(m)Topography and grading. Existing contour lines based on sea level datum shall be drawn at intervals of not more than two (2) feet and shall include the entire site and all abutting public streets. Contour lines shall be based on field surveys or photogrammetric methods from aerial photographs. The basis for the topographic contour shown shall be specified and dated. Grading plans shall show proposed contours. Grading shall be performed in accordance with the lines and grades indicated on the approved grading plan.
(n) Natural features within the proposed development. These include drainage channels, bodies of water, and other known significant features such as extensive exposed rock. On all water courses the direction of flow shall be indicated. The 100-year floodplain shall be delineated and the source of the depicted floodplain information shall be indicated (i.e., reference to map panel numbers and dates). The acreage or area in square feet within the floodplain shall be indicated. See Article 11 of this UDC for additional requirements when development is proposed to be located in a floodplain or flood hazard area.
(o) Man-made features. These include those features existing within and adjacent to the proposed development including existing right-of-way width and pavement widths of adjoining streets, street names, the location and dimensions of existing bridges, easements (all purposes), culverts and other drainage facilities, water, sewer, and other existing utility lines and structures, the names of jurisdiction lines; existing structures on the site and their disposition, and other appropriate built-environment information.
(p) Trees, buffers, landscaping. If buffers or other landscaping or screening treatments are required, show the location, size, and type (natural or planted) on the plans conforming to the requirements of this UDC, as applicable.
(q) Utilities and other easements. Easements for water and sanitary sewer as may be required by the utility provider with jurisdiction.
(r) Standard drawings. The zoning administrator may require that the development plans include standard drawings if adopted by the city, or a standard drawing of any utility provider with jurisdiction over the development project. Where no standard drawing is available but is needed as determined by the zoning administrator, the applicant’s engineer or designer shall provide any such standard drawing requested.
(s) Signature blocks. The zoning administrator may require signature blocks with pertinent information to be signed by the owner/developer, the plan preparer, a utility provider, an external agency, and approval block for signature by the zoning administrator.
(t) Additional information. Other information as may be specified by the zoning administrator, as may be necessary to review the development plan and ensure compliance with this UDC.
Sec. 7-108. Completeness check.
(a) The application shall be checked for completeness within 10 calendar days of submission. Incomplete applications will not be processed.
(b) If all documents and plans are not submitted, the development plan application will not be reviewed.
(c) The zoning administrator will notify the applicant of any deficiencies and will advise the applicant on what is needed to complete the application and initiate review.
Sec. 7-109. External reviews of development plans.
The applicant shall be responsible for obtaining approvals from all other agencies with regulatory jurisdiction over the project. Accordingly, the applicant may be required by the zoning administrator to secure development approval from other agencies with regulatory jurisdiction. Plans shall be submitted by the applicant to these external agencies, for comments and approvals (the zoning administrator is not responsible for that function). Approval by the external agency is to be communicated to the zoning administrator. The applicant shall work directly with each external agency as necessary to resolve all issues to receive that agency’s approval.
(a) Environmental Protection Division or Soil and Water Conservation District.
Development plans which include a land disturbance permit application require the review of soil erosion and sedimentation control plans by either the Environmental Protection Division or the Soil and Water Conservation District (see Article 8 of this UDC). Such reviews are coordinated by the zoning administrator.
(b) Georgia Department of Transportation. If the development is on a state highway, also make application directly to the Georgia Department of Transportation district office with jurisdiction, following that agency’s procedures for driveways and encroachments.
(c) Environmental health. If the development is to be served by on-site sewage disposal system, also make application directly to the Barrow County Environmental Health Department following that agency’s procedures
(d) Non-city utility provider. If the development is served by a utility provider other than the city, also make application directly to that agency following that agency’s procedures.
The zoning administrator is not responsible for delays in approval of development plans when a development permit applicant is required to be approved by an external agency but has not obtained approval from that external agency with jurisdiction over the development proposal.
Sec. 7-110. Development permit application processing.
(a) Administrative procedures. The zoning administrator is authorized to establish and modify administrative procedures regarding the development plan review administrative process to provide for expeditious decision making and to ensure fairness in the process.
(b) Time frame. Decisions on development permits shall be issued by the zoning administrator within 40 calendar days of the city’s notice of plan application completeness. This time period contemplates an applicant simultaneously completes external agency permitting processes.
(c) Criteria for decisions on development permit applications. The zoning administrator shall review the application for compliance with the following criteria, which shall not be limiting:
1. Development code and zoning conditions. Development plans must be consistent with all applicable articles and sections of this UDC, and any conditions of zoning, special use, or variance approval, if applicable.
2. Previously approved plats and plans. When property to be developed is included on an approved final plat, master plan, or other plan approved by the city, development plans shall be in substantial accordance with said plat or plan as determined by the zoning administrator. Significant departures from any such requirements may require the resubmission of plat, master plan, or other plan previously approved, as determined by the zoning administrator.
