Statesboro · Zoning Ordinance
Statesboro Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2025-12-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 4 of 4. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.16. Violations and enforcement.
Any violation of the approved stormwater management plan during construction, failure to submit as-built drawings, failure to submit a final landscaping plan, failure to submit signed and recorded inspection and maintenance agreements, or failure of the final inspection shall constitute and be addressed as violations of, or failures to comply with, the underlying land disturbance permit pursuant to article 4.3 — soil erosion, sedimentation and pollution control. To address a violation of this article, the city has all the powers and remedies that are available to it for other violations of building and land disturbance permits, including without limitation the right to issue notices and orders to ensure compliance, stop work orders, and penalties as set forth in the applicable ordinances for such permits.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.17. Maintenance by owner of stormwater management systems after effective date of this UDC.
For any stormwater management systems approved and built based on requirements predating the adoption of this ordinance and that is not otherwise subject to an inspection and maintenance agreement, such stormwater management systems shall be maintained by the owner so that the stormwater management systems perform as they were originally designed.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.18. Inspection and maintenance agreements.
A. The owner shall execute an inspection and maintenance agreement with the city obligating the owner to inspect, clean, maintain, and repair the stormwater management system; including the final landscaping plan. The form of the inspection and maintenance agreement shall be the form provided by the city. After the inspection and maintenance agreement has been signed by the owner and the city, the owner shall promptly record such agreement at owner's cost in the property record for all parcel(s) that make up the site.
B. The inspection and maintenance agreement shall identify by name or official title the person(s) serving as the point of contact for carrying out the owner's obligations under the inspection and maintenance agreement. The owner shall update the point of contact from time to time as needed and upon request by the city. Upon any sale or transfer of the site, the new owner shall notify the city in writing within 30 days of the name or official title of new person(s) serving as the point of contact for the new owner. Any failure of an owner to keep the point of contact up to date shall, following 30 days' notice, constitute a failure to maintain the stormwater management system.
C. The inspection and maintenance agreement shall run with the land and bind all future successors-in-title of the site. If there is a future sale or transfer of only a portion of the site, then:
(1) The parties to such sale or transfer may enter into and record an assignment agreement designating the owner responsible for each portion of the site and associated obligations under the inspection and maintenance agreement. The parties shall record and provide written notice and a copy of such assignment agreement to the city.
(2) In the absence of a recorded assignment agreement, all owners of the site shall be jointly and severally liable for all obligations under the inspection and maintenance agreement regardless of what portion of the site they own.
D. In the case of single-family residential subdivisions approved after the date of adoption of the ordinance from which this section derives, the city shall assume maintenance responsibility of detention basins, via a maintenance easement and agreement across the parcel containing the facility, two years after the release of subdivision streets. Upon completion of developer maintenance, all detention basins must have a positive slope to the outlet in order to facilitate complete drainage. Detention/retention facilities shall be designed so that they are safe and, where possible, restrict access to the public.
E. Those facilities in single-family residential subdivisions constructed under permits issued before the date of adoption of the ordinance from which this section derives will not be accepted for city maintenance unless such facilities are individually approved by and at the discretion of the city council, and suitable access easements are provided.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.19. Right of entry for maintenance inspections.
The terms of the inspection and maintenance agreement shall provide for the city's right of entry for maintenance inspections and other specified purposes. If a site was developed before the requirement to have an inspection and maintenance agreement or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then the city will have the right to enter and make inspections pursuant to the city's general provisions for property maintenance inspections pursuant to article 4.3 — soil erosion, sedimentation and pollution control.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.20. Owner's failure to maintain the stormwater management system.
A. The terms of the inspection and maintenance agreement shall provide for what constitutes a failure to maintain a stormwater management system and the enforcement options available to City of Statesboro. If a site was developed before the requirement to have an inspection and maintenance agreement or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then:
(1) An owner's failure to maintain the stormwater management system so that it performs as it was originally designed shall constitute and be addressed as a violation of, or failure to comply with, owner's property maintenance obligations pursuant to chapter 38, article II — nuisances; and
(2) Before issuance of a land development permit, the owner shall execute an inspection and maintenance agreement with the city obligating the owner to inspect, clean, maintain, and repair the stormwater management system, including the final landscaping plan. The form of the inspection and maintenance agreement shall be the form provided by the city. After the inspection and maintenance agreement has been signed by the owner and the city, the owner shall promptly record such agreement at owner's cost in the property record for all parcel(s) that make up the site.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.21. Emergency maintenance.
A. The UDC administrator may conduct emergency maintenance operations on private land and on drainage systems where emergency conditions exist.
B. Emergency maintenance conducted on any drainage system shall not be construed as constituting a continuing maintenance obligation on the part of the city.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.22. Notice of violation; stop work order.
A. Whenever the UDC administrator determines that activity on a property does not comply with the approved development and construction plans submitted pursuant to this article, they may issue a notice of violation or a stop work order. Whenever the UDC administrator determines that the drainage system has been unlawfully altered, causing inadequate drainage, they may issue a notice of violation or a stop work order. A stop work order or notice of violation of the provisions of this article or of any rule or regulation adopted pursuant thereto shall be to the owner of the property or their agent and shall:
(1) Be in writing;
(2) Include a description of the property sufficient for identification of the location where the violation has occurred;
(3) List the specific provisions of this article which have been violated; and
(4) State that, if the repairs, construction, or alterations are not completed within a reasonable time period specified by the UDC administrator, summons shall be issued for the owner to appear in municipal court.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.23. Appeals.
An appeals board consisting of the UDC administrator and a designated representative of the Home Builder's Association shall hear and decide appeals from administrative and enforcement actions taken pursuant to this article within 15 days of the filing of the appeal.
Any person seeking a variance from the development standards of this article shall first file a request with the appeals board, which shall make a recommendation to the mayor and city council. Any person aggrieved by a decision of the appeals board will have the right to appeal to the mayor and city council in accordance with the jurisdictional and procedural requirements of article 2.7 — administration and procedures, however, the mayor and city council shall refer to the variance procedures outlined in the regulations of article 4.4 — flood damage prevention ordinance. Any determination made by the appeals board or UDC administrator pursuant to this article, including suspension, revocation or modification of permit is appealable to the mayor and city council. A hearing at which the permit holder shall be allowed to present evidence on their behalf on the matter shall be scheduled no later than 30 days after the receipt of written notice by the city.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.2.24. Design standards for drainage facilities within subdivisions.
A. Lot.
(1) Minimum lot slope grades shall be three-tenths percent.
(2) Side lot drainage shall be piped. Ditches on side lot lines are not permitted.
B. Pipe.
(1) Only reinforced concrete pipe (RCP) Class III shall be used in city road rights-of-way or city-maintained drainage easements.
(2) Driveway pipes shall be a minimum of 15 inches in diameter.
(3) Pipes up to 36 inches in diameter must have a flared end section; pipes larger than 36 inches in diameter must have winged head walls or other prior approved end treatments.
(4) Pipes of dissimilar size shall be vertically aligned with their energy grade line or must have the crowns of the pipes set at matching elevations when similar size pipes converge at a manhole or other structure.
(5) All pipe joints, in addition to the required rubber gaskets, shall be covered with approved geotextile material of sufficient width to be secured to the pipe and completely encircle the joint with a 50 percent overlap. An alternative to this proposal may be the placement of grout around each pipe joint.
(6) Pipes located on property lines must have a minimum depth of cover to the finish grade of 36 inches. Where such depth of cover cannot be maintained, the pipe shall be relocated in such a manner that the property owner will not be impaired in the construction of fences and other amenities normally located at such locations and a sufficient easement provided for the relocated position of the pipe.
(7) Pipe gradients shall provide self-cleaning velocities without scour (2—9 fps).
(8) The city requires the installation of reinforced concrete storm drain pipes and Georgia DOT standard drop inlets when curb and gutter is used in new subdivision roads. The spacing between drop inlets shall not exceed 300 feet. Maximum length of pipe runs shall not exceed 300 feet. All drainage pipes shall begin and end in either inlets, manholes, or end treatments.
(9) Only reinforced concrete pipe will be approved for drainage systems which the city will be required to maintain.
C. Curb and ditch inlets. All inlets shall be of the standard design. Curb inlets should be located at the end of corner curve radius. A drop inlet that consists of a grate on the gutter and a hood on the curb (GA DOT Standard Drop Inlet No. 1019) shall be used in the presence of a sidewalk along the road. No manhole or box cover shall be used in the sidewalk.
D. Drainage swales.
(1) Swales with a velocity greater than five feet per second shall be paved a minimum of two feet wide and six inches deep.
(2) Swales must have a 5:1 side slopes or flatter; however, if a swale traverses a wooded site, use of a 3:1 side slope may be submitted for approval by the UDC administrator to reduce impact on trees.
(3) Before use, drainage swales must have sufficient vegetation to provide filtration and erosion stabilization.
(4) Drainage pipes or gutter flow shall not discharge into a swale.
E. Maintenance. All ditch banks shall be constructed in a manner that the side slopes will not erode and can be maintained with riding grass cutting equipment. The type of soil encountered will be considered in selecting the proper slope. Side slopes flatter than 3:1 may be required if soil conditions warrant.
F. Drainage design standards, methodology and criteria. All drainage design and analysis shall be based on the city's stormwater management ordinance.
(1) Hydrologic methodology. For computing surface runoff to size site conveyance systems, the "The Rational Method" is adopted. For detention design and culvert crossings the U.S. Department of Agriculture, Soil Conservation Service (SCS), Technical Release No. 55 FR-55, entitled "Urban Hydrology for Small Watersheds" is adopted.
(2) Drainage design storm criteria. The following design criteria shall be used for either methodology utilized for computation:
(i) For arterial roads and above, culverts crossing beneath public roadways must be designed to pass the 100-year, 24-hour frequency storm.
(ii) For collector roads and local roads, culverts crossing beneath public roadways must be designed to pass at least the 25-year frequency, 24-hour storm.
(iii) For other storm water piping, except that associated with a detention pond outlet, shall be designed to pass the 25-year frequency storm. The city recommends the oversizing of stormwater piping.
(3) General requirements.
(i) Refer to article 4.2 — stormwater management for stormwater management guidance.
(ii) An overall map of the drainage area with basin area, length, and slope information keyed to the drainage calculations.
(iii) The calculations shall clearly show how the time of concentrations was determined.
(iv) Pipe sizing calculations shall be checked for inlet and outlet control. Maximum headwater and tail-water conditions should be provided.
(v) Flood plain elevations and zones for the FEMA 100-year storm shall be shown on the construction plans.
(vi) Where FEMA flood elevation have not been determined, the applicant's engineer shall provide such elevations based on the criteria outlined in the flood damage prevention ordinance and set finish floor elevations consistent with the flood damage prevention ordinance requirements.
(vii) Maximum basin side slopes shall be 3:1, except where soil conditions require flatter slopes.
(viii) Wet detention basins must have a permanent pool depth of not less than four feet to reduce bottom vegetation growth.
(ix) Dry detention basin shall be secured by a permanent fence with access gates sufficient in size for maintenance equipment to pass. Dry basins must be designed with access to allow for efficient maintenance of the basin bottom and side slopes. The entity responsible for maintaining any detention basin shall be clearly identified on the preliminary and final plats.
(x) Major drainage canals shall not be used for storage.
(xi) Use of rectangular weir outlets will be allowed only where the weir will provide better outlet control needed for a given situation than that provided by a V-notched weir. V-shaped of V-notched weir outlets are recommended to achieve detention storage. Use of innovative outlet structures such as pipe-culvert combinations, perforated riser pipes, or specially graduated opening outlet control boxes, are encouraged as ways of reproducing pre-development runoff conditions. Whichever restrictive outlet devise is chosen, it should be designed to reduce clogging. Round orifices smaller than 18 inches in diameter are prohibited.
(xii) Design data for storage volume and detention outlet requirements shall be submitted and approved by the UDC administrator.
(xiii) The principal outlet must convey the design peak flow without emergency overflow.
