-way beyond the width shown in Table 401-5.2 must be dedicated when the width is inadequate to accommodate any of the following improvements when required by this UDO or required to accommodate traffic, bicycle, and pedestrian safety:
a. Utility easement as required by the Gwinnett County Department of Public Utilities;
b. Deceleration lanes;
c. Sidewalks and streetscapes;
d. Greenway trails and bicycle facilities;
e. Turning lanes; Storage lanes;
f. Medians; and
g. Intersection realignments.
2. If the CTP, Gwinnett County, or the State of Georgia proposes a new street across a property, then right-of-way for the proposed street must be incorporated into the subdivision and dedicated to the City. The Director may conduct a review of up to 90 days from the date of the permit application to determine the necessary location and design requirements of the City, County, or State. If, after the 90-day review, the Director is unable to reach a decision, there may not be any further delay of a requested permit for this situation.
Table 401-5.2 Minimum Widths for New Streets and Project Access Improvements Street Category Design Speed
Minimum Right-of-Way[1] Minimum Roadway[2] Principal Arterial 55 mph 120 to 150 ft. 6 through lanes with a median Major Arterial 35—55 mph 100 to 120 ft. 67 ft; 4 to 6 through lanes with a median
Minor Arterial 45 mph 80 to 100 ft. 52 to 66 ft.; 4 through lanes with a median Major Collector 35 mph 80 ft. 52 ft.
Minor Collector 35 mph 60 to 80 ft. 28 ft.
Local Street •Nonresidential •Nonresidential cul-de-sac 25 mph N/A 60 ft.
60 ft. radius 32 ft.
50 ft. radius Local Street •Residential - Urban •Residential - Urban cul-de-sac 25 mph N/A 50 ft.
50 ft. radius 27 ft.
40 ft. radius Local Street •Residential - Rural •Residential - Rural cul-de-sac 25 mph N/A 60 ft.
60 ft. radius 24 ft.
40 ft. radius Local Street (Build to Rent) •Residential - Urban •Residential - Urban cul-de-sac 25 mph N/A 51 ft.
51 ft. radius 29 ft.
40 ft. radius Alley 10 mph 2 ft. 16 ft Table Notes:
[1] The greater right-of-way width applies under circumstances described in Sec. 401.5.2 (Right-of-Way and Improvements) and Sec. 401-3.4.D. (Access Improvements for SingleFamily Attached Subdivisions and Residential Subdivisions). Rights-of-way may be public or private.
[2] Roadway width dimensions exclude curb and gutter.
D. New Streets
1. In residential subdivisions, a dead end ("stub") street required by Sec. 401-3.4.B to provide access to an abutting property may be exempted from the construction of roadway improvements and public utilities under the following circumstances:
a. No lot within the proposed subdivision will gain access from the stub street.
b. A concept plan has not been submitted or approved on the neighboring tract.
c. The "stub" street must be fully designed as part of the development plans.
However, the right-of-way may only be cleared and rough graded in accordance with the approved plans, and all disturbed areas grassed.
d. Connections for future extension of all public utilities must be constructed as part of the subdivision. Curb returns must be constructed as part of the subdivision. Curb returns must be provided to the future "stub" street roadway location, and curb and gutter must be installed across the roadway stub at the right-of-way line (extended).
e. The right-of-way for the "stub" street must be dedicated as part of the final plat.
Slope easements or construction easements, if required by the street design, must be shown on the final plat.
E. Substandard Streets
1. If a development has access to an abutting substandard street (i.e., a dirt or gravel road), the street must be upgraded by the developer to a paved roadway from the project entrance to the nearest standard paved road along the route of access.
2. Off-site project access improvements required by "E.1" above must, at a minimum, result in a full-section roadway meeting the requirements of a local residential rural roadway (24 feet edge to the edge of the pavement, with drainage swale ditches as needed). Responsibilities are as follows:
a. The developer must design the road and provide the labor, equipment, and materials required for roadway improvements and necessary drainage improvements.
b. If the City desires the roadway to be improved to a standard greater than that for a local residential rural roadway, the City must provide or pay the cost of the additional materials and labor.
c. All right-of-way required for these off-site improvements must be acquired by the developer at no expense to the City. If the developer is unable to acquire the right-of-way, the City must initiate acquisition proceedings, at the expense of the developer, after authorization by the City Council.
F. Improvements along State Highways For any development which abuts a State route or other right-of-way controlled by the State of Georgia, improvements to the roadway and the location and design of any street or driveway providing access from the State route must comply with the standards and requirements of Chapter 4 of GDOT's Driveway and Encroachment Control Manual. A permit for the proposed access or improvements must be approved by GDOT and incorporated into the construction drawings for the project before the issuance of a development permit.
(UDO 22-03, § 7(Exh. C), 1-9-2023) 401-5.3. General Layout Requirements
A. Conformance The arrangement, character, extent, width, grade, and location of all streets must conform at a minimum to the standards that apply to their functional classification as determined by the Gwinnett County DOT and this UDO.
B. Local Streets and Minor Arterials or Collectors Local streets must be laid out [so] that their use by high-speed through traffic will be discouraged. Minor arterials or major collectors must be provided to channel through traffic movements within a development, where appropriate to the design and a major thoroughfare is not proposed by the Gwinnett County CTP. Major collectors or minor arterials also may be provided as central routes within large residential subdivisions, where appropriate to the design, based on project traffic demands exceeding 2000 trips per day (ADT).
C. Cul-de-sac Streets
1. Dead end streets designed to have one end permanently closed must provide a cul-de-sac turnaround and may not exceed 1,000 feet in length. Additional length necessitated by topography or property configuration may be approved by the Director.
2. The length of a cul-de-sac street is measured from the center of the cul-de-sac to the center of the intersection with another street that is part of the connected street network. Connections of cul-de-sac streets onto other cul-de-sac streets are prohibited.
3. Eyebrow cul-de-sacs (half cul-de-sacs) are prohibited.
4. Cul-de-sacs must conform to the layout and dimensional requirements as shown in the Standard Drawings.
D. Service Roads Where a development borders on or contains a railroad right-of-way, or limited access highway right-of-way or major thoroughfare, a public street may be required to be constructed and dedicated within the development approximately parallel to and on each side of such right-of-way. The service road must be separated from the major thoroughfare by a landscaped median, as shown in the City's standard drawings.
E. Half-streets Half-streets (new boundary streets with one-half of the minimum required right-of-way or pavement width) are not allowed nor is access to them permitted if they exist.
F. Reserve Strips Land in private ownership adjacent to public rights-of-way which could control or are intended to control access to streets, alleys, or public lands are not permitted unless their control is given to the City under ownership, dedication, or easement conditions approved by the City Attorney or acceptable to the Director. No development may be designed to deny access to abutting properties.
G. Alleys
1. Where Allowed. Public or private alleys may be provided:
a. Where existing topography prevents feasible access to a public street on the front of the lots; or
b. Where lots front a major arterial and traffic conditions make alley access safer and more desirable; or
c. Where allowed or required by the applicable zoning district; or
d. Where desirable to reduce pedestrian and vehicular conflicts.
2. Administration. The use and design of alleys must be approved by the Director.
3. Design. All alleys:
a. Must connect to a public street or a private street built to public standards;
b. Must have a minimum public right-of-way or private easement width of 20 feet;
c. Must have a minimum paved surface of 16 feet;
d. May not be used to meet fire lane access requirements; and
e. Are not required to provide curb and gutter or sidewalks.
4. Maintenance. Private alleys must be owned and maintained by a mandatory homeowner association.
H. Street Jogs
1. Street jogs must either directly align or have offsets of a minimum of 125 feet for local residential subdivision streets and a minimum of 200 feet for local, nonresidential subdivision streets, as measured between centerlines of said streets.