3. Usability or variance. The zoning administrator may not approve any development permit application or plan that shows a lot or situation that would clearly require a variance in order to be reasonably usable, whether due to the presence of flood plain, unusual configuration, zoning compliance, lack of public utilities, or for any other reason.
(d) Noncompliance. If the development permit application and plans are found to not comply with the requirements of this UDC, the zoning administrator shall indicate on the drawing or in writing all comments related to lack of compliance with this UDC. The zoning administrator shall deny or withhold approval of the development permit application in cases where the proposed development does not meet the requirements of this UDC or the comments of any other internal or external agency with jurisdiction to review the development permit application.
(e) Revisions. Development plan applications shall be revised and resubmitted to accommodate the comments by review agencies and those issued to the applicant by the zoning administrator. If revisions are not resubmitted within a time frame specified by the zoning administrator, the application will be denied. Plan drawings that are submitted for revision must specifically identify those areas that are to be considered for review and approval. The revisions shall be noted in tabular form in a revision block on the plan drawings.
(f) Compliance and approval. When the zoning administrator has determined that the development permit application complies with the requirements of this UDC, it will be approved.
Sec. 7-111. Pre-construction meeting and acknowledgment memorandum.
When development plan sets have been approved, the zoning administrator shall provide his/her signature, and retain two sets and return two sets to the applicant. The property owner may be required to sign a pre-construction memorandum acknowledging receipt of approved development plans and responsibilities of the property owner and applicant, including but not limited to calls for development inspections.
Sec. 7-112. Permit issuance and posting.
When a development permit is issued, it shall be assigned a number by the zoning administrator, and the applicant shall be supplied a development permit which must be posted on the development site prior to commencement of any land disturbing activity. The development permit shall be posted in a conspicuous place so that they will be visible from the roadway providingfrontage.
Sec. 7-113. Duration of development permit.
(a) Expiration. A development permit shall remain in effect for a period of six consecutive months after which time the permit and plans will become null and void and a new permit will be required if no development activity has begun and has been diligently pursued.
(b) Suspension or revocation. A development permit may be suspended, revoked or modified, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this
UDC.
Sec. 7-114. Development inspections.
Inspections are required for each of the following phases, as applicable to the actual work to be performed under the development permit:
(a) Erosion and sedimentation control. Required erosion and sedimentation control measures must be installed in accordance with the approved soil erosion and sedimentation control plan prior to any development activity and as development progresses. Prior to clearing or clearing and grubbing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas shall be required. Inspection of erosion and sedimentation control measures will be conducted on a continuing basis.
(b) Stormwater facilities. Construction of the stormwater system shall be initiated as part of the grading of the site. Storm water detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate. Upon installation of storm drainage pipe, detention, or other storm water facilities, inspection and approval shall be required prior to continuation with subgrade preparation.
(c) Grading. Upon completion of street grading, if applicable, inspection and approval shall be required prior to trenching or continuation with subgrade preparation.
(d) Street curbing and gutter (if provided). After grading is completed and approved, the curb lines shall be staked by the developer’s registered land surveyor. Inspection shall be requested after the subgrade is compacted and forms or string line have been set. Street width and vertical and horizontal alignment may be spot checked.
(e) Sub-grade of streets. After the earth work has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans. If any sections of the subgrade are composed of unsuitable or unstable material, such material shall be removed to the depth directed by the Inspector and replaced with suitable, thoroughly compacted material. Prior to placement of the street base, the subgrade shall be compacted to 95% density. Testing for sub-grade compaction will be required, including two tests at each sanitary sewer manhole.
(f) Utilities. Before any street base is applied, all of the underground utilities—water mains, sewer mains, gas mains, or any other underground utilities, and all service connections related thereto, that will be located under the street base shall be installed completely and provided throughout the length of the street and across the flat section. If a public water system is to be installed, the improvements are to be reviewed, approved and inspected by the water provider.
(g) Street base. The base shall be string-lined for depth and crown. The street base shall be roll-tested with an 18-ton tandem dump truck and shall pass to the satisfaction of the Inspector. When testing is required by the Inspector, it is the responsibility of the developer to ensure that all required tests are made and reported to the Inspector. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories. If deemed necessary by the inspector, additional tests will be required.
(h) Paving. The inspector shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be monitored and the street will be cored after completion to check thickness and density. Satisfactory test results of the cores shall be delivered to the zoning administrator and utility provider (where utilities are involved) prior to approval of a final subdivision plat if applicable.
(i) Tree protection and landscaping. Inspections for tree protection measures and the installation of landscaping.
(j) Final. A final inspection of the development, once complete, shall be required.
Sec. 7-115. Field changes.
(a) After issuance of a development permit, if changes are desired or made necessary as a result of field conditions, the design engineer must contact the zoning administrator to coordinate the review and approval of the requested revision.
(b) All field changes shall be documented as revisions to the approved development plans and correctly shown on as-built surveys.
(c) Discrepancies between as-built surveys and approved development plans may result in delays in approving final plats, building permits or certificates of occupancy.
Sec. 7-116. Reference to specifications.
