--- title: Springfield Zoning Ordinance, Sec. 118-21. Site prep and construction of infrastructure collection: local-codes id: local-code:springfield/zoning/118-21 cite_as: Springfield, Ga., Zoning Ordinance § 118-21 canonical_url: https://georgiacommons.org/code/local/springfield/zoning/118-21 md_url: https://georgiacommons.org/code/local/springfield/zoning/118-21.md text_url: https://georgiacommons.org/code/local/springfield/zoning/118-21/text source_url: https://library.municode.com/ga/springfield date: 2026-11-11 status: active jurisdiction: city:springfield jurisdiction_name: Springfield place_fips: "1372780" corpus_version: local-codes-springfield-1df3d30582e4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/springfield/zoning/~part-ii/~part-b/~chapter-118/~article-iii.md previous: https://georgiacommons.org/code/local/springfield/zoning/118-20.md next: https://georgiacommons.org/code/local/springfield/zoning/118-22.md index: https://georgiacommons.org/code/local/springfield.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:springfield/zoning/118-21@2026-11-11-4295b0ce3d --- # Springfield Zoning Ordinance, Sec. 118-21. Site prep and construction of infrastructure > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF THE CITY OF SPRINGFIELD, GEORGIA / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 118 - DEVELOPMENT REGULATIONS / Article III - [COMMERCIAL DEVELOPMENT] (a) Approval to begin. Once all approvals have been granted the building and zoning department shall issue approval for site construction to begin. (b) Inspection. Regular inspections of the project should be conducted by the public works department or engineering. Responsibility of calling for site inspections in a timely manner shall be on the developer. (c) Compliance. All aspects of the site construction must follow the approved plans on file with the building and zoning department. Failure to adhere to the approved plans and/or specifications may result in the city issuing a stop work order. A copy of the stop work order shall be emailed to the owner, developer, contractor, and engineer associated with the project. Approval to restart construction shall be issued only by the county. Any construction performed by a contractor while under a stop work order will be considered unacceptable by the building department and will be subject to removal and reconstruction. (d) Water and sewer connections: (1) Meters. Meter fees will be assessed when the application for the building permit is submitted, unless requested sooner. All meter fees will be paid to the City of Springfield and meters will be provided to the project when requested. Any meters over 1.5" must provide a custom constructed meter vault. (2) Tapping of lines. Developers may tap into city water and sewer lines as indicated in the approved site development plans. Before beginning any taps into city infrastructure a minimum of one week's notice shall be give to the utility department. All taps must be inspected by the utility department after completion. Failure to give notice of tap or inspections of tap location shall result in stop work orders being issued. ## History (Ord. No. 2025-06, § 1 (Exh. A), 4-8-2025)