2. All principal arterials, minor arterials, major collectors, and minor collectors must provide offsets as required by the Department, where alignment is not desirable or feasible, but in no case be spaced less than 600 feet apart as measured between centerlines of said streets.
I. Traffic Calming
1. Residential subdivision streets must be designed in accordance with the Gwinnett County Traffic Calming Guide The maximum length of a roadway section between speed control points, as defined by the Traffic Calming Guide, is 500 feet.
2. The traffic calming plan is subject to review and approval by the Director. The Director may administratively grant modifications.
401-5.4. Traffic Control Devices
A. Traffic Control Signs Street signs, traffic control signs, and devices such as striping must be provided through the payment of fees to the City. Estimates of fees for other traffic control signs and devices may be determined by consulting a construction cost catalog, such as RS Means.
B. Street Name Signs Street name signs must have a green background with white legends mounted on channelized posts. Alternate post materials are subject to the review and approval of the Director. The posts and signs will be furnished and installed by the City at all street intersections. The developer (or homeowner association in the event an alternate signpost is chosen at a later date) must pay the City's costs.
C. Traffic Signals and Signs All traffic signals and signs must conform to the Manual on Uniform Traffic Control Devices (no decorative traffic control devices will be allowed).
D. Striping Requirements All newly constructed streets with four or more lanes (including auxiliary lanes) and existing streets being widened with one or more additional lanes must be striped or the payment of said striping costs are required from the developer by the Director before the approval of development conformance for the project. Striping must be accomplished with paint meeting GDOT standards conforming to the Manual on Uniform Traffic Control Devices.
E. Payment of Fees Payment for materials and installation of street names and traffic control signs in new developments is required by the Director before the approval of development conformance.
F. Street Lights
1. The installation of all street lighting fixtures within City rights-of-way must be approved by the Development before such installation.
2. Within residential subdivisions, decorative street lighting approved by the Director must be used. Payment for the light pole, fixture, and installation, and 1 year's power must be supplied by the developer before final plat approval.
3. Street lights must comply with the applicable requirements of Sec. 207-5 Lighting.
401-5.5. Specifications Unless otherwise specifically set forth herein, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction must conform to the latest specifications of GDOT.
401-5.6. Street Subgrade Preparation
A. Georgia DOT Specifications Subgrade preparation must be in accordance with GDOT specifications and these regulations.
B. Removal of Unsuitable Material If any sections of the subgrade are composed of topsoil, organic matter, or other unsuitable or unstable material, such material must be removed and replaced with suitable material and then thoroughly compacted as specified for fill or stabilized with stone, a geo-textile, or a geo-grid.
C. Fill Fill must be placed in uniform, horizontal layers not more than 8 inches thick (loose measurement). Moisture content must be adjusted as necessary to compact material to 95% of maximum dry density except for the top 12 inches which must be compacted to 100% of maximum dry density.
D. Utility Installation After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-of-way as appropriate, and the backfill in all such ditches thoroughly compacted, the subgrade must be brought to the lines, grades, and typical roadway section shown on the plans.
E. Trenches Utility trenches cut in the subgrade must be backfilled as specified herein. Compaction tests at the rate of one per 150 feet of the trench length must be provided to verify compaction.
F. Proofrolling The subgrade must pass roll testing before the placement of the base material. A geotextile or grid may be used to stabilize a subgrade that does not pass proofrolling.
G. Traffic Surface Before Completion When the street is to be used for construction traffic before the paving work is completed, a layer of stone (except crusher run) must be laid as a traffic surface. This material may not be used as a part of the base material. It may be worked into the subgrade, or it must be removed before the base course is set up for paving.
H. Drainage Provisions must be made to drain low points in the road construction when the final paving is delayed. A break in the berm section is required when the curbing has not been constructed. After installation, drainage under the curb to side slopes is required using minimum 4-inch diameter pipe sections. See the diagram below.
401-5.7. Access Improvement Standards
A. Sections 5 Feet or Greater in Width For sections 5 feet or greater in width, the section must use Class A concrete and comply with GDOT's standards and detail. The base course must pass roll testing before paving.
If a delay in paving is reasonably expected by the developer or the Department, the base must be sealed and retested before paving.
B. Sections Less than 5 Feet in Width For sections less than 5 feet wide, 7 inches of class A concrete base (5 inches on local and minor collector streets) are required and sections must comply with GDOT standards.
401-5.8. New Local, Minor Collector Streets
A. All new local and minor collector streets must conform to this subsection.
1. Asphalt Streets. The following types of base materials may be used:
a. Crushed Stone Base. The base course must consist of at least 8 inches of graded aggregate base. After being thoroughly compacted and brought to the proper section, an intermediate course of 2 inches of 19 mm Superpave must be applied. If a delay in paving is reasonably expected by the developer or the Department, the base must be primed the same day it is compacted, and cured in accordance with GDOT standards.
b. Soil Cement Base.
i. If the base material (resident soil) is unsatisfactory to the Director, a soil cement mix design with engineer test results acceptable to the Director must be submitted. The design must come from a geotechnical firm with the results certified by a professional engineer registered in the State of Georgia. The tests required for the design are ASTM D558 or AASHTO T134 or ASTM D559 and/or 560 or AASHTO T135 and 136.
ii. The minimum base course must consist of at least 6 inches of suitable soil (high mica content not suitable) stabilized with 10% of Portland cement by volume (approximately 42.3 pounds per square yard). Depending on
whether the street is to be constructed as a one-pass or two-pass street.
Binder and/or paving must conform to Sec. 401-1.1.A.1.a. Where the grade of the street is 5% or greater, a single surface treatment course must be applied before the binder.
c. Concrete Streets. Due to their difficult maintenance requirements, the City discourages the installation of concrete streets. Special design plans must be submitted by the applicant to the Department for review and approval before installation.
401-5.9. New Major Thoroughfares Major thoroughfares must be constructed in accordance with designs prepared by the City, Gwinnett County, or GDOT.
401-5.10. Curb and Gutter
A. Required All new public and private streets, public and private project access improvements, and public and private non-single-family detached dwelling parking lots must be provided with curb and gutter. All gutters must drain smoothly with no areas of ponding. Parking wheel stops are required in non-single-family detached dwelling parking lots with stormwater management low impact development (LID) measures to promote shield flow to channels/stormwater management facilities.
B. Residential Curbing Residential curbing must meet the following requirements:
1. Concrete must be class "A" (as defined by GDOT) and have a minimum strength of 3,000 psi at 28 days.
2. The typical minimum section is 6" × 24" × 12".
3. Vertical curbing only.
C. Industrial or Commercial Curbing Industrial or commercial curbing must meet the following requirements:
1. Concrete must be class "A" (as defined by GDOT) and have a minimum strength of 3,000 psi at 28 days.
2. The typical minimum section is 8" × 24" × 14".
3. Vertical curbing only, except median curbs, should be sloped similar to GDOT Type 7, to allow emergency vehicles to mount curb.
D. Principal Arterial and Major Arterial Curbing Principal arterial and major arterial curbing must meet the following requirements:
1. Concrete must be class "A" (as defined by GDOT) and have a minimum strength of 3,000 psi at 28 days.
2. The typical minimum section is 8" × 30" × 14".
3. Vertical curbing only, except median curb, should be sloped similar to GDOT Type 7, to allow emergency vehicles to mount curb.
E. Construction Methods
1. Curb and gutter must be set true to line and grade, must be horizontal, must be field staked, and must be finished to the section shown on the plans. Along project access improvements of a road which the City maintenance department has identified for resurfacing within 1 year of the new construction, the grade of the new gutter must be placed 1 inch above the project access improvement pavement grade in areas where drainage will not be adversely affected.
2. Line and grade must be set by the developer's engineer or surveyor on grades less than 2% and over 12%, and within 100 feet in both directions from all low points.
3. One-half inch expansion joints or premolded bituminous expansion joint material must be provided at all structures and radius points and at intervals not to exceed 250 feet in the remainder of the curb and gutter.