(xiv) Use of concrete weirs or standpipe are preferred over undersize pipes.
(xv) Where cleared site conditions exist around detention or retention areas, the banks shall be sloped to proposed dry weather water surface elevation and planted for stabilization purposes. Where slopes are not practical or desired, other methods of bank stabilization will be used and noted on plans submitted.
(xvi) Dredging, clearing, deepening, widening, straightening, stabilizing or otherwise altering natural water bodies or canals may be permitted by the UDC administrator only when a positive benefit can be demonstrated. Such approval by the city does not obviate the need for state or federal agency approval where applicable.
(4) Direct storm water discharge.
(i) Discharges to natural water bodies. Where a specific site requires a permit to allow direct discharge into a natural water body, methods of diffusing and filtering the discharge and of reducing velocity may be required.
(ii) Final landscape design and planting shall not work against the storm water runoff controls and drainage concepts approved as part of the construction plan approval process.
(iii) Rip rap. Sufficient rip rap shall be provided anywhere that soil scouring will occur because of excessive runoff velocities. Other energy dissipation will be considered.
(5) Drainage easements. All drainage easements offered to the city for dedication to public use must have a minimum width of 25 feet or as shown in Table 4.2.24-A — Required Easements for Open Channels. For underground storm drain pipes, the minimum width of the easement shall not be less than 20 feet or as shown in Figure 3.2.5-P — Easements for Storm Pipes. The applicant shall submit to the UDC administrator a request for permanent dedication of drainage systems for city maintenance. The UDC administrator shall certify that all as-built improvements so offered are in conformance with approved plans and with all prevailing city standards.
(6) Open channel. Open channel easements shall be sized in Table 4.2.24-A — Required Easements for Open Channels. The open channel shall be located in the easement to provide an adequate maintenance area on each side of the open channel. All storm drainage rights-of-way shall be reviewed by the UDC administrator and upon approval will be recorded.
Table 4.2.24-A — Required Easements for Open Channels Maximum top width of open channel in feet Required minimum drainage R/W in feet 5—10 30 9—15 35 Maximum top width of open channel in feet Required minimum drainage R/W in feet 16—20 40 21—25 45 Greater than 25 As approved by UDC administrator
(7) Erosion and sediment control. Erosion and sedimentation controls shall be required on all sites. See article 4.3 — soil erosion, sedimentation and pollution control.
(8) Lakes, ponds, and waterways.
(i) Artificial or natural waterways, lakes, or ponds for recreation shall not be accepted for maintenance by the city.
(ii) Waterways, lakes, ponds, detention, or retention basins shall be maintained by either an established homeowner's association or individual property owner(s).
In either case, the final plat must indicate who will be responsible for maintenance. The city will not accept maintenance of commercial detention or retention basins.
(iii) Private maintenance provisions must be made to the satisfaction of the UDC administrator. Placing responsibility on the owner(s) of the property where the feature is located is allowed, if suitable notes and easements are provided on the final plat and other legal instruments.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23)
ARTICLE 4.3. SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL
Sec. 4.3.1. Title.
This article will be known as "City of Statesboro Soil Erosion, Sedimentation and Pollution Control Ordinance."
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.2. Definitions.
The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:
Best management practices (BMP's). These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the 'Manual for Erosion and Sediment Control in Georgia' published by the commission as of January 1 of the year in which the land-disturbing activity was permitted.
Board means the board of natural resources.
Buffer means the area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel means a person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission means the Georgia Soil and Water Conservation Commission (GSWCC).
CPESC means certified professional in erosion and sediment control with current certification by certified professional in Erosion and Sediment Control, Inc., a corporation registered in North Carolina, which is also referred to as CPESC or CPESC, Inc.
Cut means a portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to excavated surface. Also known as excavation.
Department means the Georgia Department of Natural Resources (DNR).
Design professional means a professional licensed by the State of Georgia in the field of:
engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by certified professional in Erosion and Sediment Control, Inc.
Director means the director of the environmental protection division or an authorized representative.
District means the Ogeechee River Soil and Water Conservation District.
Division means the Environmental Protection Division (EPD) of the department of natural resources.
Drainage structure means a device composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.
Erosion means the process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, sedimentation and pollution control plan means a plan required by the Erosion and Sedimentation Act, O.C.G.A. tit. 12 ch. 7, that includes, as a minimum protection at least as stringent as the state general permit, best management practices, and requirements in section 4.3.4.C.
Fill means a portion of land surface to which soil or other solid material has been added;
the depth above the original ground surface or an excavation.
Final stabilization means all soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or equivalent permanent stabilization measures (such as the use of rip rap, gabions, permanent mulches or geotextiles) have been used. Permanent vegetation shall consist of: planted trees, shrubs, perennial vines; a crop of perennial vegetation appropriate for the time of year and region; or a crop of annual vegetation and a seeding of target crop perennials appropriate for the region. Final stabilization applies to each phase of construction.
Finished grade means the final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading means altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
Ground elevation means the original elevation of the ground surface before cutting or filling.
Land-disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in subsection 4.3.3.A.(5).
Larger common plan of development or sale means a contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, "plan" means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority means the governing authority of any county or municipality which is certified pursuant to O.C.G.A. § 12-7-8(a).
Metropolitan River Protection Act (MRPA) means a state law referenced as O.C.G.A.
§ 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.
Natural ground surface means the ground surface in its original state before any grading, excavation or filling.
Nephelometric turbidity units (NTU) means numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
NOI means a notice of intent form provided by EPD for coverage under the state general permit.
NOT means a notice of termination form provided by EPD to terminate coverage under the state general permit.
Operator means the party or parties that have: (A) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or (B) day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall means the location where stormwater in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.
Permit means the authorization necessary to conduct a land-disturbing activity under the provisions of this article.
Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
Phase or phased means sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized before completing construction activities on the entire construction site.
Project means the entire proposed development project regardless of the size of the area of land to be disturbed.
Properly designed means designed in accordance with the design requirements and specifications contained in the "Manual for Erosion and Sediment Control in Georgia" (manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of NOI submittal.
Roadway drainage structure means a device such as a bridge, culvert, or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment means solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation means the process by which eroded material is transported and deposited by the action of water, wind, ice, or gravity.
Soil and water conservation district approved plan means an erosion, sedimentation and pollution control plan approved in writing by the Ogeechee River Soil and Water Conservation District.
Stabilization means the process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
State general permit means the national pollution discharge elimination system (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. section 1251, et seq., and O.C.G.A. § 12-5-30(f).
State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices means practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication Manual for Erosion and Sediment Control in Georgia.
Trout streams means all streams or portions of streams within the watershed as designated by the wildlife resources division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A.
§ 12-5-20, in the rules and regulations for Water Quality Control, chapter 391-3-6 at www.gaepd.org. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.
UDC administrator. The city official authorized by the city manager to administer the portions of this UDC that do not constitute a zoning ordinance within the meaning of O.C.G.A. § 36-66-1 et seq., or their designee.
Vegetative erosion and sedimentation control measures means measures for the stabilization of erodible or sediment-producing areas by covering the soil with:
(1) Permanent seeding, sprigging, or planting, producing long-term vegetative cover; or
(2) Temporary seeding, producing short-term vegetative cover; or
(3) Sodding, covering areas with a turf of perennial sod-forming grass. Such measures can be found in the publication Manual for Erosion and Sediment Control in Georgia.
Watercourse means any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Wetlands means those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions.
Wetlands generally include swamps, marshes, bogs, and similar areas.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.3. Exemptions.
A. This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
(1) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, "The Georgia Surface Mining Act of 1968";
(2) Granite quarrying and land clearing for such quarrying;
(3) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
(4) The construction of one-household dwellings, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A.
§ 12-7-6 and this paragraph. For one-household dwelling construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to article 2 of chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-7- 6(b) and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;
(5) Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions," to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;
(6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in subsection 4.3.4.C.(15) and subsection 4.3.4.C.(16), no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
(7) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;
(8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs (1), (2), (3), (4), (5), (6), (7), (9) or (10) of this section;
(9) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of transportation, the Georgia Highway Authority, or the state road and tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or the state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the department of transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
(10) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
(11) Any public water system reservoir.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.4. Minimum requirements for erosion sedimentation and pollution control using best management practices.
A. General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES General Permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of subsection 4.3.4.B. and subsection 4.3.4.C. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this article and the NPDES General Permit.
B. Minimum requirements/BMPs.
(1) Best management practices as set forth in subsection 4.3.4.B. and subsection 4.3.4.C.
shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act." As used in this subsection the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b).
(2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to subsection O.C.G.A.
§ 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters.
The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of one-household dwellings which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
(3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.
§ 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such failure occurs.
(4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.
(5) The LIA may set more stringent buffer requirements than stated in subsection 4.3.4.C.(15) and subsection 4.3.4.C.(16), in light of O.C.G.A. § 12-7-6(c).
C. The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.
§ 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
(1) Stripping of vegetation, regarding and other development activities shall be conducted in a manner so as to minimize erosion;
(2) Cut-fill operations must be kept to a minimum;
(3) Development plans must conform to topography and soil type so as to create the lowest practical erosion potential;
(4) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(6) Disturbed soil shall be stabilized as quickly as practicable;
(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(9) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A.
§ 12-7-1 et seq.;
(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(11) Cuts and fills may not endanger adjoining property;
(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
(14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in subsection 4.3.4.B.(2);
(15) Except as provided in paragraph (16) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the groundwater table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of article 5, chapter 5 of title 12, the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer:
(i) No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a one-household dwelling, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
(ii) The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines;
(16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to article 2 of chapter 5 of title 12, the "Georgia Water Quality Control Act," except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:
(i) No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a one-household dwelling, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
(ii) The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines.
D. Nothing contained in O.C.G.A. § 12-7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in subsection 4.3.4.B.
and subsection 4.3.4.C.
E. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.5. Application/permit process.
A. General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
B. Application requirements.
(1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the city without first obtaining a permit from the public works and engineering department to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.
(2) The application for a permit shall be submitted to the UDC administrator and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in subsection 4.3.5.C. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the landdisturbing activity proposed will be carried out in such a manner that the provisions of subsection 4.3.4.B. and subsection 4.3.4.C. will be met. Applications for a permit will not be accepted unless accompanied by four copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site before creation of the plan in accordance with EPD Rule 391-3-7-.10.
(3) In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A. § 12-5-23(5)(a), provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid before issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a) half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. §§ 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
(4) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of a district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by subsection 4.3.4.C.(15) and subsection 4.3.4.C.(16) has been obtained, all fees have been paid, and bonding, if required as per subsection 4.3.5.B.(6), have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.
(5) If a permit applicant has an existing uncorrected violation(s), or has had two or more violations of previous permits under this article or the Erosion and Sedimentation Act, as amended, within three years before the date of filing the application under consideration, the local issuing authority may deny the permit application.
(6) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, before issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
C. Plan requirements.
(1) Plans must be prepared to meet the minimum requirements as contained in subsection 4.3.4.B. and subsection 4.3.4.C., or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity must meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A.
§ 12-7-20.
(2) Data required for site plan shall include all the information required from the appropriate Erosion, Sedimentation and Pollution Control Plan Review Checklist established by the commission as of January 1 of the year in which the landdisturbing activity was permitted.
D. Permits.
(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid before permit issuance. The permit shall include conditions under which the activity may be undertaken.
(2) No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by subsection 4.3.4.C.(15) and subsection 4.3.4.C.(16) are obtained, bonding requirements, if necessary, as per subsection 4.3.5.B.(6) are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.
(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or their successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or their successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
(6) The LIA may reject a permit application if the applicant has an existing uncorrected violation(s), or has had two or more violations of previous permits, this article, or the Erosion and Sedimentation Act permit requirements within three years before the date of the application, or in light of O.C.G.A. § 12-7-7(f)(1).
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.6. Inspection and enforcement.
A. The UDC administrator will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate both primary, secondary and tertiary permittees as such terms are defined in the state general permit.