Where this UDC establishes specifications to be followed, said specifications shall be met, where applicable. The following regulations and manuals are hereby adopted (as may be amended from time to time), and development shall be consistent with them, as applicable, unless otherwise approved by the zoning administrator.
(a) On-site sewage management. Georgia Department of Public Health, Environmental Health Section, Manual for On-site Sewage Management Systems, revised January 2016.
(b) Soil erosion control. Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission.
(c) Stormwater management. Georgia Stormwater Management Manual: Volume 1: Local Government Guide (2016 Editions); Volume 2: Technical Handbook (2016 Edition); and Volume 3; Pollution Prevention Guidebook (2012).
(d) Surveys. Georgia Administrative Code Department 180, State Board of Registration for Professional Engineers and Land Surveyors, Chapter 180-7, Technical Standards for Property Surveys.
(e) Access management. Georgia Department of Transportation Regulations for Driveway and Encroachment Control, Revision 4.0, dated March 15, 2016.
(f) Utility encroachment. “Utility Accommodation Policy and Standards,” promulgated and published by the Georgia Department of Transportation Division of Operations, Office of Utilities, dated 2016, and as may be amended from time to time.
(g) Traffic control. Manual on Uniform Traffic Control Devices, latest edition, published by the Federal Highway Administration of the U.S. Department of Transportation.
(h) Landscaping. ANSI 300 Standards: The generally accepted (consensus) industry standards for tree care practices, developed by the Tree Care Industry Association and written by a committee called the Accredited Standards Committee A300. These standards are based on current research and sound practice for writing specifications to manage trees, shrubs, and other woody plants.
Sec. 7-117. Disclaimers.
(a) No transfer of responsibility. Approval of development plans by the city shall not imply or transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional, corporation or individual under whose hand or supervision the development plans were prepared. The completion of inspections and authorization for work continuation shall not transfer responsibility for the quality of the work performed or materials used from the owner, nor imply or transfer acceptance of responsibility for project design or engineering from the professional, corporation or individual under whose hand or supervision the development plans were prepared.
(b) No waiver of compliance. No development permit issued by the zoning administrator shall be interpreted to relieve any owner of the responsibility of maintaining full compliance with all applicable codes, ordinances and other regulations. Any development permit issued in error or in contradiction to the provisions of this UDC shall be considered to have been null and void upon its issuance.
(c) No liability for damage. The approval of plans under the provisions of this article and the issuance of a development permit shall not relieve any person from the responsibility for damage to any person or property otherwise imposed by law, nor shall such plan approval or development permit issuance impose any liability upon the city for damage to any person or property.
Sec. 7-118. As-built plans.
Upon completion of the project, if required by the zoning administrator, the applicant or other responsible party shall submit as-built plans of the project in electronic format.
Sec. 7-201. Generally.
No land development or development permit shall be approved by the zoning administrator until all improvements, if required by this article or UDC generally, have been constructed or installed in a satisfactory manner and approved by the zoning administrator and public utility provider as applicable.
Sec. 7-202. Water generally.
(a) All habitable buildings shall be connected to a water system capable of providing water for health and emergency purposes, including adequate fire protection.
(b) No building permit shall be issued for any building within a subdivision, or for the development of land, if there is not present to the lot in question or to the land development an adequate water supply.
Sec. 7-203. Water mains.
(a) When a public water main is accessible, the subdivider or land developer shall install water supply facilities, including fire hydrants, that meet or exceed the specifications of the city. Water mains within subdivisions and land developments must be provided with connections to each lot in the subdivision and each land development.
(b) The size of water mains shall be justified by hydraulic analysis performed by a professional engineer.
(c) Easements shall be provided for water mains, and such easements shall be at least 10 feet wide.
Sec. 7-204. Well water.
(a) If a municipal or other public water supply is not available to the subdivision or land development at the time of constructing improvements for a subdivision or land development, then the subdivider or developer shall provide an adequate alternative water source and an adequate water storage facility.
(b) In subdivisions or land developments with a residential density of one unit per acre or less and when a public water system is not available, individual wells may be used in a manner so that an adequate supply of potable water will be available to every lot in the subdivision or to the land development.
(c) When individual wells are proposed to be used for water supply, water samples shall be submitted to, and individual wells shall be approved by, the Barrow County Environmental Health Department. Approvals shall be submitted to zoning administrator prior to final subdivision plat for a subdivision or development permit approval for a land development.
Sec. 7-205. Community water system.
(a) If a municipal or other public water supply is not available to the subdivision or land development at the time of constructing improvements for a subdivision or land development, then the subdivider or developer shall provide an adequate alternative water source and an adequate water storage facility.
(b) Any community water system, if permitted, shall provide a minimum flow of 400 gallons per day per each lot platted, whether or not each lot is to be immediately developed; shall be sanitary; and shall have a minimum pressure of 20 pounds per square inch at each lot in the subdivision or each land development to be served. For all common non-public water supply systems, acceptable management, maintenance, and distribution policies and procedures shall be established. These policies and procedures shall be required to guarantee the provision of adequate supplies to each perspective lot owner on a continuing, ongoing basis, and to provide acceptable means for repairs and unforeseen events.