4. Inferior workmanship or unprofessional construction methods resulting in unacceptable curb and gutter will be cause for rejection of the finished work.
5. Disturbed areas along all curbing must be backfilled, stabilized and grassed.
401-5.11. Roadway Design
A. Street Grades and Design Speeds
1. The minimum allowed grade for local and minor collector streets is 0.3%. The minimum for major collector and arterial streets must conform to GDOT practice.
2. A minimum grade of less than 0.3% on a local street may be approved by the Department, based on adequate engineering designs, where at least 0.3% cannot reasonably be achieved due to topographical limitations imposed by the land. In such cases, a record drawing and such computations as necessary must be provided after construction to establish that the street will drain in accordance with these regulations. Street sections where unacceptable pooling, excessive spread at catch basins, or other hazardous conditions occur must be reconstructed or otherwise improved to eliminate such conditions.
3. Minimum vehicle design speeds and maximum grades allowable in the City by street classification are as shown in Table 401-5.11.
4. The maximum grade on any cul-de-sac turnaround is 6%.
Table 401-5.11A Design Speeds and Grades Street Category Maximum Grade Design Speed Principal arterial 6% 55 MPH Major arterial 8% 35—55 MPH Minor arterial 10% 25—35 MPH Major collector 10% 25—30 MPH Minor collector 10% 20—25 MPH Local 15%[1] 20—25 MPH Table Note [1] Grades between 12% and 14% may not exceed a length of 150 feet and require an "as graded" survey before the installation of the curb or utilities. The distance is measured as the tangent length between points of curvature.
B. Vertical Street Alignment
1. All changes in street profile grades with an algebraic difference greater than 1% must be connected by a parabolic curve with a minimum length (L) equal to the product of the algebraic difference between the grades in percent (A) and the design constant (K) assigned to the street according to its category (i.e., L = KA).
2. Constant (K) values are shown in Table 401-5.11B. Constant (K) Values for Vertical Curves for both desirable and minimum acceptable ("hardship") conditions. In all cases, the "desirable" value must be used, unless it cannot be achieved due to topographic conditions beyond the developer's control. In such hardship situations, the Director may approve a lesser value to the extent required by the hardship situation, but in no event less than the value shown in the table as "minimum."
Table 401-5.11B. Constant (K) Values for Vertical Curves Crest Curves Sag Curves Street Category Min. Desirable Min. Desirable Principal arterial 151 151 136 136 Major arterial 84 84 96 96 Minor arterial 43 44 64 64 Major collector 43 44 64 64 Minor collector 20 20 37 37 Crest Curves Sag Curves Street Category Min. Desirable Min. Desirable Local 10 10 17 17
C. Horizontal Street Alignment
1. All new streets must adhere to the following standards governing horizontal curvature and superelevation:
Table 401-5.11C Horizontal Curves Street Category Minimum Radius Maximum Superelevation Principal arterial 1,333 ft 0.06 Major arterial 833 ft 0.06 Minor arterial 485 ft 0.06 Major collector 485 ft 0.06 Minor collector 231 ft 0.06 [1] Local 81 ft 0.06 Table Note [1] No superelevation is allowed on minor collectors internal to residential subdivisions.
2. Superelevation for horizontal curves must be calculated utilizing the following formula:
R = min. radius curve v = vehicle design speed (MPH) e = rate of superelevation (decimal of a foot rise per foot of roadway R = (mb=6q) v(mb=0)(mb=4q)2(mb=0)
15(e + f) f = side friction factor, as follows:
Vehicle design speed (v) 30 40 50 60 Side friction factor (f) .27 .23 .20 .18
3. Widening section along existing streets must be designed reflecting existing curvature and superelevation, if any, unless the existing street has been included in a specific design by the County or GDOT which calls for different standards, in which case the project will be coordinated with the overall design.
4. Roadway edge curves must be provided for tangent runout (bringing edge from a normal crown to centerline elevation) and superelevation runoff (from the end of tangent runout to the point of design superelevation) in accordance with design standards of GDOT or other professional engineering standards.
5. Between reverse horizontal curves there may be no less than the minimum centerline tangents shown in Table 401-5.11D unless otherwise specified by GDOT.
Compound radii curves are prohibited. At least the "desirable" length must be provided unless hardship conditions of topography or property configuration will not allow lengths greater than those shown as "minimum." For compound circular curves, the ratio of the flatter radius to the sharper radius may not exceed 1.5 to one.
Table 401-5.11D Tangents Street Category Minimum Tangent Length Desirable Tangent Length Principal arterial 150 ft 180 ft Major arterial 125 ft 150 ft Minor arterial 100 ft 120 ft Major collector 100 ft 120 ft Minor collector 75 ft 90 ft Local 50 ft 60 ft Table Note Minimum tangents are based on the distance traveled in 1.7 seconds at the design speed for each category of the street. Desirable length is based on distance traveled in 2.0 seconds.
D. Horizontal and Vertical Clearance
1. Horizontal Clearances
a. A shoulder of no less than 11 feet from the back of the curb or the edge of the pavement, appropriately graded and with gentle slopes of not more than 0.5 inch per 1 foot and rounded cross-sectional design, must be maintained along all streets. Beyond the shoulder but within the right-of-way, slopes may not exceed 1 foot of rise for every 2 feet of horizontal distance on a cut slope, and 1 foot of fall for each 3 feet of horizontal distance on a fill slope.
b. Along all public streets, a clear zone must be provided for a minimum distance of 6 feet from the back of the curb or the edge of the pavement wherein nothing may be located above ground level except for traffic and street signs, public utility structures, and mailboxes.
c. At selected locations, such as the outside of a sharp curve, a wider clear zone with greater horizontal clearances provided to any roadside obstruction may be required.
d. The Department, in accordance with Georgia Law 32-6-51, is authorized to remove or direct the removal of any sign, signal, device, or other structure erected, placed, or maintained on the right-of-way of a public road that, because of its nature, construction, or operation, constitutes a danger to, or interferes with the vision of, drivers of motor vehicles.
2. Vertical Clearances. Vertical clearance at underpasses must be at least 16.5 feet over the entire roadway width.
401-5.12. Street Intersections
A. Angle of intersection
1. Intersections must generally be at right angles.
2. Intersections may not be at an angle of less than 85 degrees unless approved by the Director.
3. Intersections may not be at an angle less than 70 degrees unless the intersection is signalized and approved by the Director.
B. Maximum Grade Street intersections should be designed with a flat grade wherever possible, but in no case should the grade exceed 2% in normal situations (or 4% in topographical hardship situations on local streets).
C. Approach Horizontal Alignment
1. New local streets that approach an intersection with a street in a category higher than itself on a horizontal curve with a centerline radius less than 240 feet must provide a tangent section of roadway at least 30 feet long. Minor collectors approaching an intersection with a major thoroughfare on a horizontal curve with a centerline radius of less than 550 feet must also provide the 30-foot tangent section.
The tangent length is measured along the centerline of the street, from the right-of-way line of the intersecting street, extended, to the point of tangency with the centerline of the curved section.
2. New major thoroughfares must provide tangent sections at intersections with streets in equal or higher categories as needed to provide adequate stopping distances at their design speeds.
D. Approach Vertical Alignment
1. For intersections with local or minor collector streets, a leveling of the street at a grade not exceeding 2% must be provided but no level approach distance is required for streets approaching at less than 7%, and a minimum 25-foot level approach distance may be provided for streets approaching at a grade of 7% or more. (See standard drawings).
2. As a street approaches an intersection with a major thoroughfare, there must be a suitable leveling of the street at a grade not exceeding 2% and for a distance not less than the following minimums:
Table 401-5.12D Approach Distances at Major Intersections Approaching Street Category Minimum Approach Distance[1] Principal arterial 100 ft Major arterial 100 ft Minor arterial 100 ft Major collector 75 ft Minor collector 75 ft Local 50 ft Table Note [1] Distance of the approach is measured from the edge of the pavement of the intersecting street to the point of curvature in the approaching street.