Primary permittees shall be responsible for installation and maintenance of best manage-ment practices where the primary permittee is conducting land-disturbing activities.
Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.
B. The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
C. The UDC administrator has the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
D. No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out their official duties.
E. The districts or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). The districts or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
F. The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified will have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division may revoke the certification of the county or municipality as a local issuing authority.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.7. Penalties and incentives.
A. Failure to obtain a permit for land-disturbing activity. If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this ordinance without first obtaining said permit, the person shall be subject to revocation of their business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
B. Stop-work orders.
(1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator will have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning;
(2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and
(3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or their designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or their designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
C. Bond forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited their performance bond, if required to post one under the provisions of subsection 4.3.5.B.(6). The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
D. Monetary penalties.
(1) Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.8. Education and certification.
A. Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity must meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
B. For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, must have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
C. Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.
D. If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee must meet those educational requirements specified in O.C.G.A.
§ 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.9. Administrative appeal and judicial review.
A. Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance;
shall entitle the person submitting the plan or holding the permit to a hearing before the mayor and city council within 15 days after receipt by the local issuing authority of written notice of appeal.
B. Judicial review. Any person, aggrieved by a decision or order of the local issuing authority, after exhausting their administrative remedies, will have the right to appeal denovo to the Superior Court of Bulloch County.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.3.10. Effectivity, validity, and liability.
A. Effectivity. This article became effective on the 7th day of July, 2010.
B. Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article.
C. Liability.
(1) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property.
(2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(3) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23)
ARTICLE 4.4. FLOOD DAMAGE PREVENTION ORDINANCE
Sec. 4.4.1. Statutory authorization, findings of fact, purpose, and objectives.
A. Authorization. Article IX, section II of the Constitution of the State of Georgia and O.C.G.A. § 36-1-20(a) have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry.
Therefore, the City of Statesboro, Georgia, does ordain as follows.
B. Findings of fact.
(1) The flood hazard areas of Statesboro, Georgia are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety, and general welfare.
(2) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, flood-proofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.
C. Statement of purpose. It is the purpose of this chapter to promote the public health, safety, and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
(1) Require that uses vulnerable to floods, including facilities, which serve such uses, be protected against flood damage at the time of initial construction;
(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;
(3) Control filling, grading, dredging and other development which may increase flood damage or erosion, and;
(4) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands;
(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.
D. Objectives. The objectives of this chapter are:
(1) To protect human life and health;
(2) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;
(3) To help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize flood blight areas,
(4) To minimize expenditure of public money for costly flood control projects;
(5) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(6) To minimize prolonged business interruptions; and,
(7) To ensure that potential homebuyers are notified that property is in a flood area.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.4.2. General provisions.
A. Lands to which this chapter applies. This chapter shall apply to all areas of special flood hazard within the jurisdiction of Statesboro, Georgia.
B. Basis for area of special flood hazard.
(1) The areas of special flood hazard identified by the Federal Emergency Management Agency in its flood insurance study (FIS), dated August 5, 2010, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this chapter.
(2) For those land areas acquired by a municipality through annexation, the current effective FIS dated August 5, 2010, with accompanying maps and other supporting data and any revision thereto, for Bulloch County are hereby adopted by reference.
(3) The repository for public inspection of the flood insurance study (FIS), accompanying maps and other supporting data is located at the public works and engineering department.
C. Establishment of development permit. A development permit shall be required in conformance with the provisions of this chapter before the start of any development activities.
D. Compliance. No structure or land shall hereafter be located, extended, converted, or altered without full compliance with the terms of this chapter and other applicable regulations.
E. Abrogation and greater restrictions. This chapter is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
F. Interpretation. In the interpretation and application of this chapter all provisions shall be:
(1) Considered as minimum requirements;
(2) Liberally construed in favor of the governing body, and;
(3) Deemed neither to limit nor repeal any other powers granted under state statutes.
G. Warning and disclaimer of liability. The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by manmade or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of City of Statesboro or by any officer or employee thereof for any flood damages that result from reliance on this chapter, or any administrative decision lawfully made hereunder.
H. Penalties for violation. No structure shall hereafter be constructed, located, extended, converted, or altered, or substantial improvement undertaken, without full compliance with the terms and provisions of this chapter and other applicable regulations. Violation of the provisions of this chapter by failure to comply with any of its requirements, including violations of conditions and safeguards established in connection with such conditions, shall constitute a misdemeanor. Any person who violates this chapter, or fails to comply with any of its requirements, shall, upon conviction thereof, be punished as provided in section 1-12 of the Code of Ordinances of the City of Statesboro, Georgia, and in addition shall pay all costs and expenses involved in the case. Each day such violation continues shall constitute a separate offense. Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy any violation.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.4.3. Administration.
A. Designation of chapter administrator. The UDC administrator is hereby appointed to administer and implement the provisions of this chapter.
B. Permit procedures. Application for a development permit shall be made to the UDC administrator on forms furnished by the community before any development activities, and may include, but not be limited to the following: Plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required:
(1) Application stage.
(i) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
(ii) Elevation in relation to mean sea level to which any nonresidential structure will be flood-proofed;
(iii) Design certification from a registered professional engineer or architect that any proposed nonresidential flood-proofed structure will meet the floodproofing criteria of subsection 4.4.4.B.(2), said certification shall be provided via the current version of FEMA's Elevation Certificate or Dry Flood Proofing Forms, as applicable; and
(iv) Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development.
(2) Construction stage.
(i) For all new construction and substantial improvements, the permit holder shall provide to the UDC administrator an as-built certification of the regulatory floor elevation or flood-proofing level immediately after the lowest floor or flood-proofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.
(ii) Any work undertaken before submission of these certifications shall be at the permit holder's risk.
(iii) The UDC administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and before further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.
C. Duties and responsibilities of the UDC administrator. Duties of the UDC administrator shall include, but shall not be limited to:
(1) Review proposed development to assure that the permit requirements of this article have been satisfied.
(2) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.
(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(4) When base flood elevation data or floodway data have not been provided in accordance with subsection 4.4.2.B., then the UDC administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state, or other sources in order to administer the provisions of section
4.4.4 — provisions for flood hazard reduction.
(5) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with subsection 4.4.3.B.(2).
(6) Review and record the actual elevation, in relation to mean sea level to which any new or substantially improved structures have been flood-proofed, in accordance with subsection 4.4.3.B.(2).
(7) When flood-proofing is utilized for a structure, the UDC administrator shall obtain certification of design criteria from a registered professional engineer or architect in accordance with subsection 4.4.3.B.(1)(iii) and subsection 4.4.4.B.(2) or subsection 4.4.4.D.(2).
(8) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.
(9) Notify adjacent communities and the Georgia Department of Natural Resources before any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
(10) For any altered or relocated watercourse, submit engineering data/analysis within six months to the FEMA to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained.
(11) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the UDC administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this chapter.
(12) All records pertaining to the provisions of this chapter shall be maintained in the office of the UDC administrator and shall be open for public inspection.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.4.4. Provisions for flood hazard reduction.
A. General standards. In all areas of special flood hazard the following provisions are required:
(1) No development shall be allowed within the floodplain that could result in any of the following:
(i) Reducing the base flood storage capacity;
(ii) Changing the flow characteristics as to the depth and velocity of the waters of the base flood as they pass both the upstream and downstream boundaries of the development area; or,
(iii) Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation.
(2) Compensatory storage. Compensation for storage capacity shall occur between the average ground water table elevation and the base flood elevation for the base flood, and lie within the boundaries of ownership of the property being developed and shall be within the immediate vicinity of the location of the encroachment. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided by excavating below the elevation of the stream channel. Compensatory grading plan shall be submitted to UDC administrator for review.
(3) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;
(4) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;
(5) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;
(6) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
(i) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
(a) Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
(b) The bottom of all openings shall be no higher than one foot above grade;
and,
(c) Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions.
(ii) So as not to violate the "lowest floor" criteria of this chapter, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area, and
(iii) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
(7) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(8) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces.
(9) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;
(10) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;
(11) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding, and;
(12) Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this chapter, shall be undertaken only if the nonconformity is not furthered, extended or replaced.
B. Specific standards. In all areas of special flood hazard the following provisions are required:
(1) New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home must have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation.
(i) Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of subsection 4.4.4.A.(6).
(ii) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.
(2) Nonresidential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to one foot above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in subsection 4.4.3.C.(6).
(3) Standards for manufactured homes and recreational vehicles. Where base flood elevation data are available:
(i) All manufactured homes placed and/or substantially improved on: (i) individual lots or parcels, (ii) in new and/or substantially improved manufactured home parks or subdivisions, (iii) in expansions to existing manufactured home parks or subdivisions, or (iv) on a site in an existing manufactured home park or subdivision where a manufactured home has incurred "substantial damage" as the result of a flood, must have the lowest floor including basement, elevated no lower than one foot above the base flood elevation.
(ii) Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either:
(a) The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation, or
(b) The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
(iii) All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. (Reference subsection 4.4.4.A.(8).)
(iv) All recreational vehicles placed on sites must either:
(a) Be on the site for fewer than 180 consecutive days.
(b) Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions), or
(c) The recreational vehicle must meet all the requirements for "new construction," including the anchoring and elevation requirements of subsection 4.4.4.B.(3)(i) and subsection 4.4.4.B.(3)(iii).
(4) Floodway. Located within areas of special flood hazard established in subsection 4.4.2.B., are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
(i) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
(ii) Only if subsection 4.4.4.B.(4)(i) is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of section 4.4.4 — provisions for flood hazard reduction.
C. Building standards for streams without established base flood elevations and/or floodway (A-Zones). Located within the areas of special flood hazard established in subsection 4.4.2.B., where streams exist but no base flood data have been provided (A-Zones), or where base flood data have been provided but a floodway has not been delineated, the following provisions apply:
(1) When base flood elevation data or floodway data have not been provided in accordance with subsection 4.4.2.B., then the UDC administrator shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of section 4.4.4 — provisions for flood hazard reduction. Only if data are not available from these sources, then the following provisions (2) and (3) shall apply:
(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 20 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in more than a one-foot increase in flood levels during the occurrence of the base flood discharge.
(3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures must have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (NOTE: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-Zone areas where a limited detail study has been completed.) Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 4.4.4.A.(6).
(i) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.
(ii) The UDC administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
D. Standards for areas of special flood hazard (Zones AE) with established base flood elevations without designated floodways. Located within the areas of special flood hazard established in subsection 4.4.2.B., where streams with base flood elevations are provided but no floodways have been designated, (Zones AE) the following provisions apply:
(1) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles.
(2) New construction or substantial improvements of buildings shall be elevated or flood-proofed to elevations established in accordance with subsection 4.4.4.B.
E. Standards for areas of shallow flooding (AO Zones). Areas of special flood hazard established in subsection 4.4.2.B., may include designated "AO" shallow flooding areas.
These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:
(1) All new construction and substantial improvements of residential and nonresidential structures must have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade.
Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of subsection 4.4.4.A.(6). The UDC administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(2) New construction or the substantial improvement of a nonresidential structure may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one foot, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and as required in subsection 4.4.3.B.(1)(iii) and subsection 4.4.3.B.(2).
(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
F. Standards for subdivisions.
(1) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage;
(2) All subdivision and/or development proposals must have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage;
(3) All subdivision and/or development proposals must have adequate drainage provided to reduce exposure to flood hazards, and;
(4) For subdivisions and/or developments greater than 50 lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the "as-built" data to FEMA in order to obtain the final LOMR.
G. Standards for critical facilities.
(1) Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain.
(2) All ingress and egress from any critical facility must be protected to the 500-year flood elevation.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.4.5. Variance procedures.
A. Variance procedures.
(1) The mayor and city council (appeals board) shall hear and decide requests for appeals or variance from the requirements of this article.
(2) The appeals board shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the UDC administrator in the enforcement or administration of this article.