(c) The community water system plan shall be approved by the Barrow County Environmental Health Department and a letter of approval from the Georgia Department of Natural Resources shall accompany the final plat or land development application.
Sec. 7-206. Fire hydrants.
(a) Fire hydrants shall be required for all nonresidential land developments and all subdivisions except those permitted to be served by individual on-site wells. Fire hydrants with appropriate water pressure at appropriate intervals throughout the subdivision or land development shall be provided by the subdivider or land developer as required by the fire department or fire service district with jurisdiction.
(b) The location and construction of fire hydrants shall be in accordance with city standard specifications.
(c) To eliminate future street cuts, all underground utilities for fire hydrants, together with the fire hydrants themselves, and all other supply improvements shall be installed before any final paving of a street within the right-of-way shared by such underground utilities.
Sec. 7-207. Wastewater generally.
(a) All habitable buildings and buildable lots shall be served by an approved means of wastewater collection and treatment. Each subdivision and land development shall be served by adequate sewage disposal facilities.
(b) No building permit shall be issued for any building within a subdivision or for the development of land, if there is not present throughout the subdivision or to the land development an adequate system of wastewater collection and treatment.
Sec. 7-208. Connection to public sewerage system.
(a) When a public sanitary sewerage system is reasonably accessible, as determined by the city engineer, the subdivider or land developer shall connect with same and provide sewers accessible to each lot in the subdivision or to each land development. If a public sanitary sewer is reasonably accessible, it shall be unlawful to connect any new habitable building upon any such property to an individual sewage disposal system.
(b) When a public sanitary sewerage system is not immediately accessible but is anticipated to be available within a period of three years, the applicant shall install sanitary sewer lines, laterals, and mains from the street curb to a point in the subdivision or land development boundary so that a future connection with the public sewer main can be made. The zoning administrator may condition the approval of a subdivision or may require as a condition of land development approval on submission of an agreement to connect to the public sewerage system upon its availability.
(c) Design and engineering of sanitary sewers shall be in accordance with the city specifications. Sanitary sewers shall be located within street or alley rights-of-way unless topography dictates otherwise.
(d) When located outside a right of way, easements shall be provided for sanitary sewer lines, and such easements shall be at least 20 feet wide.
Sec. 7-209. Alternative wastewater systems.
If sanitary sewer is not reasonably available at the time of the development of the subdivision or land development, and if sanitary sewer is not anticipated to be available within a period of three years to serve the subdivision or land development in question, then on-site septic tanks, an oxidation pond, or another method of treatment of sanitary sewerage may be approved and shall be installed by and at the expense of the subdivider, land developer, or lot purchaser, in conformity with the requirements of the Barrow County Environmental Health Department.
Sec. 7-210. Septic tank.
Where individual onsite wastewater disposal systems are proposed and allowed, individual lot sizes and widths must exhibit appropriate regard for the peculiar health, drainage, and maintenance characteristics on the site. Additionally, detailed soil tests may be required in order to verify the ability of the lots to safely contain and dispose of septic system effluent. All septic tanks and onsite wastewater disposal systems are subject to the approval of the Barrow County Environmental Health Department.
Sec. 7-211. Oversizing of water and sewer mains.
The subdivider or land developer shall construct such oversized water and sanitary sewer improvements that the utility provider or city determines necessary, provided that the subdivider or land developer shall not be obligated for the additional cost of such improvements that are not uniquely required for that subdivision or land development, and provided the subdivider or land developer agrees to a proposal by the city to share in the cost arrangements for over-sizing such improvements. A formula may be developed by the city engineer to provide for a sharing of the cost of such improvements needed to serve the subdivision or land development when certain of the improvements are necessary to serve future subdivisions or land developments in the vicinity.
Sec. 7-212. Drainage.
(a) An adequate drainage system, separate and independent of any sanitary sewer system and including any necessary ditches, pipes, culverts, intersectional drains, drop inlets, etc., shall be provided for the proper drainage of all surface water for all subdivisions and land developments.
(b) Sizing and location of all drainage structures shall be the responsibility of a registered professional engineer or land surveyor, and construction shall be in accordance with the specifications of the city or utility provider with jurisdiction.
(c) The city may require the use of on-site control methods such as retention or detention to mitigate the stormwater and drainage impacts of a proposed subdivisions or land development. The zoning administrator shall not approve any preliminary plat of a subdivision or construction plans for any land development that does not make adequate provision for storm and floodwater runoff.
(d) No building permit shall be issued for any building within a subdivision or for the development of land, if there is not present throughout the subdivision or land development an adequate system of drainage and stormwater management.
(e) When located outside a right of way, easements shall be provided for drainage, and such easements shall be at least 20 feet wide.
Sec. 7-213. Gas, electric and other utilities.