E. Intersection Radii Intersection radii for roadways measured at the back of the curb and for the right-of-way lines must be as follows. For intersecting streets of different classification, the larger radii must be provided. In all cases, adequate right-of-way must be provided to maintain a minimum of 11 feet from the back of the curb. Larger radii may be required for streets intersecting at angles less than 90 degrees. Roadway radii must be increased to 75 feet on roads with heavy truck traffic.
Table 401-512E Intersection Radii Street Category Minimum Roadway Radii Maximum Roadway Radii
R-O-W
Radii [1] Arterial 35 ft 50 ft 20 ft Major collector 35 ft 50 ft 20 ft Minor collector— Residential 35 ft 50 ft 9 ft Minor collector— Nonresidential 35 ft 50 ft 20 ft Local—Residential 35 ft 50 ft 9 ft Local—Commercial or office 35 ft 50 ft 11 ft Local—Industrial 35 ft 50 ft 25 ft Table Note [1] Intersecting right-of-way lines may be joined by an arc with the minimum radius shown, or by a miter which cuts across the right-of-way lines connecting the points where the required radius would have otherwise been tangent.
F. Islands Islands in street intersections must conform to the design requirements of the City's standard drawings. In no case may anything in an island extend more than 3 feet above the street grade within the right-of-way, except traffic regulatory devices and other infrastructure erected or approved by the City. No island may be approved which contains less than 100 square feet.
G. Intersection Corner Sight Distance
1. Intersections must be designed with adequate corner sight distance for each street which approaches a street in an equal or higher street category (except an intersection of two local streets). Where necessary, backslopes must be flattened and horizontal or vertical curves lengthened to provide the minimum required sight distance.
2. The minimum corner sight distance from the approaching street must be equal to or exceed ten times the regulated speed of the intersecting street, as measured from the center of the approaching street in both directions along the right-of-way line of the intersecting street. As an alternative, the minimum corner sight distance requirement may be calculated using AASHTO's "Policy on Geometric Design of Highways and Streets," chapter 9 (at-grade intersections), latest edition. The sight distance must provide clear visibility of an object 4 feet above the intersecting street viewed from the centerline of the approaching street at the right-of-way line of the intersecting street, at a height of 3.5 feet above the ground.
H. Obstructing Visibility at Intersections On any corner lot, the requirements of Sec. 201-1.8 (Intersection Visibility) also apply.
I. Turning Lanes at Intersections
1. Left turning lanes are required on all new internal project streets, classified as a minor collector or major thoroughfare, intersecting a major thoroughfare, and may be required in other locations to meet traffic demand and safe operations. Right turning lanes may be required to meet traffic demands or safety concerns. When provided, turning lanes must meet the following criteria:
a. Storage length. A minimum of 150 feet of storage length for turning lanes on any arterial roadway must be used. A minimum of 100 feet of storage length for turning lanes on all collectors must be used.
b. Taper length. The minimum taper length is 50 feet.
2. Left turning lanes from arterial roads are subject to longer storage lengths and tapers as determined on a case by case basis.
401-5.13. Driveways
A. Angle and Improvements Driveways must generally intersect streets at right angles. All private driveways must be paved. The portion of a driveway located within a public right-of-way must be paved.
Driveways providing access to parking lots that contain six or more spaces must be paved in accordance with the parking lot requirements of this UDO.
B. Design Standards
1. Driveways serving single-family detached or two-family dwellings may be no less than 10 feet wide at the right-of-way line and must provide a radius to the back of the curb or the edge of the pavement of the roadway of no less than 5 feet. All other driveway curb cuts on public streets must conform to the standards shown on the driveway details contained in the City's standard drawings, by land use type as follows:
a. Driveway detail 1 (32-foot width, 25-foot radius) for:
i. Gas stations;
ii. Commercial sites (over 80,000 square feet);
iii. Office/institutional complexes (over 100,000 square feet); and iv. Residential developments, except residential subdivisions (over 200 units).
b. Driveway detail 2 (28-foot width, 25-foot radius) for:
i. Commercial sites (80,000 square feet or less);
ii. Office/institutional complexes (100,000 square feet or less); and iii. Residential developments, except residential subdivisions (200 units or fewer).
c. Driveway detail 3 (32-foot width, 40-foot radius) for:
i. Industrial sites.
d. Driveway detail 4 (optional design with island) for:
i. Private commercial/office street entrances.
e. Private entrances to residential developments, except residential subdivisions (over 200 units).
2. All driveways and driveway curb cuts on State routes must conform to GDOT Driveway and Encroachment Control Standards unless City requirements are more restrictive.
C. Auxiliary Lanes Along any major thoroughfare, a deceleration lane, acceleration lane, larger turning radius, traffic islands, or other devices or designs may be required to avoid specific traffic hazards that would otherwise be created by the proposed driveway location.
D. Corner Sight Distance along Minor Collectors or Major Thoroughfares All driveways approaching a minor collector or major thoroughfare must provide adequate corner sight distance. The minimum corner sight distance from the driveway must be equal to or exceed the standards of AASHTO's "Policy on Geometric Design of Highways and Streets," chapter 9 (at-grade intersections). The sight distance must provide clear visibility of an object 4 feet above the intersecting street viewed from the centerline of the driveway at the right-of-way line of the intersecting street, at a height of 3.5 feet above the ground.
E. Separation and Spacing All driveways except those serving residential units on individual lots are recommended to meet the following criteria:
1. Minimum separation from a street intersection: 100 feet from the centerline of a driveway to the nearest right-of-way line of the intersecting street, extended. For any driveway on a major thoroughfare with a centerline between 100 feet and 200 feet from the intersecting street right-of-way line, access restriction may be imposed to avoid traffic hazards. Greater separation may be required for the safe operation of a free-right lane, acceleration or deceleration lane, etc.
2. Minimum separation between driveways along the same side of a major thoroughfare:
100 feet between centerline as measured along the roadway edge or back of curb.
3. Whenever possible, proposed driveways along one side of a street must coincide with existing or proposed driveways on the opposite side of such street.
4. Maximum number of driveways serving a single project: one for every 400 feet of property frontage, or fraction thereof per street, along a major thoroughfare. This is not meant to be a spacing standard but only an expression of the total number of driveways that are permitted serving a single project.
ARTICLE 2. GRADING, EROSION, AND SEDIMENTATION
Sec. 402-1. Grading 402-1.1. Grading Plan
A. Grading must be done in accordance with the contour lines and grades shown on the approved Grading Plan.
B. Grading plans must show existing and proposed contour lines at an interval of no more than 2 feet. Grading plans shall outline the areas which are required to remain undisturbed (i.e., Tree Protection Areas, buffers, etc.) and must indicate protective fencing or staking to be placed surrounding such areas.
C. Grading for roads and improved ditches must be shown.
D. A grading plan, showing building pad locations, must be submitted for single-family detached dwelling and two-family dwelling subdivisions zoned for a lot size of less than 12,000 square feet or a density of 4 units per acre or more unless a modification application is approved.
E. Single-family detached dwelling and two-family dwelling subdivision lots must be graded to ensure adequate lot-to-lot drainage. Granting a modification will not nullify the intent of this UDO when the layout has a minimum lot area of 14,520 square feet and a minimum lot width of 90 feet. The grading plan may be used as a construction document before the approval of the Final Plat or as a guidance document for the individual lot grading after approval of the final plat.
402-1.2. Embankments Embankment layering must be consistent with the Gwinnett County Stormwater Management Manual.
402-1.3. Maximum Slopes
A. The maximum slope for cut and/or fill is 2:1 (2 feet of horizontal run for each foot of rise or fall), except: 1) for earthen dam embankments; 2) rock cuts; 3) where certified by a professional geotechnical engineer; or 4) as discussed in paragraph B below.