(3) Any person aggrieved by the decision of the appeals board may appeal such decision to the Superior Court of Bulloch County as provided in O.C.G.A. § 5-4-1.
(4) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.
(5) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
(6) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(7) In reviewing such requests, the appeals board shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this chapter.
(8) Conditions for variances:
(i) A variance shall be issued only when there is:
(a) A finding of good and sufficient cause,
(b) A determination that failure to grant the variance would result in exceptional hardship, and;
(c) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
(ii) The provisions of this chapter are minimum standards for flood loss reduction;
therefore any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of a historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.
(iii) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.
(iv) The UDC administrator shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request.
(9) Upon consideration of the factors listed above and the purposes of this article, the appeals board may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 4.4.6. Definitions.
Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application:
Accessory structure means a structure having minimal value and used for parking, storage and other non habitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and the like.
Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall. Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered "new construction."
Appeal means a request for a review of the UDC administrator's interpretation of any provision of this chapter.
Area of shallow flooding means a designated AO or AH Zone on a community's flood insurance rate map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
Area of special flood hazard is the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. In the absence of official designation by the Federal Emergency Management Agency, areas of special flood hazard shall be those designated by the local community and referenced in subsection 4.4.2.B.
Base flood means the flood having a one percent chance of being equaled or exceeded in any given year.
Base flood elevation (BFE) means the elevation shown on the flood insurance rate map for Zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one percent chance of equaling or exceeding that level in any given year.
Basement means that portion of a building having its floor sub grade (below ground level) on all sides.
Building means any structure built for support, shelter, or enclosure for any occupancy or storage.
Critical facility means any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include:
(1) Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials;
(2) Hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events;
(3) Emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and
(4) Generating plants, and other principal points of utility lines.
Development means any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.
Elevated building means a nonbasement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.
Existing construction means for the purposes of determining rates, structures for which the "start of construction" began before May 15, 1980.
Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before May 15, 1980.
Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:
(1) The overflow of inland or tidal waters; or
(2) The unusual and rapid accumulation or runoff of surface waters from any source.
Flood hazard boundary map (FHBM) means an official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as Zone A.
Flood insurance rate map (FIRM) means an official map of a community, issued by the Federal Insurance Administration, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
Flood insurance study means the official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.
Floodplain means any land area susceptible to flooding.
Flood-proofing means any combination of structural and nonstructural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Freeboard means a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. Freeboard tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
Highest adjacent grade means the highest natural elevation of the ground surface, before construction, adjacent to the proposed foundation of a building.
Historic structure means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the secretary to qualify as a registered historic district;
(3) Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or
(4) Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either:
(i) By an approved state program as determined by the Secretary of the Interior, or (ii) Directly by the Secretary of the Interior in states without approved programs.
Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this Code.
Manufactured home means a building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
Mean sea level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's flood insurance rate map are referenced.
National Geodetic Vertical Datum (NGVD) as corrected in 1929 is a vertical control used as a reference for establishing varying elevations within the floodplain.
New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" began after May 15, 1980, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" began after May 15, 1980, and includes any subsequent improvements to such structures.
New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed after May 15, 1980.
North American Vertical Datum (NAVD) has replaced the National Geodetic Vertical Datum of 1929 in existing and future FEMA flood modernization maps.
Recreational vehicle means a vehicle, which is:
(1) Built on a single chassis;
(2) Four hundred square feet or less when measured at the largest horizontal projection;
(3) Designed to be self-propelled or permanently towable by a light duty truck; and
(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: Accessory structures are NOT exempt from any ordinance requirements.) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure means a walled and roofed building that is principally above ground, a manufactured home, a gas, or liquid storage tank.
Subdivision means the division of a single lot into two or more lots for the purpose of sale or development.
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a five-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement.
(1) NOTE: The market value of the structure should be (1) the appraised value of the structure before the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure before the damage occurs. This term includes structures, which have incurred "substantial damage," regardless of the actual amount of repair work performed.
(2) For the purposes of this definition, substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. The term does not, however, include (1) those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the UDC administrator, and not solely triggered by an improvement or repair project, or (2) any alteration of a "historic structure" provided that the alteration will not preclude the structure's continued designation as a "historic structure."
Substantially improved existing manufactured home parks or subdivisions is where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement began.
UDC administrator. The city official authorized by the city manager to administer the portions of this UDC that do not constitute a zoning ordinance within the meaning of O.C.G.A. § 36-66-1 et seq., or their designee.
Variance is a grant of relief from the requirements of this ordinance, which permits construction in a manner otherwise prohibited by this chapter.
Violation means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this chapter is presumed to be in violation until such time as that documentation is provided.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23)
CHAPTER 5 DEFINITIONS
ARTICLE 5.1. GENERAL PROVISIONS
Sec. 5.1.1. Interpretations.
Unless otherwise expressly stated, the following words and phrases shall be construed throughout this UDC to have the meanings indicated in this article. The present tense includes the future; the singular number includes the plural, and the plural the singular; the word "building" includes the word "structure" and shall be construed as if followed by the words "or part thereof"; the word "occupy" includes the words "designed or intended to be occupied"; the word "use" includes the words "arranged, designed or intended to be used."
The words "shall," "must," and "will" are intended to be mandatory; the word "may" is intended to be permissive; and the phrases "must not," "may not," and other negative forms of "may" (e.g., "no person mayv") are intended to be prohibitive.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.1.2. Applicability.
A. Definitions for zoning and subdivision chapters. The definitions provided in article 5.2 — definition of terms apply to the terms used in chapter 1 — general provisions through chapter 3 — subdivisions, unless otherwise stated.
B. Definitions for telecommunications towers and antennas.
(1) The definitions provided in section 2.4.11 — telecommunications antennae and towers apply only to section 2.4.11 — telecommunications antennae and towers.
(2) For the purposes of section 2.4.11 — telecommunications antennae and towers, the definitions provided therein shall prevail in case of conflict with other definitions.
(3) Terms that are not defined within section 2.4.11 — telecommunications antennae and towers have their meaning as defined per article 5.2 — definition of terms.
C. Definitions for environmental chapter. The definitions provided in article 5.2 — definition of terms do not apply to the terms used in chapter 4 — environment.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.1.3. Abbreviations.
The following abbreviations appear in this UDC:
Abbreviation Full Term AASHTO American Association of State Highway Transportation Officials avg. Average
DBH Diameter at Breast Height FAA Federal Aviation Administration FCC Federal Communications Commission Abbreviation Full Term FEMA Federal Emergency Management Agency ft. Feet/foot GDOT The Georgia Department of Transportation LED Light-emitting diode max. Maximum min. Minimum O.C.G.A. Official Code of Georgia Annotated sf. Square feet ROW Right-of-way (Ord. No. 2023-12, § 1(Exh. A), 9-19-23)
ARTICLE 5.2. DEFINITION OF TERMS
Sec. 5.2.1. wAw terms.
Accessory building. A building subordinate to the principal building on the lot and used for purposes customarily incidental to those of the principal building.
Accessory dwelling unit. A dwelling unit that is located on the same lot as a separate principal dwelling unit and where the total number of accessory dwelling units does not exceed one per lot. This definition includes dwelling units that are within the principal building and dwelling units that are within an accessory building on the property of a principal building.
Accessory use. A use subordinate to the principal use of land or a building or other structure on a lot and customarily incidental thereto.
Adult entertainment businesses. Those uses defined as adult entertainment establishments in chapter 18, article VII of the City of Statesboro Code of Ordinances.
Agencies, studios, and associated classrooms. A type of business or professional office use that includes agencies, studios, and associated classrooms for the creation or production of music, art, modeling, and photography.
Aggregate sign area. The combined sign area of all signs regardless of whether or not the signs require a permit or, where specified, all signs of a particular category, on a single parcel. For example, the aggregate sign area of all freestanding signs on a parcel is the sum total of the sign areas of all freestanding signs on such parcel.
Agriculture uses. The cultivating of the soil and the raising and harvesting of the products of the soil, including, but not by way of limitation, nursery, horticulture, forestry and animal husbandry.
Air and gas filled device. Any sign using, either wholly or in part, forced air or other gas as means of supporting its structure.
Alley. A narrow thoroughfare dedicated or used for public passageway with right-of-way up to 20 feet in width, which usually abuts the rear of the premises, or upon which service entrances or buildings abut, and which is not generally used as a thoroughfare by both pedestrians and vehicles, is not used for general traffic, and is not otherwise officially designated as a street. A way which affords only a secondary means of access to abutting property.
Alteration. An alteration, as applied to a building, is any change or rearrangement in the structural parts, or any enlargements, whether by extending on any side or by increasing in height or adapting in any way to a different use, or moving from one location or position to another, or in the case of nonconforming use, any structural change which would prolong the life of such use.
Amenity space. Any at-grade outdoor area of at least 100 square feet intended for use by the residents of the development and their guests, but not for the exclusive use of an individual dwelling unit. Amenity space specifically excludes required sidewalks, stream buffers, zoning buffers, stormwater facilities, and natural water bodies. Amenity space may include, but is not limited to, the following spaces: playgrounds, pool areas, tennis courts, basketball courts, other sports courts, community lawns located outside of existing utility easements, community gardens, hardscape areas improved for pedestrian enjoyment, splash pads, walking trails, dog parks, and wooded areas.
Amusement establishments, indoor. A category of commercial and office uses that includes businesses involved recreation-oriented activities in an indoor setting. Unless otherwise prohibited, such businesses may include but are not limited to: bowling alley; indoor skating rink; and indoor theater.
Amusement establishments, outdoor. A category of commercial and office uses that includes businesses involved recreation-oriented activities in an outdoor setting. Unless otherwise prohibited, such businesses may include but are not limited to: amusement parks;
drive-in theaters; golf driving ranges; outdoor skating rinks; and outdoor theaters.
Applicant.
(1) Any person seeking to install a pre-owned manufactured home in the incorporated area of the City of Statesboro.
(2) Any person seeking a permit or approval established by or administered through this
UDC.
Architectural features. Ornamental or decorative features attached to or protruding from an exterior wall, including cornices, eaves, gutters, belt courses, sills, lintels, bay windows, chimneys, and decorative ornaments.
Artisan manufacturing. A type of use engaged in the manufacturing, assembly, and creation of goods primarily by hand and with small-scale machines that do not produce noise, dust, or odors discernable to the average person outside of the property on which the use is operated.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23; Ord. No. 2025-01, 7-1-25) Sec. 5.2.2. 'B' terms.
Bar. A commercial establishment whose primary activity is the sale of alcoholic beverages to be consumed on the premises and meets the definition of a bar contained in chapter 6 of the Statesboro Code of Ordinances. See also, tavern.
Bank or credit union. An establishment for the custody, loan, exchange, or issue of money, for the extension of credit, and for facilitating the transmission of funds. Such services include providing savings and checking accounts to customers.
Bay window. A window assembly whose maximum horizontal projection is not more than two feet from the vertical plane of an exterior wall and is elevated above the floor level of the building.
Beacon. Any light with one or more beams directed into the atmosphere or directed at one or more points not on the same zone lot as the light source; also, any light with one or more beams that rotate or move.
Block. A parcel of land entirely surrounded by streets or highways, railroad rights-of-way, waterways, or by a combination thereof.
Block face. One side of a street between two consecutive street intersections; or one side of a street between an intersection and the end of the street, in the case of a dead-end street.
A corner lot shall only be considered part of a given block face if its longest frontage is along the given block face. Where a corner lot has the same length of frontage along multiple streets, the property shall be considered part of the block face to which it is addressed.
Buffer. A strip at least ten feet wide, densely planted with shrubs and/or trees at least three feet high at the time of planting, of a type that will possess growth characteristics of such a nature as to produce a dense, compacted evergreen planting screen capable of growing to a height of at least six feet within three years. A landscaping plan identifying all plants to be incorporated in the buffer strips must be approved by the zoning administrator before any site construction. The zoning administrator may require additional planting to acquire a uniform buffer strip.