(a) All utility facilities, including but not limited to gas, electric power, telephone, cable television, and broadband shall be located underground throughout the subdivision or land development. Whenever existing utility facilities are located above ground, except when existing on public roads and rights-of-way, they shall be removed and placed underground.
(b) Easements shall be provided for utilities, private and public, and such easements shall be at least 10 feet wide.
Sec. 7-302. Utility encroachment permit procedure.
Sec. 7-308. Utility accommodation policy and standards.
Sec. 7-301. Utility encroachment permit required.
(a) It shall be unlawful for any utility to excavate or to construct, install, maintain, renew, remove or relocate facilities in, on, along, over or under the public rights of way of the city without a utility encroachment permit from the city engineer in accordance with the terms of this article. The zoning administrator shall have an administrative role in assisting the city with processing utility encroachment permit applications.
(b) The requirement to obtain a utility encroachment permit may be waived by the zoning administrator in cases where utility work contemplated within the public rights of way of the city is shown on construction plans for a private development that has been reviewed and approved by the zoning administrator and a development permit has been issued in accordance with applicable provisions of this UDC.
(c) This section shall not be construed as requiring a separate utility encroachment permit for a driveway or for installation of a storm drainage culvert if such driveway or storm drainage culvert is authorized by the zoning administrator under a separate permit or authorization pursuant to this UDC.
Sec. 8-702. Utility encroachment permit procedure.
Utility encroachment permits shall be obtained from the zoning administrator upon application made on forms prescribed by the zoning administrator and city engineer. The written application shall include the following:
(a) The name and address of the utility;
(b) The nature, extent, and location of any work proposed to be done, along with satisfactory plans as attachments showing in detail the location of the proposed facility or operations as described in the permit application. The plans shall show the size or capacity of facilities to be installed; their relationship to street features such as right-of-way lines, pavement edge, structures, etc., horizontal and vertical clearance to critical elements of the roadway and any other information necessary by the city engineer to evaluate the impact on the street and its operation;
(c) The name and address of the person or firm who is to do such work;
(d) The name, street address, email address if applicable and telephone and facsimile numbers of one or more facilities representative(s).
(e) The projected starting and finishing dates for the work;
(f) An indemnity bond or other acceptable security in an amount to be set by the city to pay any damages to any part of the city road system or other city property or to any city employee or member of the public caused by activity or work of the utility performed under authority of the permit issued;
(g) A copy, if requested, of the registrant’s certificate of authority (or other acceptable evidence of authority to operate) from the Georgia Public Service Commission and/or the FCC and any other similar approvals, permits, or agreements;
(h) A copy, if requested, of the service agreement, if applicable or other legal instrument that authorizes the utility to use or occupy the right of way for the purpose described in the application;
(i) The application shall be accompanied by a permit review fee, as established by the master fee schedule of the city.
Sec. 7-303. Incomplete permit application.
If a permit application is incomplete, the zoning administrator shall notify the applicant and shall provide a reasonable period of time in which to revise the application.
Sec. 7-304. Permit review and decision.
(a) Unless the permit application is extraordinarily complicated and extensive, in which case more time may be taken, the zoning administrator shall have 30 calendar days from the posted application submission deadline to review (including distribution to the city engineer) the permit application for compliance with the requirements of this division and to evaluate the application in terms of the impact of work proposed in the permit with regard to the following: impacts on safety, visual quality of streets, traffic flow, other users of the right of way; and the difficulty and length of time of the project.
(b) The zoning administrator shall issue the requested permit if there are no concerns with regard to the criteria of this division. The zoning administrator or city engineer may place conditions of approval on any permit issued. If there are concerns with issuing the requested permit, the zoning administrator shall indicate those concerns or objections in writing to the applicant and deny the requested permit.
(c) Any applicant aggrieved of a decision of the to deny a utility encroachment permit under the provisions of this division may file in writing and sent via certified mail an appeal with the zoning administrator, who shall schedule the appeal in accordance with procedures of this UDC for appeal of administrative decisions.
Sec. 7-305. Permit commencement, expiration and extension.
(a) Each permit issued by the city engineer (via the zoning administrator) shall have a set commencement and expiration date based on information provided in the applicant’s permit application. When the construction under any permit is completed, the utility shall notify the city engineer and zoning administrator. The permit shall remain in place until construction or activity authorized under the permit is completed or until its expiration date unless the utility is in default.
(b) If work is not begun within six months of the date of permit issuance, the permit will automatically expire.
(c) The zoning administrator is authorized but shall not be obligated to grant an extension to a permit prior to expiration, upon application, and provided that a permit review fee required for a permit application is paid.
Sec. 7-306. Permit default.
The zoning administrator may find a utility in default and give written notice of default to a utility if it is determined that a utility has:
(a) Violated any provision, requirement, or condition of a utility encroachment permit, or any law of the city,, county, state, or federal government;
(b) Attempted to evade any provision or requirement of this division;
(c) Practiced any fraud or deceit upon the city; or
(d) Made a material misrepresentation or omission of fact in its permit application.