B. The maximum slope for earthen dam embankments is 3:1 unless a modification application is approved. The earthen dam embankment slope regulation intends to provide for public safety, soil stability, and dam maintenance considerations. The depth of cut referred to herein is the maximum cut or fill allowed to occur in any one section of cut or fill.
The slope of cut or fill must be uniform throughout for each section of cut or fill unless benching is approved by the City.
C. Maximum slopes must otherwise be consistent with the Gwinnett County Stormwater Management Manual.
402-1.4. Soil Stabilization Special conditions for soil with low shearing resistance and cohesion are required as specified in the Gwinnett County Stormwater Management Manual.
Sec. 402-2. Soil Erosion and Sedimentation Control 402-2.1. Title This section is known as the "Soil Erosion and Sedimentation Control Ordinance."
402-2.2. Applicability
A. Design standards This section applies when any land disturbance is proposed that requires a permit under this section and continues to apply until the project has been completed.
B. Abandoned projects Any project whose permit has lapsed under the terms of this UDO must immediately have all disturbed areas stabilized. This responsibility falls upon the owner, developer, contractor, or other responsible parties involved in the land disturbance activity.
402-2.3. Exemption This section applies to any land-disturbing activity undertaken by any person on any land, except for the following:
A. Surface mining, as the same is defined in O.C.G.A. § 12-4-72, the "Georgia Surface Mining Act of 1968."
B. Granite quarrying and land clearing for such quarrying.
C. Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion.
D. The construction of single-family residences, when such construction disturbs less than 1 acre and is not a part of a larger common plan of development or sale with a planned disturbance or equal to or greater than 1 acre and not otherwise exempt under this subsection; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A. § 12-7-7 and this Paragraph D. For single-family residence construction covered by the provisions of this paragraph there shall be a buffer zone between the residence and any State waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such stream buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the Director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-7- 6(b) and the buffer zones provided by this paragraph shall be enforced by the issuing authority.
E. Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions," to include:
1. Raising, harvesting or storing of products of the field or orchard;
2. Feeding, breeding or managing livestock or poultry;
3. Producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits, or for use in the production of poultry, including, but not limited to, chickens, hens, and turkeys;
4. Producing plants, trees, fowl or animals; and
5. The production of aquaculture, horticultural, dairy, livestock, poultry, eggs and apiarian products, and farm buildings and farm ponds.
F. Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a stream buffer, as established in Sec. 402-2.4.C.15 and Sec.
402-2.4.C.16, no other land-disturbing activities, except for normal forest management practices, are allowed on the entire property upon which the forestry practices were conducted for 3 years after completion of such forestry practices.
G. Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture.
H. Any project involving less than 1 acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater 1 acre or within 200 feet of the bank of any State waters. For the purposes of this Paragraph H, the term "State waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than 1 acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs A, B, C, D, E, F, G, I, or J of this section.
I. Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of transportation, the Georgia Highway Authority, or the State Road and Tollway Authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or State Road and Tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A.
§ 12-7-7.1; except where the department of transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the State general permit, in which case a copy of a notice of intent under the State general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders.
J. Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission. Any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A.
§ 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A.
§ 35-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the State general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
K. Any public water system reservoir.
402-2.4. Minimum Requirements
A. General Provisions Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES general permit are not met.
Therefore, plans for those land-disturbing activities which are not exempted by this section shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices must conform to the minimum requirements of Sec.
402-2.5.B and Sec. 402-2.5.C. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation, and pollution during all stages of any land-disturbing activity in accordance with the requirements of this section and the NPDES general permit.
B. Minimum Requirements/BMPs
1. Best management practices as set forth in Sec. 402-2.5.B and Sec. 402-2.5.C are required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices will constitute a complete defense to any action by the Director or to any other allegation of noncompliance with clause 2 immediately below or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to subsection O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act." As used in this paragraph the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b).
2. Discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained will constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any State general permit issued by the division pursuant to O.C.G.A.
§ 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than 10 nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters will be measured in accordance with guidelines to be issued by the Director. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than 5 acres.
3. Failure to properly design, install, or maintain best management practices will constitute a violation of any land-disturbing permit issued by a local issuing authority or of any State general permit issued by the division pursuant to O.C.G.A.
§ 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such failure occurs.
4. The Director may require, in accordance with regulations adopted by the Board of Natural Resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.
5. The LIA may set more stringent buffer requirements than stated in paragraphs C.15 and C.16 below in light of O.C.G.A. § 12-7-6(c).
C. Manual for Erosion and Sediment Control in Georgia Adopted The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.
§ 12-7-1 et seq. to govern land-disturbing activities will require, at a minimum, protections at least as stringent as the State general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
1. Stripping of vegetation, regrading, and other development activities must be conducted in a manner to minimize erosion;
2. Cut-fill operations must be kept to a minimum;
3. Development plans must conform to topography and soil type to create the lowest practicable erosion potential;
4. Whenever feasible, natural vegetation shall be retained, protected and supplemented;
5. The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
6. Disturbed soil shall be stabilized as quickly as practicable;
7. Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
8. Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
9. To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this clause, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A.
§ 12-7-1 et seq.;
10. Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
11. Cuts and fills may not endanger adjoining property;
12. Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
13. Grading equipment must cross flowing streams using bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
14. Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in this section;
15. Except as provided in clause C.16 immediately below, there is established a 25-foot buffer along the banks of all State waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the Director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term "ephemeral stream" means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the groundwater table year-round; for which groundwater is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the Director as provided in this clause. The following requirements shall apply to any such buffer:
a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or (ii) stream crossings for sewer lines; and
16. There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any State waters classified as "trout streams" pursuant to Article 2 of Chapter 5 of Title 12, the "Georgia Water Quality Control Act," except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Board of Natural Resources, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The Director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented.
The following requirements shall apply to such buffer:
a. No land-disturbing activities may be conducted within a buffer and a buffer must remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer does not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or (ii) stream crossings for sewer lines.
D. Stream Buffer Requirements Nothing contained in O.C.G.A. § 12-7-1 et seq. will prevent any local issuing authority from adopting rules and regulations, ordinances or resolutions which contain stream buffer requirements that exceed the minimum requirements in this section.
E. Presumption of Violation The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of a violation of the standards provided for in this section or the terms of the permit.
402-2.5. Application/Permit Process
A. General The property owner, developer and designated planners and engineers must design and review before submittal the general development plans. The local issuing authority must review the tract to be developed and the area surrounding it. They must consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this section, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
B. Application Requirements Application requirements are as follows:
1. No person may conduct any land-disturbing activity within the City of Snellville without first obtaining a permit from the City of Snellville to perform such activity and providing a copy of the notice of intent submitted to EPD if applicable.
2. The application for a permit must be submitted to the Department and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans must include, at a minimum, the data specified in paragraph C below. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land-disturbing activity proposed will be carried out in such a manner that the provisions of Sec.
402-2.4.B and Sec. 402-2.4.C will be met. Applications for a permit will not be accepted unless accompanied by three copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site before the creation of the plan in accordance with EPD Rule 391-3-7-.10.
3. In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A. § 12-5-23(a)(5), provided that such fees may not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the State general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees must be paid before the issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which must give notice pursuant to O.C.G.A. §§ 12-7-17(9) or (10) must be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
4. Immediately upon receipt of an application and plan for a permit, the local issuing authority must refer the application and plan to the Gwinnett Soil and Water Conservation District for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation, and pollution control plan. The Gwinnett Soil and Water Conservation District shall approve or disapprove a plan within 35 days of receipt. Failure of the Gwinnett Soil and Water Conservation District to act within 35 days will be considered an approval of the pending plan. The results of the Gwinnett Soil and Water Conservation District review will be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the Gwinnett Soil and Water Conservation District, and any variances required by Sec.