Buildable area. That portion of any lot which may be used or built upon once various setback requirements have been subtracted and in accordance with the regulations governing the given zoning district within which the particular lot is located, once the various front, side and rear yard requirements required for the district have been subtracted from the total lot area.
Building. Any structure that has enclosing walls and roof, permanently located on the land.
Building: heritage building or historic building. Any of the following:
(1) A building or portion of a building constructed before 1945, according to the records of the Bulloch County Tax Assessor's Office, Sanborn Maps, official building permit data, or other verifiable sources as approved by the zoning administrator.
(2) A building, site, or portion thereof that is listed as a contributing resource to a National Register of Historic Places district or individual listing.
Building, principal. A building in which is conducted the principal use of the lot on which it is situated. Lots with multiple principal uses may have multiple principal buildings.
Building area. The aggregate of the maximum horizontal cross section areas of all buildings on a lot above the ground level, measured at the greatest outside dimensions, excluding cornices, caves, gutters or chimneys projecting not more than 18 inches, bay windows not extending through more than one story and not projecting more than five feet, one-story open porches projecting not more than ten feet, porte-cochere or carport open on three sides and not more than 14 feet high and 20 feet in length, steps and balconies.
Building line. The line which establishes the minimum depth of front yard for the particular district as measured from the street line.
Building site. The ground area of a building or buildings together with all open spaces surrounded by said building or buildings.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.3. (C( terms.
Canopy or awning. A structure made of cloth, metal, or other material affixed to a building and/or supported by the ground. This definition does not include marquee.
Certificate of occupancy. A document issued by the chief building official certifying that a manufactured home is in compliance with applicable requirements set forth by this article and indicating it to be in a condition suitable for occupancy.
Certified document. A survey, sketch plat, map or other exhibit is said to be certified when a written statement regarding its accuracy or conformity to specified standards is signed by the specified professional engineer, registered surveyor, architect, or other legally recognized person.
Chief building official. The person appointed, employed, or otherwise designated as the zoning administrator, permits and inspections; the city building official or any of their assistants.
City. The City of Statesboro, Georgia.
City manager. The City of Statesboro City Manager or their designee.
Compatibility. With regard to buildings: achieving harmony in appearance of architectural features in the same vicinity.
Comprehensive plan. The current adopted comprehensive plan of the City of Statesboro, GA, including maps, charts, and descriptive matter officially adopted by the mayor and city council showing recommendations for the most appropriate use of land and for the most desirable density of population.
Condominium (building). A building containing two or more attached individually owned dwelling units and related, jointly owned, common areas under condominium or cooperative ownership.
Correctional or penal institution. A facility providing housing and care for individuals legally confirmed for violations of law including a prison, jail, reformatory, or detention center. This definition includes institutions that are publicly owned and/or privately owned but licensed or regulated by a public office.
Cottage court. A type of use that accommodates three to nine detached dwelling units organized around a shared internal courtyard. Such a use does not include attached dwelling units.
Clinics and medical offices. Healthcare facilities that provide medical care to patients on an outpatient basis. Clinics and medical offices may specialize in a specific medical field, may be owned or operated by one or a few physicians, and may provide primary care services or specialist medical services. Clinics and medical offices may offer a variety of healthcare services including laboratory testing, diagnostic imaging, physical therapy, and diagnosis, treatment, prevention, and management of illness and disease. Examples of clinics and medical offices include but are not limited to dentists, therapists, pediatricians, and opticians.
Creek on the Blue Mile. An existing or planned multi-use trail or pedestrian walkway primarily running along Little Lott Creek.
Customer service area. Any portions of an establishment that are not restricted from access by customers, clients, patients, patrons, and/or visitors. (E.g., the sales floor and public bathrooms of a store; the hair dresser booths of a salon; the public spaces of a museum;
the elevator lobbies and pay stations of a parking garage; the auditorium and hallways of a performance hall.) This definition does not include parking spaces, drive aisles, driveways, or other spaces reserved for parking or maneuvering vehicles.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.4. )D) terms.
Day-care center. As defined in O.C.G.A. § 37-6-1: Any facility that is operated and maintained for and is qualified to furnish care and training to individuals with developmental disabilities on less than a 24-hour basis.
Day care center. Any place operated by a person, society, agency, institution, or group wherein are received for pay group day care for fewer than 24-hours per day without transfer of legal custody of 19 or more children 18 years old or under.
Day care, family child care home. A private residence operated by any person who receives therein for pay for supervision and care fewer than 24 hours per day, without transfer of legal custody, three but not more than six children under 18 years of age who are not related to such persons and whose parents or guardians are not residents in the same private residence.
Day care, group. Any place operated by a person, society, agency, institution, or group who receives therein for pay for supervision and care fewer than 24 hours per day not less than seven nor more than 18 children under 18 years of age.
Density. The permitted number of dwelling units per gross acre of land developed or used for residential purposes. Unless otherwise clearly stated, density requirements in this chapter are expressed in terms of dwelling units per net acre, that is per acre of land devoted to residential use exclusive of land utilized for streets, alleys, drives, parks, playgrounds, school grounds, or other public uses.
Diameter at breast height. The diameter of a tree measured as described in section 2.1.4 — rules of measurement.
Director. The director of planning and development or their designee, unless otherwise indicated.
Dormer. A window projecting from a roof.
Dwelling. A building designed for and occupied exclusively for residential purposes, including short-term rental, group homes, institutional residential, and the like.
(1) Dwelling: Ground-floor (accessory). A portion of a building, other than its nonresidential uses along street-fronting elevations, in which the dwelling portion of the building provides complete housekeeping facilities for a household.
(2) Dwelling: Multi-household. A building, not a one-household dwelling, two-household dwelling, or townhouse dwelling, designed for and occupied exclusively for dwelling purposes by three or more households living independently of one another.
(3) Dwelling: One-household. A building designed for and occupied exclusively as a dwelling for one household and occupying its own lot.
(4) Dwelling: Townhouse. A building designed for and occupied exclusively for dwelling purposes by three or more units living independent of one another and where each dwelling unit is attached to another unit and separate from it vertically by a common side wall, and where no dwelling unit is located above or below another dwelling unit. Townhomes are distinguished from multifamily units by adherence to all subsections of section 2.4.12 and require individual permitting per unit and not for the individual building.
(5) Dwelling: Two-household. A building designed for and occupied exclusively as a dwelling for two households and occupying its own lot.
(6) Dwelling: Tiny Home. A building between 400 and 749 square feet designed exclusively for dwelling purposes, and generally as a part of a larger development containing common areas managed by an appropriate association or management company within the medium-density and high-density multi-family residential districts upon approval of a special use permit. Tiny homes may not fall under American National Standards Institute A.119.2 which regulates recreational vehicles, and must meet all applicable building codes as adopted by the city. Tiny home developments must additionally meet the site requirements as set forth in section 2.4.2.
Dwelling unit. A building or portion thereof providing complete housekeeping facilities for one household, including provisions for living, sleeping, eating, cooking, and sanitation.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23; Ord. No. 2025-01, 7-1-25) Sec. 5.2.5. *E* terms.
Easement. A grant of a strip or a parcel of land to the general public, a corporation, or certain person for use for a specific purpose. No vertical construction of any kind is permitted in or upon easements, except that required in connection with the designated use.
Eating establishments. A commercial establishment where food and beverages are prepared and served for consumption on or off the premises and where food sales constitute a minimum of 50 percent of the gross sales receipts for food and beverages. This definition includes restaurants, cafeterias, and fast-food facilities. This definition does not include bars, taverns, or retail establishments.
Eave. The projecting lower edges of a roof overhanging the wall of a building.
Educational facility. Establishments for instruction and education including elementary, middle, and high schools, colleges, and universities. This definition does not include correctional or penal institutions.
Engineer. A person being licensed by the State of Georgia as a registered professional engineer, capable of determining the correct manner in which to construct roads, streets, highways, water and sewage systems, drainage systems, structures or other technical related areas and as legally described by the laws of the State of Georgia.
Event facility. A facility or assembly hall available for lease by private parties or special events, such as weddings, birthdays, family reunions, meetings or conferences, and similar events.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 20-1A-2. *F* terms.
Family child care learning home. As defined in O.C.G.A. § 20-1A-2: a private residence operated by any person who receives therein for pay for supervision and care less than 24 hours per day, without transfer of legal custody, at least three but not more than six children under 13 years of age who are not related to such person and whose parents or guardians are not residents in the same private residence; provided, however, that the total number of unrelated children cared for in such home, for pay and not for pay, may not exceed six children under 13 years of age at one time.
Flag. Any fabric, banner, or bunting containing distinctive colors, patterns, or symbols, used as a symbol of a government, political subdivision, or other entity.
Flood plain. The definition for special flood hazard area.
Flood prone areas. The land that is usually flooded whenever a rise in the water level of a creek, stream, river or other body of water is experienced or when there is an unusual and rapid accumulation or runoff of surface waters from any source. That land adjacent to a creek designated as a flood plain or flood prone area by a governmental agency, such as
FEMA.
Fuel Sales. A facility including tanks, piping, and related equipment that is used for the storage, sale, and dispensing of petroleum gas.
Funeral home or mortuary. An establishment for the preparation and display of the deceased for burial, and/or the preparation and display of the deceased for cremation, including services provided to assemblies of people in connection with the burial or cremation of the deceased.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.7. +G+ terms.
Garage. A structure used for the storage of a motor vehicle, or a structure used to service or repair a motor vehicle.
(1) Garage: Private garage. An accessory building or part of a principal building used for the storage of motor vehicles owned and used by the owner or tenant of the premises, and for the storage of not more than two vehicles owned and used by persons other than the owner or tenant of the premises. Not more than two commercial vehicles or trucks may be stored in a private garage.
(2) Garage: Public garage. A building, other than a private garage or storage garage, one or more stories in height, used solely for the commercial storage, service or repair of motor vehicles.
(3) Garage: Storage garage. See parking garage.
Gasoline service station. Any area of land, including structures thereon, or any building or part thereof, that is used for the sale of gasoline or other motor vehicle fuel or accessories, and which may or may not include facilities for lubricating, washing or otherwise servicing motor vehicles but which shall not include painting or body and fender repairs.
Ground story. The lowest story above grade within a building.
Group development. A development comprising two or more principal structures, whether in single, condominium, or diverse ownership built on a single lot, tract or parcel of land and designed for occupancy by separate families, firms, businesses or other enterprises. Such development generally contains parcels or tracts of land in common and such land is controlled and maintained through a property owner's association or similar group.
Governing authority. The mayor and city council members of the City of Statesboro.
Group home. A residential care facility in which:
(1) The operator is not legally related to the individuals supervised and is licensed by the State of Georgia to provide community alternatives in a residential environment to institutional care for individuals in need of such care; and
(2) More than four persons reside, including operators, supervisors, and individuals under care; and
(3) Such individuals are provided with room, board, personal, physical care and supervision in a family environment. The term "group home" includes, without limitation by reason of enumeration, home as established under the "Community Services Act for the Mentally Retarded" (Ga. Laws 1972, page 700), and other homes of similar intention and purpose; but does not include facilities housing persons convicted of crimes but not housed in penal institutions.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.8. ,H, terms.
Health care facilities. A category of institutional uses that provide medical services to individuals or groups of individuals. Unless otherwise prohibited, such uses include clinics and medical offices, and hospitals.
Height of building. A building's vertical measurement from the mean level of the ground surrounding the building to a point midway between the highest and lowest points on the roof.
Home occupation. An occupation for gain or support conducted only by members of a household residing on the premises and conducted entirely within the dwelling, providing that no article is sold or offered for sale except such as may be produced by members of the household residing on the premises.
Hospital. An establishment which has an organized medical staff and provides equipment and services primarily for inpatient care to persons who require definitive diagnosis and/or treatment for injury, illness, pregnancy, or disability.
Hotel. A building used for the purpose of furnishing for compensation more or less temporary lodging to the public, with or without meals, and having lodging accommodations for ten or more persons.