Sec. 7-307. Termination of permit.
If a utility fails to cure a default within 20 calendar days after such notice is provided to the utility by the city, then such default shall be a material breach and the city may exercise any remedies or rights it has at law or in equity to terminate the permit. If the zoning administrator decides there is cause or reason to terminate, the following procedure shall be followed:
(a) The zoning administrator shall serve a utility with a written notice of the reason or cause for proposed termination and shall allow a utility a minimum of 20 calendar days to cure its breach; and
(b) If the utility fails to cure within 20 calendar days, the city may declare the permit terminated.
Sec. 8-708. Utility accommodation policy and standards.
(a) The document known as “utility accommodation policy and standards,” promulgated and published by the Georgia Department of Transportation Division of Operations, Office of Utilities, dated 2016, and as may be amended from time to time, is hereby adopted in its entirety as if fully set forth in this division, as minimum required standards.
(b) A copy of the “utility accommodation policy and standards” shall be maintained by the city clerk and shall be available for public inspection.
(c) References in the “utility accommodation policy and standards” to state personnel, agencies, and fees shall be interpreted, where required, as meaning the City of Statham equivalents.
(d) Any conflicts between the provisions of this division and the “utility accommodation policy and standards” shall be resolved in favor of the “utility accommodation policy and standards.”
DIVISION I GENERAL PROVISIONS
DIVISION II MINIMUM REQUIREMENTS/BEST MANAGEMENT PRACTICES
DIVISION III APPLICATION AND PERMIT PROCESS
DIVISION IV INSPECTION AND ENFORCEMENT
DIVISION V. EDUCATION AND CERTIFICATION
DIVISION VI. LEGAL STATUS PROVISIONS
DIVISION I
GENERAL PROVISIONS
Sec. 8-101. Title.
Sec. 8-801. Title.
This article shall be known as “The City of Statham Soil Erosion, Sedimentation and Pollution Control Ordinance.”
Sec. 8-102. Definitions.
The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:
Best Management Practices (BMPs): These practices include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation which are consistent with, and no less stringent than, those practices contained in the “Manual for Erosion and Sediment Control in Georgia” published by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
Board: The State of Georgia Board of Natural Resources.
Buffer: The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel: A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission: The Georgia Soil and Water Conservation Commission (GSWCC).
CPESC: Certified Professional in Erosion and Sediment Control with current certification by Certified Professional in Erosion and Sediment Control Inc., which is also referred to as CPESC or CPESC, Inc.
Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface; also known as excavation.
Department: The State of Georgia Department of Natural Resources (DNR).
Design professional: A professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by EnviroCert, Inc. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.
Director: The Director of the State of Georgia Environmental Protection Division of the Department of Natural Resources, or an authorized representative.
District: The Soil and Water Conservation District with jurisdiction.
Division: The Environmental Protection Division (EPD) of the State of Georgia Department of Natural Resources.
Drainage structure: A device composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for storm water management, drainage control, or flood control purposes.
Erosion: The process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, sedimentation and pollution control plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. Chapter 12-7, that includes, as a minimum protections at least as stringent as the State General Permit, best management practices, and requirements of this article.
Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.
Final stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the Plan (uniformly covered with landscaping materials in planned landscaped areas) or equivalent permanent stabilization measures as defined in the Manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.
Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading: Altering the shape of ground surfaces to a predetermined condition, including stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
Ground elevation: The original elevation of the ground surface prior to cutting or filling.
Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in this article.
Larger common plan of development or sale: A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, “plan” means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority: The governing authority of any county or municipality which is certified pursuant to subsection (a) O.C.G.A. 12-7-8. The City of Statham is not a local issuing authority.
Natural ground surface: The ground surface in its original state before any grading, excavation or filling.
Nephelometric Turbidity Units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
NOI: A notice of intent form provided by the Environmental Protection Division for coverage under the state general permit.
NOT: A notice of termination form provided by the Environmental Protection Division to terminate coverage under the State General Permit.
Operator: The party or parties that have: (A) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications;
or (B) day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall: The location where storm water in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.
Permit: The authorization necessary to conduct a land-disturbing activity under the provisions of this article or UDC.
Person: Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
Phase or phased: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
Project: The entire proposed development project, regardless of the size of the area of land to be disturbed.
Properly designed: Designed in accordance with the design requirements and specifications contained in the “Manual for Erosion and Sediment Control in Georgia” (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the Manual as approved by the Commission up until the date of Notice of Intent (NOI) submittal.
Roadway drainage structure: A device such as a bridge, culvert, or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment: Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation: The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.
Soil and Water Conservation District approved plan: An erosion, sedimentation and pollution control plan approved in writing by the Soil and Water Conservation District with jurisdiction.
Stabilization: The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
State General Permit: The National Pollution Discharge Elimination System (NPDES) general permit or permits for storm water runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state’s authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., and subsection (f) of Code Section 12-5-30.
State waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices: Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication, Manual for Erosion and Sediment Control in Georgia.