402-2.4.C.15 and Sec. 402-2.4.C.16 have been obtained, all fees have been paid, and bonding, if required by clause B.6 below, been obtained. Such a review will not be required if the local issuing authority and the Gwinnett Soil and Water Conservation District have entered into an agreement that allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the Gwinnett Soil and Water Conservation District. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.
5. If a permit applicant has had two or more violations of previous permits, this section, or the Erosion and Sedimentation Act, as amended, within 3 years before the date of filing the application under consideration, the local issuing authority may deny the permit application.
6. The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, before issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions will not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
C. Plan Requirements
1. Plans must be prepared to meet the minimum requirements as contained in Sec.
402-2.4.B and Sec. 402-2.4.C, or through the use of more stringent, alternate design criteria that conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this section. The plan for the land-disturbing activity must consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and State laws. Maps, drawings, and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the Georgia State Soil and Water Conservation Commission and in consultation with the section and the stakeholder advisory board created pursuant to O.C.G.A.
§ 12-7-20.
2. Data required for the site plan includes all the information required from the appropriate erosion, sedimentation, and pollution control plan review checklist established by the Georgia State Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted.
D. Permits
1. Permits must be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid before permit issuance. The permit must include conditions under which the activity may be undertaken.
2. No permit may be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the Gwinnett Soil and Water Conservation District and the local issuing authority has affirmatively determined that the plan complies with this section, any variances required by Sec.
402-2.4.C.15 and Sec. 402-2.4.C.16, bonding requirements, if necessary, as per paragraph B.6 above, are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial must be furnished to the applicant.
3. Any land-disturbing activities by a local issuing authority will be subject to the same requirements of this section, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.
4. If the tract is to be developed in phases, then a separate permit will be required for each phase.
5. The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or their successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or their successor in title is in violation of this section. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
6. The LIA may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within 3 years before the date of the application, in light of O.C.G.A.
§ 12-7-7(f)(1).
402-2.6. Inspection and Enforcement
A. Inspection and Enforcement
1. The City inspector will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority will regulate primary, secondary and tertiary permittees as such terms are defined in the State general permit. Primary permittees will be responsible for the installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees will be responsible for the installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees will be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this section, a written notice to comply must be served upon that person. The notice must set forth the measures necessary to achieve compliance and must state the time within which such measures must be completed. If the person engaged in the landdisturbing activity fails to comply within the time specified, he shall be deemed in violation of this section.
2. The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
3. The City of Snellville shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this section, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
4. No person may refuse entry or access to any authorized representative or agent of the local issuing authority, the Georgia State Soil and Water Conservation Commission, the Gwinnett Soil and Water Conservation District, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out their official duties.
5. The Gwinnett Soil and Water Conservation District or the Georgia State Soil and Water Conservation Commission or both will semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). The Gwinnett Soil and Water Conservation District or the Georgia State Soil and Water Conservation Commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation, and pollution control program. The Gwinnett Soil and Water Conservation District or the Georgia State Soil and Water Conservation Commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
6. The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7- 8(a). Such review may include, but is not limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the Gwinnett Soil and Water Conservation District and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division must notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified will have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division will revoke the certification of the county or municipality as a local issuing authority.
402-2.7. Penalties and Incentives
A. Failure to Obtain a Permit for Land-disturbing Activity If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this section without first obtaining said permit, the person will be subject to revocation of their business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
B. Stop Work Orders
1. For the first and second violations of the provisions of this section, the Director or the local issuing authority must issue a written warning to the violator. The violator will have 5 days to correct the violation. If the violation is not corrected within 5 days, the Director or the local issuing authority must issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the State or if the land-disturbing activities are conducted without obtaining the necessary permit, the Director or the local issuing authority must issue an immediate stop-work order in lieu of a warning.
2. For a third and each subsequent violation, the Director or the local issuing authority must issue an immediate stop-work order.
3. All stop-work orders will be effective immediately upon issuance and will be in effect until the necessary corrective action or mitigation has occurred.
4. When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the Director, have been or are being discharged into State waters and where best management practices have not been properly designed, installed and maintained, a stop-work order shall be issued by the local issuing authority or by the Director. All such stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
Such stop-work orders will apply to all land-disturbing activity on the site except for the installation and maintenance of temporary or permanent erosion and sediment controls.
C. Bond Forfeiture If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply must be served upon that person. The notice must set forth the measures necessary to achieve compliance with the plan and must state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he will be deemed in violation of this section and, in addition to other penalties, shall be deemed to have forfeited their performance bond, if required to post one under the provisions of Sec. 402-2.5.B.6. The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
D. Monetary Penalties Any person who violates any provisions of this section, or any permit condition or limitation established pursuant to this section, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the Director issued as provided in this section shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this section, notwithstanding any provisions in any City Charter to the contrary, municipal courts will be authorized to impose a penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of County ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this section under County ordinances approved under this section will be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
402-2.8. Education and Certification
A. Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity must meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the Georgia State Soil and Water Conservation Commission in consultation with the division and the stakeholder advisory board created pursuant to
O.C.G.A. § 12-7-20.
B. For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the State general permit, must have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the Georgia State Soil and Water Conservation Commission present on-site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the State general permit.
C. Persons or entities involved in projects not requiring a State general permit but otherwise requiring certified personnel on-site may contract with certified persons to meet the requirements of this section.
D. If a State general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A.
§ 12-7-19(b)(4) and will not be required to meet any educational requirements that exceed those specified in said paragraph.
402-2.9. Appeals
A. Administrative Remedies The suspension, revocation, modification, or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment, and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance; will entitle the person submitting the plan or holding the permit to a hearing before the board of zoning appeals within 30 days after receipt by the local issuing authority of written notice of appeal.
B. Judicial Review Any person, aggrieved by a decision or order of the local issuing authority, after exhausting their administrative remedies, shall have the right to appeal de novo to the Superior Court of Gwinnett County.
402-2.10. Liability
A. Neither the approval of a plan under the provisions of this section, nor the compliance with provisions of this section shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or the Gwinnett Soil and Water Conservation District for damage to any person or property.
B. The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another neither constitutes proof of nor creates a presumption of a violation of the standards provided for in this section or the terms of the permit.
C. No provision of this section permits any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the State as defined thereby.
ARTICLE 3. ENVIRONMENTAL PROTECTION
Sec. 403-1. Stream Buffer Protection 403-1.1. Title This section is known as the "City of Snellville Stream Buffer Protection Ordinance."
403-1.2. Findings and Purposes
A. Findings
1. Whereas, the City Council finds that stream buffers provide numerous benefits including:
a. Protecting, restoring and maintaining the chemical, physical and biological integrity of streams and their water resources.
b. Removing pollutants delivered in urban stormwater.
c. Reducing erosion and controlling sedimentation.
d. Protecting and stabilizing stream banks.
e. Providing for infiltration of stormwater runoff.
f. Maintaining base flow of streams.
g. Contributing organic matter that is a source of food and energy for the aquatic ecosystem.
h. Providing tree canopy to shade streams and promote desirable aquatic habitat.
i. Providing riparian wildlife habitat.
j. Furnishing scenic value and recreational opportunity.
k. Providing opportunities for the protection and restoration of greenspace.
B. Purposes It is the purpose of this section to protect the public health, safety, environment, and general welfare; to minimize public and private losses due to erosion, siltation and water pollution; and to maintain stream water quality by provisions designed to:
1. Create buffer zones along the streams of the city for the protection of water resources; and
2. Minimize land development within such buffers by establishing buffer zone requirements and by requiring authorization for any such activities.
403-1.3. Applicability
A. General This section applies to all land development activities on property containing a stream protection area. These requirements are in addition to, and do not replace or supersede, any other applicable stream buffer requirements established under State law and approval or exemption from these requirements do not constitute approval or exemption from stream buffer requirements established under State law or from other applicable local, State, or federal regulations.