Household. This definition does not include any organization or institutional group. This definition includes any of the following groups living together as a single nonprofit housekeeping unit and sharing common living, sleeping, cooking, and eating facilities:
(1) A person living alone.
(2) Any number of persons that are related by blood, marriage, adoption, guardianship, foster, or other duly authorized custodial relationship, plus two unrelated persons.
(3) Two unmarried persons, plus any parents, children, or siblings related to either.
(4) A maximum of three unrelated persons.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.9. -I- terms.
Industrial uses, heavy. Facilities that involve dangerous, noxious, or offensive uses or a facility that has smoke, odor, noise, glare, fumes, gas, vibration, threat of fire or explosion, emission of particulate matter, interference with radio, television reception, radiation, or any other likely cause. Heavy industrial uses include, but are not limited to, the following:
(1) Animal processing, packing, treating and storage, livestock or poultry slaughtering, production of lumber, explosives, fireworks, tobacco, chemical, rubber, leather, clay, bone, paper, pulp, plastic, stone, or glass materials or products, production or fabrication of metals or metal products including enameling and galvanizing.
(2) Bottling plant.
(3) Bulk fuel sales.
(4) Bulk storage of flammable liquids, chemical, cosmetics, drug, soap, paints, fertilizers and abrasive products.
(5) Chemical, cosmetics, drug, soap, paints, fertilizers and abrasive products.
(6) Concrete batch plant.
(7) Petroleum, liquefied petroleum gas and coal products and refining.
(8) Prefabricated building manufacturing.
(9) Sawmill, log production facility, lumberyard.
(10) Rubber and plastic products, rubber manufacturing.
Industrial uses, light. Facilities conducting light manufacturing operations within a fully-enclosed building and that consistently meets the specific use standards of section 2.4.6 — light industrial uses. Light industrial includes, but is not limited to, the following:
(1) Assembly or manufacturing of scientific measuring instruments; semiconductor and related devices, including, but not limited to, clocks, integrated circuits, jewelry, medical, musical instruments, photographic or optical instruments or timing instruments.
(2) Brewery, winery, distillery.
(3) Clothing, textile or apparel manufacturing.
(4) Furniture upholstery installation or reupholstery.
(5) Micro-producers.
(6) Motion picture studio.
(7) Pharmaceutical or medical supply manufacturing.
(8) Recreational equipment manufacturing.
(9) Sheet metal, welding, machine shop, tool repair.
(10) Toy manufacturing.
(11) Woodworking, cabinet makers or furniture manufacturing.
Install. Regarding manufactured homes: To construct a foundation system and to place or erect a manufactured home on such foundation system. Such term includes, without limitation, supporting, blocking, leveling, securing, or anchoring such manufactured home and connecting multiple or expandable sections of such manufactured home.
Institutional residential. An umbrella term that encompasses the following uses as defined below: assisted living community, independent living, intermediate care home, nursing home, personal care home and skilled nursing care facility.
(1) Institutional residential: Assisted living community. Residences for the frail elderly that provide rooms, meals, personal care, and supervision of self-administered medication.
(2) Institutional residential: Independent living. Adults at least 55 years of age or older living within multi-household rental properties with central dining facilities that provide residents, as part of their monthly fee, access to meals and other services such as housekeeping, linen service, transportation, and social and recreational activities. Independent living facilities do not provide, in a majority of the units, assistance with activities of daily living such as supervision of medication, bathing, dressing, and toileting. There are no licensed skilled nursing beds on the property.
(3) Institutional residential: Intermediate care home. A facility that admits residents on medical referral only, and includes the provision of food, and special diets when required, shelter, laundry, and personal care services, such as help with dressing, getting in and out of bed, bathing, feeding, medications and similar assistance, such services being under appropriate licensed supervision. Intermediate care does not normally include providing care for bed-ridden patients except on an emergency or temporary basis.
(4) Institutional residential: Nursing home. A facility that admits patients on medical referral only and for whom arrangements have been made for continuous medical supervision, maintains the services and facilities for skilled nursing care, rehabilitative nursing care, and has a satisfactory agreement with a physician and dentist who will be available for any medical or dental emergency and who will be responsible for the general medical and dental supervision of the home.
(5) Institutional residential: Skilled nursing care facility. A facility that admits residents on medical referral; it maintains the services and facilities for skilled nursing care and has a satisfactory agreement with a physician and dentist who will provide continuing supervision including emergencies; it complies with rules and regulations of the Georgia Department of Human Resources. The term "skilled nursing care" means the application of recognized nursing methods, procedures, and actions directed toward implementation of the physician's therapeutic and diagnostic plan, detection of changes in the human body's regulatory system, preservation of such body defenses, prevention of complications and emotional well-being, including but not limited to the following:
(i) The administration of oral or injectable medications which cannot be selfadministered. Other include the administration of oxygen, the use of suction, the insertion or changing of catheters, the application of medicated dressings, the use of aseptic technique and preparation of the patient for special procedures; and
(ii) Observation in the care of the patient for symptoms and/or physical and mental signs that may develop and which will require attention of the physician and a revision in the patient's treatment regimen.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.10. .J. terms.
Junkyard. Included in the vehicle-related establishments use category: a lot, structure, or part thereof, used primarily for the collection, storage, and sale of wastepaper, rags, scrap metal or discarded material, or for the collection, dismantling, storage, and salvaging of machinery or vehicles not in running condition, and for the sale of parts thereof.
Jurisdiction. The incorporated area of the City of Statesboro, Georgia.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.11. .K. terms.
[Reserved] (Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.12. .L. terms.
Landfill. Any facility used solely for the disposal of solid waste and classified as either sanitary or inert.
(1) Landfill: Inert. A disposal facility that accepts waste that is unlikely to produce leachate that is a concern to the environment as defined by EPD.
(2) Landfill: Sanitary. A designed disposal site for general household waste, where waste is layered with soil to prevent contamination.
Laundry or dry-cleaning establishment. A type of service establishment where customers wash and dry clothing and other fabrics in machines operated by the customer, or where employees process clothing and other fabrics for cleaning using organic solvents without water.
Live/work unit. A combination dwelling unit/commercial unit which allows a person or persons to reside and operate a commercial enterprise within the unit. Live/work units occupy an otherwise permitted dwelling unit count towards any applicable density calculations.
Loading space. A space, accessible from a street or way, in a building or a lot, for the temporary use of vehicles, while loading or unloading merchandise or materials.
Lodging establishments. Any structure or any portion of a structure containing guest rooms, and which is occupied or is intended or designed for occupancy by paying guests, whether rent is paid in money, goods, labor, or otherwise. Such structures include any lodging house, dormitory, studio hotel, motel, truck stop, lodge, inn, time-share or other condominium, apartment community, public club, or private club. This definition does not include any hospital, short-term rental, asylum, sanitarium, orphanage, jail, prison, or other buildings in which human beings are housed and detained under legal restraint.
Lot. A parcel of land which is occupied, or is to be occupied, by one principal building or other structure or use, together with any accessory buildings or structures or uses customarily incidental to such principal building or other structure or use, and any such open spaces as are arranged or designed to be used in connection with such principal buildings or other structures or use, such open spaces and the area and dimensions of such lot being not less than the minimum required by this ordinance. A lot may also be any piece or parcel of land, of which the boundaries have been established by a legal instrument of record and meet the requirements of the UDC.
(1) Lot: Corner lot. A lot situated at the intersection of two or more streets, having an angle of intersection of not more than 135 degrees.
(2) Lot: Double frontage lot. A lot that has frontage along two streets which do not intersect at the boundaries of the lot.
(3) Lot: Interior lot. A lot other than a corner lot or of double frontage lot.
(4) Lot, reverse frontage. A lot having frontage on two or more public streets, the access of which is restricted to one street.
(5) Lot: Through lot. See double frontage lot.
Lot area. The total horizontal area of the lot lying within the lot lines, provided that no area of land lying within any street line shall be deemed a portion of any lot area. The area of any lot abutting a street shall be measured to the street line only.
Lot line. A property boundary line of any lot held in single or joint ownership, except that in the case of any lot abutting a public or private right-of-way, the lot line for such portion of the lot as abuts the right-of-way shall be deemed to be the same as the street line and shall not be the centerline of the street, or any other line within the public or private right-of-way even though such may be the property boundary line.
Lot line, front. In the case of a lot abutting upon only one street, the front lot line is the line separating such lot from such street. In the case of a corner lot, that part of the lot having the narrowest frontage on any street shall be considered the front lot line. In the case of any other lot, one such line shall be elected to be the front lot line for the purpose of this chapter, provided it is so designated by the building plans which meet the approval of the zoning administrator and UDC administrator.
Lot line, rear. The rear lot line is that boundary which is opposite and most distant from the front lot line. In the case of a lot pointed at the rear, or any odd-shaped lot, the rear lot line shall be determined by the zoning administrator and UDC administrator.
Lot line, side. A side lot line is any lot boundary line, not a front lot line or a rear lot line.
A side lot line separating a lot from a street is an exterior side lot line. A side lot line separating a lot from another lot, or lots, is an interior side lot line.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23; Ord. No. 2025-01, 7-1-25) Sec. 5.2.13. /M/ terms.
Manufactured home. As defined in O.C.G.A. § 8-2-121: A structure, transportable in one or more sections, which, in the traveling mode, is eight body feet or more in width or 40 body feet or more in length or, when erected on site, is 320 or more square feet and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities and includes the plumbing, heating, air conditioning, and electric systems contained therein; except that such term shall include any structure which meets all the requirements of this definition except the size requirements and with respect to which the manufacturer voluntarily files a certification required by the Secretary of Housing and Urban Development and complies with the standards established under the National Manufactured Housing Construction and Safety Standards Act of 1974, 42, U.S.C. section 5401, et seq.
Manufactured home community. This is also referred to as a mobile home park. As defined in O.C.G.A. § 44-14-349: A parcel or tract of land on which three or more manufactured homes or mobile homes are located on a continual, nonrecreational basis and offered to the public.
Marquee. A permanent roof-like structure projecting beyond a building or extending along and projecting beyond the wall of the building, but not supported by the ground, and constructed of durable material to provide protection from the weather.
Mayor and city council. The mayor and/or city council of the City of Statesboro.
Metes and bounds description. A method of property description provided by a certified surveyor whereby properties are described by means of their direction and distances from an easily identifiable location or point.
Motor court or motel. A building and/or a group of two or more detached or semidetached buildings containing rooms or apartments having separate ground story entrances provided directly or closely in connection with automobile parking or storage space serving such rooms or apartments, which building or group of buildings is designed, intended or used principally for the providing of sleeping accommodations for automobile travelers and is suitable for occupancy at all seasons of the year.
Mobile home. As defined in O.C.G.A. § 8-2-131: A structure, transportable in one or more sections which, in the traveling mode, is eight body feet or more in width or 40 body feet or more in length or, when erected on site, is 320 or more square feet and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities and includes the plumbing, heating, air conditioning, and electrical systems contained therein and manufactured before June 15, 1976.
Modular or industrialized building. As defined in O.C.G.A. § 8-2-111: Any structure or component thereof which is designed within the state minimum standards codes and is wholly or in substantial part made, fabricated, formed, or assembled in manufacturing facilities for installation or assembly and installation on a building site and has been manufactured in such a manner that all parts or processes cannot be inspected at the installation site without disassembly, damage to, or destruction thereof. As defined in O.C.G.A. § 8-2-111: Component means any assembly, subassembly, or combination of parts for use as part of a building, which may include structural, electrical, plumbing, mechanical, and fire protection systems and other systems affecting health and safety. See also:
residential industrialized building.
Municipal, county, state, or federal uses. Any offices and uses established for and/or operated by a public agency of municipal, county, state, or federal government. For the purposes of use permissions within this Code, this definition excludes correctional or penal institutions and sanitary landfills, even if such uses would be established for and/or operated by a public agency.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.14. N terms.
Natural grade level. The lower of (A) the existing grade level before construction, or (B) the proposed new post-construction grade level, exclusive of any filling, berming, mounding, or excavating for the purpose of locating a sign or structure.
