--- title: "Springfield Zoning Ordinance, 6.2.1.1. Plan in duplicate drawn to scale indicating:" collection: local-codes id: local-code:springfield/zoning/6.2.1.1 cite_as: Springfield, Ga., Zoning Ordinance ยง 6.2.1.1 canonical_url: https://georgiacommons.org/code/local/springfield/zoning/6.2.1.1 md_url: https://georgiacommons.org/code/local/springfield/zoning/6.2.1.1.md text_url: https://georgiacommons.org/code/local/springfield/zoning/6.2.1.1/text source_url: https://library.municode.com/ga/springfield date: 2026-11-11 status: active jurisdiction: city:springfield jurisdiction_name: Springfield place_fips: "1372780" corpus_version: local-codes-springfield-1df3d30582e4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/springfield/zoning/~appendix-a/~article-vi.md previous: https://georgiacommons.org/code/local/springfield/zoning/6.2.md next: https://georgiacommons.org/code/local/springfield/zoning/6.3.md index: https://georgiacommons.org/code/local/springfield.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:springfield/zoning/6.2.1.1@2026-11-11-20286cf17c --- # Springfield Zoning Ordinance, 6.2.1.1. Plan in duplicate drawn to scale indicating: > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING ORDINANCE / Article VI - ADMINISTRATION AND ENFORCEMENT i. Actual dimensions and shape of the lot to be built upon. ii. Exact size and location on the lot of all buildings and other structures, if any, and the location and dimensions of proposed buildings and other structures or alterations. iii. Existing and proposed uses, showing the number of families the building is designed to accommodate. 6.2.2 Certificate of Occupancy. A certificate of occupancy shall be required prior to the occupation for use or change of use of land, building or structure. Application for certificate of occupancy shall be made in writing to the Building and Zoning Official. 6.2.2.1 When use of premises involves a new building or structure, or alterations to an existing building or structure, such application shall be made at the same time application for a zoning permit is made. 6.2.2.2 When no construction or alteration is involved, application to occupy and use land may be made at any time. Such application shall contain all information necessary for the Building and Zoning Official to determine whether the proposed occupation and use of land conforms to the provisions of this ordinance. An application for a certificate of occupancy shall be granted or refused within 15 days after the Building and Zoning Official has been officially notified of a) completion of construction, or b) application to occupy and use land where no construction is involved.