--- title: Springfield Zoning Ordinance, Sec. 118-19. Engineering design review collection: local-codes id: local-code:springfield/zoning/118-19 cite_as: Springfield, Ga., Zoning Ordinance § 118-19 canonical_url: https://georgiacommons.org/code/local/springfield/zoning/118-19 md_url: https://georgiacommons.org/code/local/springfield/zoning/118-19.md text_url: https://georgiacommons.org/code/local/springfield/zoning/118-19/text source_url: https://library.municode.com/ga/springfield date: 2026-11-11 status: active jurisdiction: city:springfield jurisdiction_name: Springfield place_fips: "1372780" corpus_version: local-codes-springfield-1df3d30582e4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/springfield/zoning/~part-ii/~part-b/~chapter-118/~article-iii.md previous: https://georgiacommons.org/code/local/springfield/zoning/118-18.md next: https://georgiacommons.org/code/local/springfield/zoning/118-20.md index: https://georgiacommons.org/code/local/springfield.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:springfield/zoning/118-19@2026-11-11-2b2513c028 --- # Springfield Zoning Ordinance, Sec. 118-19. Engineering design review > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF THE CITY OF SPRINGFIELD, GEORGIA / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 118 - DEVELOPMENT REGULATIONS / Article III - [COMMERCIAL DEVELOPMENT] Approval of site engineering construction plans is required prior to any disturbance on the site. All fees associated with the engineering review must be paid prior to approval being granted. All engineering must be approved prior to issuance of any building permit for vertical construction. Any zoning provisions or request required must be approved prior to the submission of any documentation for engineering review. (1) The following shall be the minimum requirement for the engineering review. Additional information may also be requested and should be provided by the developer. a. Existing pre-development site conditions, including existing features located, existing contour lines, and wetland line (if applicable). b. Demolition plan if existing structures are to be removed. c. Site layout including location of all new building pads, showing setback locations, easements, and rights-of-way, etc. d. A project map indexing the orientation of multiple sheets with match lines shall be included if the plan set requires more than one sheet e. A development phasing plan indicating the contemplated phasing of the proposed development, if applicable. d. Table calculating required parking. Location and dimensions for parking and off-street loading areas, where applicable. e. Utility plan to include all water and sewer lines located on or being extended to the property. Size and location of all lines and connection details should be included. If project is to be served by private well and septic, written approval by the Department of Public Health will be required. f. Paving, grading and drainage plan to include layers, thickness, etc. of all constructed surfaces. g. Hydrology report documenting that there is not an increase in stormwater flow rates and that onsite detention is provided to offset any changes in discharge after construction. Per state law, the water discharge after development cannot be more than before development. Approval from GDOT will be needed to discharge stormwater into a state highway ditch. h. NOI (Notice of Intent) from GA EPD is required for approval of managing construction stormwater when disturbing more than one acre of land. i. Approval from EPA is required when construction disturbs any wetlands located on the property. j. Erosion control plan and technical review letter from EPD approving the erosion and sediment control plan. k. Access points from public roads. Provide a copy of approval from DOT if entrances to the property are proposed from a state highway, or if entrance is within 100 feet of a state highway intersection. (2) For commercial developments that will be subdivided before or after construction begins, the proposed parcel lines should be shown on the site plan. (3) When engineering is approved the city will issue a letter stating that the site work and preparations can begin. This does not give clearance for any structures or buildings to be built on the site. (4) All changes to the approved design must be approved before initiated. (5) The city reserves the right to inspect the property for compliance or have the city engineer inspect the project as necessary. ## History (Ord. No. 2025-06, § 1 (Exh. A), 4-8-2025)