Vegetative erosion and sedimentation control measures: Measures for stabilization of erodible or sediment-producing areas by covering the soil using one of the following approaches: (a) Permanent seeding, sprigging or planting, producing long-term vegetative cover, or (b) Temporary seeding, producing short-term vegetative cover; or (c) Sodding, covering areas with a turf of perennial sod-forming grass. Such measures may be found in the publication, Manual for Erosion and Sediment Control in Georgia.
Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Wetlands: Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
Sec. 8-103. Applicability.
This article shall apply to all property within the corporate limits of the City of Statham.
Sec. 8-104. Exemptions.
This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
(a) Surface mining, as the same is defined in O.C.G.A. 12-4-72, “The Georgia Surface Mining Act of 1968;”
(b) Granite quarrying and land clearing for such quarrying;
(c) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
(d) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A. 12-7-6 and this article;
(e) Agricultural operations as defined in O.C.G.A. 1-3-3, “definitions”, to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys;
producing plants, trees, fowl, or animals; the production of aquaculture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;
(f) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in this article, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
(g) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;
(h) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, “state waters” excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by this article;
(i) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Department of Transportation or the State Road and Tollway Authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. 12-7-7.1; except where the Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the Local Issuing Authority, the Local Issuing Authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
(j) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. 36- 18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. 36- 18-1, or any agency or instrumentality of the United states engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the Local Issuing Authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
(k) Any public water system reservoir.
DIVISION II
MINIMUM REQUIREMENTS/BEST MANAGEMENT PRACTICES
Sec. 8-201. General Requirements.
(a) Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES General Permit are not met.
Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans.
(b) Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of this article. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this ordinance and the NPDES General Permit.
(c) Best management practices as set forth in this article shall be required for all landdisturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with this article or any substantially similar terms contained in a permit for the discharge of storm water issued pursuant to subsection (f) of O.C.G.A.
12-5-30, the “Georgia Water Quality Control Act.” As used in this article, the terms “proper design” and “properly designed” mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. 12-7-6 subsection (b).
(d) A discharge of storm water runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the Division pursuant to subsection (f) of O.C.G.A. 12-5-30, the “Georgia Water Quality Control Act”, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than 5 acres.
(e) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the Division pursuant to subsection (f) of Code Section 12- 5-30, the “Georgia Water Quality Control Act”, for each day on which such failure occurs.
(f) The director may require, in accordance with regulations adopted by the Board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.
Sec. 8-202. Adherence to erosion control manual and additional requirements.
The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.12-7-1 et. seq.
for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
(a) Stripping of vegetation, re-grading and other development activities shall be conducted in a manner so as to minimize erosion;
(b) Cut-fill operations must be kept to a minimum;
(c) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;
(d) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(e) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(f) Disturbed soil shall be stabilized as quickly as practicable;
(g) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(h) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(i) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. 12-7-1 et. seq.;
(j) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(k) Cuts and fills may not endanger adjoining property;
(l) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(m)Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
(n) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in this article.
(o) There is established a 25 foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the Director pursuant to O.C.G.A. 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream:
that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the “Georgia Water Quality Control Act”, shall remain in force unless a variance is granted by the Director as provided in this paragraph. The following requirements shall apply to any such buffer:
1. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
2. The buffer shall not apply to stream crossings for water lines or sewer lines, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented.
Sec. 8-203. Injury not proof of violation.
The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this article or the terms of the permit.
Sec. 8-301. General.
The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
Sec. 8-302. Permit application requirements.
No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the City of Statham without first obtaining a permit from the City of Statham to perform such activity and providing a copy of Notice of Intent (NOI) submitted to EPD, if applicable. The following permit applications procedures are hereby established and shall control processing and issuance of permits under this article:
(a) Plan and data. The application for a permit shall be submitted to the City of Statham and must include the applicant’s erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in this article. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land disturbing activity proposed will be carried out in such a manner that the provisions of this article will be met.
Applications for a permit will not be accepted unless accompanied by four copies of the applicant’s erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7 .10.
(b) Fees. In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. 12-5-23, provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of landdisturbing activity included in the planned development or each phase of development.
All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to subsection (a) of O.C.G.A. 12-7-8 half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to paragraph (9) or (10) of O.C.G.A. 12- 7-17 shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
(c) District review of plans. Following receipt of an application and plan for a permit and following completion of local review for compliance, the local issuing authority shall refer the application and plan to the District for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. [note:
at this time Statham is not a local issuing authority and so the review by Georgia Environmental Protection Division has jurisdiction rather than the district]. The district shall approve or deny a plan within 35 calendar days of receipt. Failure of the district to act within 35 calendar days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by this article have been obtained, all fees have been paid, and bonding, if required per this article, have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 calendar days of receipt.
Failure of the local issuing authority with plan review authority to act within 35 calendar days shall be considered an approval of the revised plan submittal.
(d) Denial for violations. If a permit applicant has had two or more violations of previous permits, this article, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.