B. Grandfather Provisions This section does not apply to the following activities:
1. Work consisting of the repair or maintenance of any lawful use of land that is zoned and approved for such use on or before the effective date of this UDO.
2. Existing development and on-going land disturbance activities including, but not limited to, existing agriculture, silviculture, landscaping, gardening and lawn maintenance, except that new development or land disturbance activities on such properties are subject to all applicable stream buffer requirements.
3. Any land development activity that is under construction, fully approved for development, scheduled for permit approval or has been submitted for approval as of the effective date of this UDO.
4. Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within 2 years of the effective date of this UDO.
C. Exemptions The following specific activities are exempt from this section. Exemption of these activities does not constitute an exemption for any other activity proposed on a property.
1. Activities for the purpose of building one of the following:
a. A stream crossing by a driveway, transportation route or utility line;
b. Public water supply intake or public wastewater outfall structures;
c. Intrusions necessary to provide access to a property;
d. Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks;
e. Unpaved foot trails and paths;
f. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used;
g. Stormwater outfalls to the stream, by pipe or channel, necessary to protect the buffer from erosion caused by high flow velocities due to steep slopes.
2. Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance should be at least 25 feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in this section.
3. Land development activities within a right-of-way existing at the time this section takes effect or approved under the terms of this section.
4. Within an easement of any utility existing at the time this section takes effect or approved under the terms of this section, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including, but not limited to, manholes, vents, and valve structures.
5. Emergency work necessary to preserve life or property. However, when emergency work is performed under this section, the person performing it must report such work to the Department on the next business day after the commencement of the work. Within 10 days thereafter, the person must apply for a permit and perform such work within such time period as may be determined by the Department to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area.
6. Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the stream buffer that would otherwise be prohibited, then no other land-disturbing activity other than normal forest management practices are allowed on the entire property for 3 years after the end of the activities that intruded on the stream buffer.
7. Exemption of these activities does not constitute an exemption for any other activity proposed on a property.
D. Land Development within Buffer Any land development activity within a stream buffer established hereunder or any impervious cover within a setback established hereunder is prohibited unless a variance is granted pursuant to this section.
403-1.4. Land Development Requirements
A. Stream Buffer and Setback Requirements All land development activity subject to this section must meet the following requirements:
1. An undisturbed natural vegetative stream buffer must be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank.
2. An additional setback must be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative stream buffer, in which all impervious cover is prohibited. Grading, filling and earthmoving must be minimized within the setback.
3. No septic tanks or septic tank drain fields are permitted within the stream buffer or the setback.
B. Relief
1. Relief from the requirements of this section may only be granted as provided for in paragraphs C and D below.
2. Requests for relief from the requirements of this section must be submitted on an application form provided by the Director, along with required fees.
C. Administrative variances Administrative variances from the requirements of this section on single-family residential lots of record platted before May 23, 2005, may be granted if the applicant submits a residential site drainage plan approved by the Director, in accordance with the following:
1. The lot or parcel's shape, topography, or other existing physical condition prevents land development consistent with this section, and the Director finds and determines that the requirements of this section prohibit the otherwise lawful use of the property by the owner.
2. If a variance is requested from the required 50-foot undisturbed natural vegetative stream buffer, the request is for 10% or less (5 feet or less) of the required buffer.
3. If a variance is requested from the required, additional 25-foot impervious surface setback, the request is for 20% or less (5 feet or less) of the required, additional setback, and no impervious cover is proposed within the reduced, additional setback.
4. If an applicant is requesting a variance from both the undisturbed natural vegetative stream buffer and the required, additional 25-foot impervious surface setback, and the requests meet all the criteria listed above, the Director may grant an administrative variance for both requests.
5. Additional water quality treatment practices appropriate for single-family residential lots, such as the incorporation of bio-retention areas, pervious paving that is at least 40% pervious, and sustainable landscaping, may be allowed by approval of the Director.
D. Other variances The Director will coordinate the review of each variance request with all other affected City departments and must forward such comments or recommendations as may be received to the Board of Appeals for action in their normal course of business.
Variances from the requirements of this section, except as provided for in "C" above, may only be granted in accordance with the following:
1. Where a lot was platted before May 23, 2005, and its shape, topography or other existing physical condition prevents land development consistent with this section, and the Director finds and determines that the requirements of this section prohibit the otherwise lawful use of the property by the owner, the Board of Appeals may grant a variance from the buffer and setback requirements hereunder, provided such variance requires mitigation measures to offset the effects of any proposed land development on the lot.
2. Except as provided above, the Board of Appeals may grant no variance from any provision of this section without first conducting a public hearing on the application for a variance and authorizing the granting of the variance by an affirmative vote of the Board of Appeals. The City must give public notice of each such public hearing in a newspaper of general circulation within the city. The City must require that the applicant post a sign giving notice of the proposed variance and the public hearing.
The sign must be of a size and posted in such a location on the property as to be clearly visible from the primary adjacent road right-of-way.
Variances will be considered only in the following cases:
a. When a property's shape, topography or other physical conditions existing at the time of the adoption of this section prevents land development unless a stream buffer variance is granted.
b. Unusual circumstances when strict adherence to the minimal stream buffer requirements in the ordinance would create an extreme hardship.
3. Variances will not be considered when, following the adoption of this section, actions of any property owner of a given property have created conditions of hardship on that property.
At a minimum, a variance request must include the following information:
a. A site map that includes locations of all streams, wetlands, floodplain boundaries, and other natural features, as determined by field survey;
b. A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
c. A detailed site plan that shows the locations of all existing and proposed structures and other impervious covers, the limits of all existing and proposed land disturbance, both inside and outside the stream buffer and setback. The exact area of the stream buffer to be affected must be accurately and clearly indicated;
d. Documentation of unusual hardship should the stream buffer be maintained;
e. At least one alternative plan, which does not include a stream buffer or setback intrusion, or an explanation of why such a site plan is not possible;
f. A calculation of the total area and length of the proposed intrusion;
g. A stormwater management site plan, if applicable; and
h. Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed.
4. The following factors will be considered in determining whether to issue a variance:
a. The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
b. The locations of all streams on the property, including along property boundaries;
c. The location and extent of the proposed stream buffer or setback intrusion;
d. Whether alternative designs are possible which require less intrusion or no intrusion;
e. The long-term and construction water-quality impacts of the proposed variance;
f. Whether issuance of the variance is at least as protective of natural resources and the environment.
403-1.5. Big Haynes Creek Watershed
A. Applicability In addition to the provisions of this section, the following requirements apply. Whichever provisions are more restrictive or impose higher protective standards for human health or the environment will be considered to take precedence.
B. Variances The variance procedures of this section do not apply here. Applicable variances are outlined in paragraph E below.
C. Authority This regulation is adopted pursuant to the Georgia Department of Natural Resources Rules for Environment Planning Criteria.
D. Requirements Within the designated Big Haynes Creek and Watershed Protection Area the following additional stream protection requirements must be met where applicable:
1. Natural buffer zones and setbacks for impervious surfaces are required adjacent to both sides of perennial streams as measured from the stream bank as follows:
Distance to Water Supply Intake or Water Supply Reservoir* Minimum Buffer Minimum Impervious Surface Setback (Big Haynes Creek Watershed) Within 7 Mile Radius 100 feet 150 feet (Big Haynes Creek) Outside 7 Mile Radius 50 feet 75 feet *Radial distances as measured upstream of a governmentally owned public drinking water supply intake or water supply reservoir.