Newspaper publishing or job printing. Commercial printing of items including newspapers, letterheads, circulars, invitations, postcards, and similar or related materials.
Nonconforming. A building or other structure, use or lot, which by reason of design, size or use, does not conform with the requirements of the district, or districts, in which it is located.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.15. O terms.
Official city trail. Any of the following:
(1) An existing paved multi-use trail, such as the S and S Greenway Trail or the Willie McTell Trail; or
(2) An existing paved pedestrian walkway with its own off-street alignment and specifically excluding sidewalks along public streets; or
(3) A multi-use trail or walkway listed in (1) or (2) above that has not been built but is identified in a plan that has been adopted, accepted, approved, funded, or otherwise officially endorsed by the city.
Outparcel. Individual retail sites in a shopping center. The square footage of outparcels must be at least 20,000 square feet.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.16. P terms.
Parcel. See lot.
Parks or playgrounds. An area open to the public that is reserved for recreational or scenic purposes.
Parking garage. A building or portion thereof, other than a private garage or public garage, one or more stories in height, used solely for the storage of motor vehicles (other than trucks), but not for the sale, service, or repair thereof, nor for the sale of fuel, accessories, or supplies. This definition does not include parking lots.
Parking lot. A group of parking spaces at grade level that are not part of a storage garage.
This definition does not include junkyards.
Parking space. A reasonably level space, available for the parking of one motor vehicle, not less than ten feet wide, when measured perpendicular to its longest side, and having a surface area of not less than 190 square feet exclusive of passageways or other means of circulation or access.
Pennant. Any lightweight fabric or other similar material, message or no message, suspended from a rope, wire, or string, usually in a series, designed to move in the wind.
Performance standards. Measures and standards by which the suitability of a proposed use can be measured by the extent of its external effect.
Person. Any individual, firm, partnership, association, corporation, company, or organization, singular or plural, of any kind.
Personal services facilities. A category of person-to-person nonmedical service businesses including beauty salons, tanning facilities, barbershops, nail salons, massage parlors, and tailors.
Planning commission. The City of Statesboro Planning Commission.
Plat. A map showing the features of a proposed subdivision (lot split, metes and bounds description). This plat would show the entire tract, and the lot which is to be subdivided, the adjacent properties and owners, roads, or streets, and giving all necessary bearings and distances for the proposed "split."
Plat, final. The subdivision plat submitted to mayor and city council for final approval and subsequently to be recorded with the Clerk of Court of Bulloch County.
Plat, preliminary. A map showing the salient features of a proposed subdivision, including topographical data, submitted to the zoning administrator and UDC administrator for purposes of preliminary consideration.
Plat, sketch. A simple sketch plan of the proposed subdivision submitted to the zoning administrator for review.
Pre-owned manufactured home. Any manufactured home that has been previously used as a dwelling and has been titled.
Principal building. A building in which is conducted the principal use of the lot on which it is situated.
Public use. Use of any land, water, or buildings by a municipality, public body or board, commission or authority, county, state or federal government, or any agency thereof for a public service or purpose.
Public assembly facilities. A category of institutional uses that private for private and/or public gathering of groups of people for a common cause or purpose. Unless otherwise prohibited, such uses include religious or philanthropic institutions and social lodges or clubs.
Public utilities. Any underground or overhead installation including poles, conduits, pipes, and cables that carry services for the public to use (i.e., water and gas mains, sanitary and storm sewer and pipes, power and T.V. cables).
Public utility facilities. A building or structure and its equipment used for the transmission and exchange of telephone, radio-telephone, gas, power, sewer and water facilities;
provided, however that in a residential district these shall not include public business facilities, storage of materials, truck or repair facilities, or housing of repair crews.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.17. Q terms.
[Reserved] (Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.18. R terms.
Religious or philanthropic institutions. An establishment where people assemble for civic, cultural, philosophical, spiritual, and/or religious purposes.
Residential. The term "residential" or "residence" is applied herein to any lot, plot, parcel, tract, area, or piece of land and/or any building used exclusively for family dwelling purposes or intended to be used, including accompanying uses specified herein.
Residential district. See zoning district, residential.
Residential industrialized building. As defined in O.C.G.A. § 8-2-111: Any dwelling unit designed and constructed in compliance with the Georgia State Minimum Standard Oneand Two-Family Dwelling Code which is wholly or in substantial part made, fabricated, formed, or assembled in a manufacturing facility and cannot be inspected at the installation site without disassembly, damage to, or destruction thereof. Any such structure may or may not contain a permanent metal chassis but shall be affixed to a permanent load-bearing foundation. The term shall not include manufactured homes as defined by the National Manufactured Housing Construction and Safety Standards Act of 1974, 42 U.S.C. section 5401, et seq.
Reserve strip. A small strip of land between the end (terminus) of a platted street right-of-way and the plat boundary whose ownership could be retained by the subdivider which would prevent the extension of said street into adjacent property.
Retail establishments. A category of commercial and office uses that includes businesses involved in the sale, lease, or rental of new or used products to the public for personal or household consumption. Unless otherwise prohibited, such businesses may include selling, leasing, or renting goods including but not limited to: animal feed; antiques; appliances; art;
art supplies; automobile and motorcycle parts and accessories (excluding on-site installation); baked goods; bicycles; books; building supplies (including heating, plumbing, and other home improvement materials); cameras (including photographic supplies); carpet and floor coverings; clothing; collectibles; computers; convenience goods; crafts; electronic equipment;
electronic and mixed media; fabric; flowers; furniture; garden supplies (including plants and seeds); gifts or novelties; groceries (including the accessory sale of alcoholic beverages for offsite consumption); hardware; household products; jewelry; luggage; medical supplies (including pharmaceutical materials); monument sales; musical instruments; office supplies;
pawned items; pets and pet supplies; picture frames; postal supplies; printed materials;
produce; school supplies; second-hand goods; souvenirs; shoes; sporting goods; tobacco and related products; and toys. This definition includes retail greenhouse or nursery. This definition does not include eating establishments or service establishments.
Retail greenhouse or nursery. A facility where plant life such as grasses, flowers, shrubbery, and trees are grown and raised for sale.
Right-of-way line. The outside boundaries of a property owned by the governmental body on which the roadway system exists, which are established by usage, dedication or official action.
Rope lighting. A primarily decorative lighting fixture featuring small light bulbs linked together and encased in a PVC or similar jacket to create a string of lights in which each individual light bulb is directly or indirectly visible.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.19. S terms.
Sanitary landfill. An establishment meeting the definitions of any of the following terms as defined in O.C.G.A. § 12-8-22:
(1) Disposal facility.
(2) Landfill.
(3) Materials recovery facility.
(4) Municipal solid waste disposal facility.
(5) Municipal solid waste landfill.
(6) Regional landfill or regional solid waste disposal facility.
(7) Solid waste handling facility.
Screen enclosure. A structure characterized by a network of metal or wood members with open mesh panels for both walls and roof.
Service establishments. A category of commercial and office uses for businesses that provide nonmedical services to individual customers or groups of customers. Unless otherwise prohibited, such businesses may include banks or credit unions, personal services facilities, funeral homes or mortuaries, and laundry or dry-cleaning establishments. This definition does not include retail establishments or eating establishments.
SES (solar energy system). A device or structural design feature that provides for the collection, storage, and distribution of solar energy for electricity generation. This definition shall only include (1) photovoltaic systems that convert solar energy into electricity through a semiconductor device; or (2) solar thermal systems that use collectors to convert the sun's rays into useful forms of energy for water heating, space heating, or space cooling.
(1) SES: Building-integrated. A SES where solar materials are used in place of traditional building components such that the SES is structurally an integral part of a house, building, or other structure, such as a building façade, skylight, or roofing shingles.
(2) SES: Ground mounted. A SES that is structurally mounted to the ground. For purposes of this ordinance, the acreage of land occupied by a ground mounted solar energy system is calculated by drawing a perimeter around the outermost SES solar panels and auxiliary structures. Substations and transmission lines outside of this perimeter shall not be included in this calculation.
(3) SES: Ground-mounted intermediate scale. A ground-mounted SES that occupies at least three and up to 15 acres.
(4) SES: Ground-mounted large scale. A ground-mounted SES that occupies more than 15 acres. This definition includes solar farms.
(5) SES: Ground-mounted small scale. A ground-mounted SES that occupies less than three acres. This definition includes solar gardens.
(6) SES: Rooftop mounted. A SES that is structurally mounted to the roof of a house, building, or other structure.
Self-storage. A facility providing separate storage areas for personal or business use designed to allow private access by the tenant for storing or removing personal property.
Self-service storage includes indoor multi-story storage facilities, mini-warehouse, and self-service warehouses.
Setback. A measurement of the shortest distance between a specified property line and the nearest part of the applicable building, structure, or sign, as measured perpendicularly to the property line.
Shopping center. A group of businesses within one or more buildings owned, operated, managed, or otherwise identified as a cohesive development with shared parking and containing a variety of retail, service, and/or office uses.
Short-term rental. A dwelling that provides lodging without meals and in which sleeping accommodations for less than ten persons are provided for compensation for no longer than 30 consecutive days at a time, and meeting all applicable licensing requirements by the city.
Sign. Any fixture, placard, structure, or device illuminated or non-illuminated that uses any color, form, graphic, symbol, or writing to convey information of any kind and which is visible to the public from public rights-of-way and/or public property.
(1) Sign: Animated sign. A sign that utilizes moving structural elements, flashing or sequential lights, lighting elements, or other automated methods to create movement, the appearance of movement, or other special effects. Signs meeting the definition of and regulations governing changeable copy signs and traffic control devices and warning signs meeting the standards of the Manual of Uniform Traffic Control Devices are not considered animated signs.
(2) Sign: Banner sign. Any sign printed or displayed on lightweight fabric, or similar flexible material with or without frames and that is mounted to a pole or building at more than one edge. When mounted, banners shall remain stationary and not flap or wave in a manner similar to a flag or pennant. Flags and pennants shall not be considered banners.
(3) Sign: Billboard. A freestanding sign having a sign area of greater than 150 square feet.
(4) Sign: Building sign. Any sign attached to any part of a building.
(5) Sign: Canopy sign. Any sign that is part of or attached to an awning, canopy, or other fabric, plastic, or other structural protective cover over a door, entrance, window, or outdoor service area. A marquee is not a canopy.
(6) Sign: Changeable copy sign. A sign designed to allow the changing of letters, words, logos, or symbols through manual, electric, or electronic means without altering the face or surface of the sign, or creating movement or the appearance of movement. For purposes of this article, a changeable copy sign does not include an animated, or tri-vision sign; or a sign utilizing LED or similar digital technology.
(7) Sign: Freestanding sign. A sign which is attached to, or part of, a completely self-supporting structure. The supporting structure shall be set firmly in or below the ground surface and shall not be attached to any building or any other structure.
Freestanding signs may take the form of either monument or stanchion signs as defined herein.
(8) Sign: Incidental sign. A sign of no more than two square feet that serves the purpose of guiding safe traffic movements onto, from or on property, and without which there is an increased risk of incompatible traffic movements or obstructions. Examples of incidental signs include but are not limited to "stop," "no parking," "entrance," "loading zone" and other similar traffic related directives.
(9) Sign: LED sign. Any sign or portion thereof that utilizes light emitting diode technology or other similar semiconductor technology to produce an illuminated image, picture, or message of any kind whether the image, picture, or message is moving or stationary. This type of sign includes any sign that uses LED technology of any kind whether conventional (using discrete LEDs), surface mounted (otherwise known as individually mounted LEDs), transmissive, organic light emitting diodes (OLED), light emitting polymer (LEP), organic electro polymer (OEL), or any other similar technology.
(10) Sign: Monument sign. A freestanding sign which forms a solid structure from the ground to the top of the sign.
(11) Sign: Nonconforming sign. Any sign which, while legal at the time of erection, does not comply with the requirements of the UDC.