2. Septic tanks and septic tank drain fields are prohibited within the required setback area. Utilities are exempt from the above stream buffer and setback provisions in accordance with the following conditions if the utilities to be located in the stream buffer or setback areas cannot feasibly be located outside these areas: The utilities must be located as far from the stream bank as reasonably possible, except that all easements (permanent and construction) and land disturbance should be at least 25 feet from the top of bank.
a. The installation and maintenance of the utilities must be such as to protect the integrity of the stream buffer and setback areas as best as reasonably possible.
b. Roadways, bridges, and drainage structures may encroach upon required stream buffers and setbacks where such structures are necessary to provide access. Such roadways and bridges must cross streams perpendicularly where reasonably possible. The number of such stream crossings and associated structures must be minimized to the greatest extent possible.
E. Lots of Record All lots or parcels of record as of October 28, 1997, in the Big Haynes Creek Watershed and all lots or parcels which have been submitted by way of preliminary plat and approved by the Department in accord with the provisions of the 1985 Zoning Resolution of Gwinnett County, as of October 28, 1997, within the Big Haynes Creek Watershed, that are made unbuildable by the stream buffer and setback provisions, may still be developed on a case-by-case basis. Requests for development of these lots must be made to the Director as administrative variances. If development is allowed, the maximum possible impervious surface setback and stream buffer width, given the configuration of the lot, must be maintained.
403-1.6. Compatibility with Other Buffers This section is not intended to interfere with, abrogate, or annul any other ordinance, rule or regulation, statute or other provision of law. The requirements of this section should be considered minimum requirements, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment will be considered to take precedence.
403-1.7. Additional Information Required Any permit applications for a property requiring stream buffers and setbacks hereunder must include the following:
A. A site plan showing:
1. The location of all streams on the property;
2. Limits of required stream buffers and setbacks on the property;
3. Stream buffer zone topography with contour lines at no greater than 5-foot contour intervals;
4. Delineation of forested and open areas in the stream buffer zone; and
5. Detailed plans of all proposed land development in the stream buffer and of all proposed impervious cover within the setback;
B. A description of all proposed land development within the stream buffer and setback;
and
C. Any other documentation that the Department may reasonably deem necessary for review of the application and to ensure that the stream buffer zone ordinance is addressed in the approval process.
D. All stream buffer and setback areas must be recorded on the final plat of the property following plan approval.
403-1.8. Responsibility Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this section relieves any person from any responsibility otherwise imposed by law for damage to persons or property; nor will the issuance of any permit hereunder serve to impose any liability upon the City, its officers or employees, for injury or damage to persons or property.
403-1.9. Administration
A. Inspection
1. The Department may cause inspections of the work in the stream buffer or setback to be made periodically during the course thereof and must make a final inspection following completion of the work. The permittee must assist the Department in making such inspections. The City will have the authority to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this section, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area.
2. No person may refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor may any person obstruct, hamper or interfere with any such representative while in the process of carrying out official duties.
B. Violations, Enforcement, and Penalties Any action or inaction which violates the provisions of this section or the requirements of an approved site plan or permit may be subject to the enforcement actions outlined in this section. Any such action or inaction, which is continuous with respect to time, is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
1. Notice of violation. If the Department determines that an applicant or other responsible party has failed to comply with the terms and conditions of a permit, an approved site plan or the provisions of this section, it must issue a written notice of violation to such applicant or another responsible party. Where a person is engaged in an activity covered by this section without having first secured the appropriate permit therefor, the notice of violation shall be served on the owner or the responsible party in charge of the activity being conducted on the site.
The notice of violation must contain:
a. The name and address of the owner or the applicant or the responsible party;
b. The address or other description of the site upon which the violation is occurring;
c. A statement specifying the nature of the violation;
d. A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the approved site plan or this section and the date for the completion of such remedial action;
e. A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed; and
f. A statement that the determination of violation may be appealed to the Board of Appeals by filing a written notice of appeal within 30 days after the notice of violation (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice will be sufficient).
2. Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the Department must first notify the applicant or other responsible party in writing of its intended action and must provide a reasonable opportunity, of not less than 10 days (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice will be sufficient) to cure such violation. In the event the applicant or other responsible party fails to cure such violation after such notice and cure period, the Department may take any one or more of the following actions or impose any one or more of the following penalties.
a. Stop work order. The Department may issue a stop work order which must be served on the applicant or another responsible party. The stop work order must remain in effect until the applicant or other responsible party has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or another responsible party to take necessary remedial measures to cure such violation or violations.
b. Withhold certificate of occupancy. The Department may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible party has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
c. Suspension, revocation or modification of permit. The Department may suspend, revoke or modify the permit authorizing the land development project.
A suspended, revoked or modified permit may be reinstated after the applicant or other responsible party has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated (upon such conditions as the Department may deem necessary) to enable the applicant or another responsible party to take the necessary remedial measures to cure such violations.
d. Civil penalties. In the event the applicant or other responsible party fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within 10 days (or such greater period as the Department may deem appropriate) (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice will be sufficient) after the Department has taken one or more of the actions described above, the Department may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.
e. Criminal penalties. For intentional and flagrant violations of this section, the Department may issue a citation to the applicant or another responsible party, requiring such person to appear in the City municipal court to answer charges for such violation. Upon conviction, such a person will be punished by a fine not to exceed $1,000.00, or imprisonment for 60 days or both. Each act of violation and each day upon which any violation occurs will constitute a separate offense.
Sec. 403-2. Wetlands 403-2.1. Official Wetlands Map The National Wetland Inventory Maps, prepared by the United States Fish and Wildlife Service, is the official wetland maps of the City of Snellville. These maps show the general locations of wetlands and should be consulted by persons contemplating activities in or near wetland areas.
403-2.2. Plans
A. Wetlands Indicated Design professionals, after consulting the National Wetland Inventory Maps, must indicate wetlands on plans required for land disturbance permit applications.
B. Design professional statement Before the issuance of a land disturbance permit, the design professional who prepared the required plans accompanying the permit application, must add a statement to the plan sheet indicating land disturbance and the statement must read as follows:
Wetland Certification:
The design professional, whose seal appears hereon, certifies the following: 1) the National Wetland Inventory Maps have been consulted; and, 2) the appropriate plan sheet % DOES/% DOES NOT (mark appropriate box) indicate areas of United States Army Corps of Engineers jurisdictional wetlands as shown on the maps; and, 3) if wetlands are indicated, the land owner or developer has been advised that land disturbance of protected wetlands shall not occur unless the appropriate federal wetlands alteration (section 404) permit has been obtained.
Sec. 403-3. Illicit Discharge and Illegal Connection 403-3.1. Title This section is known as the "Illicit Discharge and Illegal Connection Ordinance."
403-3.2. Findings and Purpose
A. Findings It is hereby determined that:
1. Discharges to the municipal separate storm sewer system that are not composed entirely of stormwater contribute to increased nonpoint source pollution and degradation of receiving waters;
2. The municipal separate storm sewer system was designed and installed to manage stormwater so as to prevent localized flooding, damage to property and risk to public safety;
3. The municipal separate storm sewer system was not designed or installed as a receiving system for non-stormwater discharges; these non-stormwater discharges occur due to spills, dumping and improper connections to the municipal separate storm sewer system from residential, industrial, commercial or institutional establishments;
4. These non-stormwater discharges not only impact local waterways individually but geographically dispersed, small volume non-stormwater discharges can have cumulative impacts on receiving waters;
5. The impacts of these non-stormwater discharges adversely affect public health and safety, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters;
6. These impacts can be minimized through the regulation of spills, dumping and discharges into the municipal separate storm sewer system;
7. Localities in the State of Georgia are required to comply with a number of State and federal laws, regulations and permits which require a locality to address the impacts of nonpoint source pollution due to improper non-stormwater discharges to the municipal separate storm sewer system;
8. The Clean Water Act requires the management and maintenance of the municipal separate storm sewer system and the management of discharges to that system;
9. Therefore, in order to prohibit such non-stormwater discharges to the municipal separate storm sewer system, it is determined that the regulation of spills, improper dumping, and discharges to the municipal separate storm sewer system is in the public interest and will prevent threats to public health and safety, and the environment.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.