(12) Sign: Pole sign. See stanchion sign.
(13) Sign: Portable sign. Any sign which is not permanently attached to the ground or other permanent structure, or a sign designed to be transported by wheels or trailer;
signs converted to A-frames or T-frames; umbrellas used for advertising, and signs attached to or painted on vehicles parked and visible from the public right-of-way, unless said vehicle is used in the normal day-to-day operation of the business or organization for purposes other than signage.
(14) Sign: Projecting sign. Any sign which is affixed to a building or wall and its leading edge extends beyond the line of such building or wall or beyond the surface of that portion of the building or wall to which it is affixed by more than 12 inches.
(15) Sign: Roof sign. Any sign erected, constructed, or maintained in whole or a part upon, against, or above the eave of a peaked roof or parapet line of a flat roof.
(16) Sign: Spectacular sign or device. Signs or devices, whether permanent or temporary, utilizing out of the ordinary materials, configurations or devices, including, but not limited to, (i) balloons; (ii) animated animal forms; (iii) costumed human or animal figures; and (iv) other attention-getting devices. "Spectacular sign or device" does not include banners, flags or pennants meeting the standards of this ordinance.
(17) Sign: Special event sign. See temporary sign.
(18) Sign: Stanchion sign. A freestanding sign that is mounted on a pole or other vertical support such that the bottom of the sign face is elevated above ground level and there is no visual obstruction other than the vertical support between the ground and the bottom of the sign face.
(19) Sign: Standard informational sign. A sign with an area not greater than four and one-half square feet, with a sign face made for short-term use, containing no reflective elements, flags or projections and which, when erect, stands at a height not greater than three feet and is mounted on a stake or metal frame with a thickness or diameter not greater than one and one-half inches.
(20) Sign: Suspended sign. Any sign which is suspended from the underside of a horizontal plane surface and is supported by such surface.
(21) Sign: Temporary sign. A sign not permanently attached to the ground or other structure, excluding signs meeting the definition of and standards for "standard informational signs" and located on residential property.
(22) Sign: Tri-vision sign. A sign designed with a series of slats that mechanically rotate in sequence with one another to show multiple different sign messages in sequence.
For purposes of this article, a tri-vision sign is not a changeable copy sign.
(23) Sign: Wall sign. Any sign attached parallel to, but within 12 inches of a wall, painted on the wall surface of, or erected and confined within the limits of an outside wall of any building or structure which is supported by such wall or building and which displays only on one sign surface.
(24) Sign: Window sign. Any writing, pictures, symbols, or combination thereof, attached to, placed upon, or painted on the interior of a door or window or upon the windowpanes or glass and visible from the exterior of the window or door.
Social lodge or club. A voluntary association of persons organized for civic, charitable, cultural, recreational, or similar purpose.
Solar energy easement. An easement on the height or location, or both, of structures or vegetation, or both, for the purpose of providing access to sunlight.
Solar farm. A large-scale SES that contains at least 100 arrays of photovoltaic panels and/or that covers the majority of a parcel.
Solar garden. A small-scale solar energy system that is sometimes operated under the form of a cooperative.
Solar glare. The effect produced by light reflecting from a solar panel with an intensity sufficient to cause annoyance, discomfort, or loss in visual performance and visibility.
Solar photovoltaic (PV) systems. A collection system that produces electricity by the use of photovoltaic cells which generate electricity when exposed to sunlight.
Special flood hazard area. An area having special flood hazards (subject to a one percent or greater chance of flooding in any given year), and shown on the FHBM or FIRM for a community. Also referred to as the 100-year flood plain.
Street. That portion of a public right-of-way or private way which is primarily devoted to vehicular use. A street normally provides primary access and space for utilities to abutting property. Streets are further classified as major arterial, minor arterial, collector, local, and other designations.
(1) Street: Major arterial. A street designated by the public works and engineering department that is used primarily for serving large volumes of comparatively high speed traffic and to which access is controlled.
(2) Street: Minor arterial. A street, which is designated by the public works and engineering department, used primarily for serving large volumes of traffic, but smaller volumes than are normally served by major arterial streets. Speed is comparatively high.
(3) Street: Collector. A street designated by the public works and engineering department, or a logical geographic extension thereof as determined by the UDC administrator. A collector street carries traffic from local streets to the major and minor arterial streets. Traffic volumes are substantial but smaller than normally served for minor arterial streets.
(4) Street: Local. A street which is primarily for access to abutting properties. It carries low traffic volumes. This term encompasses all highways not classified by either arterial or collector streets.
Street, cul-de-sac. A local street of short length having one end open to traffic and one end terminating in a vehicular turn-around.
Street, dead end. A street not intersecting other streets at both ends, and distinguished from a cul-de-sac by not being terminated by a vehicular turn-around.
Street, marginal access. A minor service street which parallels and which is immediately adjacent to an arterial street (frontage road).
Street frontage. The distance for which a lot adjoins a public street, from one lot line intersecting said street to the furthest distant lot line intersecting the same street.
Street line. The dividing line between a lot and the outside boundary or ultimate right-of-way line of a public street, road or highway legally opened or officially plotted or between a lot and a privately owned street, road or way over which the owners or tenants of two or more lots each held in single and separate ownership have the right-of-way.
Street, width. The width of the right-of-way, which is the shortest distance between the lines delineating the right-of-way of a street.
Surveyor. A person licensed by the State of Georgia as a registered land surveyor.
Structure. Any form or arrangement of building material involving the necessity of providing proper support, bracing, tying, anchoring or other protection against the forces of the elements, including anything constructed or erected with a fixed location on or in the ground, or attached to something having a fixed location to the ground. Structures include, but are not limited to, the following: Site-built buildings, industrialized buildings, modular homes, manufactured homes, mobile homes, billboards, swimming pools, advertising signs, satellite dishes, and fall-out shelters. See also, building.
Subdivider. Any person, firm, corporation or other legal entity who or which divides for sale, rent or lease or develops any land deemed to be a subdivision as herein defined.
Subdivision. All divisions of a tract or parcel of land into two or more lots, buildings, sites, or other divisions for the purpose, whether immediate or future, of sale, legacy, or building development; includes all division of land involving a new public road or a change in existing public roads; includes re-subdivision; and, where appropriate to the context, relates to the process of subdividing or to the land or area subdivided; provided, however, that the following are not included within this definition:
(1) The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards of the municipality.
(2) The division of land into parcels of five acres or more where no new street is involved.
However, this exception shall not apply to land being developed for retail commercial purposes, such as a large shopping center or single retail establishment, or an enclosed mall or other group development which may exceed five acres in size. Such developments are considered subdivisions under this UDC.
Subdivision, minor. The subdivision of an unplatted tract of land into four lots or less, each being in compliance with the requirements of the zoning ordinance and each fronting an existing street with a minimum right-of-way of 50 feet and adequate public utilities. Each lot must meet the minimum requirements of the zoning ordinance for the zoning district in which it is located.
Swimming pool. Any pool, or open tank located either above or below the existing finished grade of a site, not located within a completely enclosed building, and exceeding 150 square feet in surface area and two feet in depth, designed, used or intended to be used for swimming or bathing purposes. A swimming pool does not include reflecting pools, fish ponds, or other types of pools, located and designed so as not to create a hazard or to be used for swimming or wading.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.20. T terms.
Tavern. A commercial establishment whose primary activity is the sale of alcoholic beverages to be consumed on the premises, but also serves prepared food as a secondary activity and meets the definition of a tavern contained in chapter 6 of the Statesboro Code of Ordinances. See also, bar.
Townhouse development. A development containing 50 or more townhouse dwellings, and that may also contain other residential or nonresidential uses, and where no two areas of such development are separated by a collector street or an arterial street.
Trailer park. Any land used or designated to be used as parking space for more than one house trailer, also known as mobile home park.
Trailer. An enclosure used for living, sleeping, business or storage purposes having no foundation other than wheels, blocks, jacks, skids or skirtings and which has been or can be equipped with wheels or other devices for transporting the enclosure from place to place.
Transparent glass. Glass with a transparency higher than 80 percent and external reflectance of less than 15 percent.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.21. U terms.
UDC administrator. The city official authorized by the city manager to administer the portions of this UDC that do not constitute a zoning ordinance within the meaning of O.C.G.A. § 36-66-1, et seq., or their designee.
Use. The purpose which land or a building is arranged, designed or intended, or for which service either land or a building is or may be occupied or maintained.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.22. V terms.
Vape shop. Any business whose principal product line for retail sale is alternative nicotine products or vape juice, or both. For the purposes of this definition, alternative nicotine products refer to any products or devices that employ an electronic heating element, power source, electronic circuit, battery, or other electronic, chemical, or mechanical means to produce a vapor that delivers nicotine to the person inhaling from the device, including electronic cigarettes, electronic cigars, electronic hookahs, electronic bongs and electronic pipes, whether manufactured, distributed, marketed, or sold as an electronic cigarette, electronic cigar, or electronic pipe. For the purposes of this definition, vape juice refers to any liquid that contains compounds containing pharmaceutical grade vegetable glycerin, propylene glycol, nicotine, food-grade flavoring, and water, and can be used for vaping by means of an alternative nicotine product. For purposes of this definition, "principal" means that alternative nicotine products, vape juice, or both constitute at least 25 percent of the business's aggregate retail sales.
Variance. Permission or approval granted by the mayor and city council constituting a modification or a deviation from the exact provisions of this ordinance as applied to the use of a specific piece of property or portion of the same.
Vehicle-related establishments. A category of commercial and office uses that includes businesses involved in the storage, maintenance, repair, and fueling of vehicles include but not limited to service stations and convenience stores; parking lots; junkyards; and automotive and allied sales and services.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.23. W terms.
Warehouse. A facility that provides storage of bulk items for wholesale enterprises. Such a use shall not include the storage or handling of hazardous materials. See also industrial uses, heavy.
Waterfront. Property containing any or all of its lot lines abutting on or contiguous to any body of water including a creek, canal, lake, river or any other body of water, natural or artificial, marshland, not including a swimming pool, whether said lot line is front, rear or side.
Wholesale establishments. A category of commercial and office uses that includes businesses involved in the sale, lease, or rental of new or used products exclusively to industrial, institutional, or commercial enterprises.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.24. X terms.
[Reserved] (Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.25. Y terms.
Yard. An open, unoccupied space on the same lot with a building or other structure or use, open and unobstructed from the ground to the sky, except for public utility lines or facilities.
See Figure 5.2.25-A — Diagram of Yard Types.
Yard, front. A yard extending the full width of the lot along the front street line as defined and extending in depth from the front street line to the nearest point of any structure on the lot. See Figure 5.2.25-A — Diagram of Yard Types.
Yard, rear. A yard extending the full width of the lot along the rear lot line and extending in depth from the rear lot line to the nearest point of any structure on the lot. See Figure 5.2.25-A — Diagram of Yard Types.
Yard, side. A yard extending from the rear of the front yard to the front of the rear yard and extending in width from the side lot line to the nearest point of any structure on the lot.
See Figure 5.2.25-A — Diagram of Yard Types.
Yard, corner side. A side yard on a corner lot extending from the side street line to the nearest point of any structure on the lot. See Figure 5.2.25-A — Diagram of Yard Types.
Figure 5.2.25-A — Diagram of Yard Types (Ord. No. 2023-12, § 1(Exh. A), 9-19-23) Sec. 5.2.26. Z terms.
Zoning administrator. The city official authorized by the city manager to administer the portions of this UDC that constitute a zoning ordinance within the meaning of O.C.G.A.
§ 36-66-1 et seq., or their designee.
Zoning district, residential, or residential district. A collective reference to the R-2, R-3, R-4, R-6, R-15, and R-40 districts.
Zoning map. The zoning map of the City of Statesboro.
Zoning ordinance. The portions of this UDC that constitute a zoning ordinance within the meaning of O.C.G.A. § 36-66-1 et seq.
(Ord. No. 2023-12, § 1(Exh. A), 9-19-23)
APPENDIX B
RESERVED*
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.