(e) Bond. The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
Sec. 8-303. Plan requirements.
All erosion, sedimentation and pollution control plans shall comply with the following requirements:
(a) Plans must be prepared to meet the minimum requirements of this article, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article.
(b) The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and storm water management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional.
(c) Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the Stakeholder Advisory Board created pursuant to O.C.G.A. 12-7-20.
(d) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the land-disturbing activity was permitted.
Sec. 8-304. Permits.
Permits shall be issued or denied as soon as practicable but in any event not later than 45 calendar days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.
(a) Permit requires plan approval. No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required are obtained, bonding requirements, if necessary, are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(b) Land disturbance consistent with this article. Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons, and the division shall enforce such requirements upon the local issuing authority.
(c) Phasing. If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(d) Suspension, revocation, or modification of permit. The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
(e) Rejection for prior violations. The local issuing authority may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. 12-7-7 (f) (1).
DIVISION IV
INSPECTION AND ENFORCEMENT
Sec. 8-401. Inspections.
(a) Inspections and regulation of permittees. The city will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit.
(b) Permitee responsibilities. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities.
(c) Notice to comply for non-compliance. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.
Sec. 8-402. Required amendment to this article.
The local issuing authority shall amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
Sec. 8-403. Investigations.
The city shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
Sec. 8-404. No refusal of access.
No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
Sec. 8-405. Review of actions.
(a) Review by district or commission. The district or the commission or both shall semiannually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. 12-7-8 (a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county’s or municipality’s erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
(b) Review of local issuing authority actions. The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to Code Section 12-7-8 (a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority’s ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. 12-7-8 (a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. 12-7-7 (e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any municipality so notified shall have 90 calendar days within which to take the necessary corrective action to retain certification as a local issuing authority. If the municipality does not take necessary corrective action within 90 calendar days after notification by the division, the division shall revoke the certification of the municipality as a local issuing authority.
Sec. 8-406. Failure to obtain a permit for land-disturbing activity.
If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
Sec. 8-407. Stop work orders.
For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five business days to correct the violation. If the violation is not corrected within five business days, the director or the local issuing authority shall issue a stop-work order requiring that landdisturbing activities be stopped until necessary corrective action or mitigation has occurred;
provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning.
(a) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and
(b) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(c) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
Sec. 8-408. Bond forfeiture.
If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of this article. The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
Sec. 8-409. Monetary penalties.
Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Each day during which a violation, or failure or refusal to comply continues, shall be a separate violation.
DIVISION V
EDUCATION AND CERTIFICATION
Sec. 8-501. Education and training certification requirements.
Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. 12-7-20.
Sec. 8-502. On-site responsibility.
(a) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
(b) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.
(c) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of paragraph (1) of subsection (b) of O.C.G.A.
12-7-19, then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in paragraph (4) of subsection (b) of O.C.G.A 12-7-19 and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
DIVISION VI
LEGAL STATUS PROVISIONS
Sec. 8-603. Effective date.
Sec. 8-601. Administrative remedies.
The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the Statham City Council within 30 calendar days after receipt by the local issuing authority of written notice of appeal.
Sec. 8-602. Judicial review.
Any person, aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal de novo to the Superior Court of Barrow County.
Sec. 8-604. Validity.
Should any section, paragraph, clause, phrase, or provision of this article be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article or development code.
Sec. 8-605. Liability.
(a) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or District for damage to any person or property.
(b) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(c) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any Waters of the State as defined thereby.
DIVISION I BUFFERS
DIVISION II TREE PROTECTION
DIVISION III LANDSCAPING
DIVISION I
BUFFERS
Sec. 9-101. Reference to requirements.
(a) Zoning buffers. Article 2, Table 2-2 of this UDC establishes minimum buffer widths between certain zoning districts, which vary by zoning district.
(b) Stream buffers. Stream buffers are established in Article 8 of this UDC. Article 4 of this UDC establishes water supply watershed protection districts which require stream buffers.
Sec. 9-102. Definitions.
ANSI 300 Standards: The generally accepted (consensus) industry standards for tree care practices, developed by the Tree Care Industry Association and written by a committee called the Accredited Standards Committee A300. These standards are based on current research and sound practice for writing specifications to manage trees, shrubs, and other woody plants.
Caliper: The diameter of a tree (usually nursery stock) measured at a point 6 inches above the ground or top of root ball for up to and including 4-inch caliper trees, and at a point 12 inches above the ground or top of root ball for larger sizes. For purposes of measuring tree density of existing trees, caliper is measured 4 feet above the ground.
Deciduous: A perennial plant with foliage that is cast off annually.
Drip line: A perimeter formed by the points farthest away from the trunk of a tree where precipitation falling from the branches of that tree lands on the ground.
Evergreen: A plant with foliage that is retained and remains green year-round.
Ground cover: A low growing plant, other than turf grass, which forms a continuous cover over the ground surface.
Hardwood tree: Any tree that is not coniferous (cone bearing). This definition is based on the colloquialism, and does not necessarily reflect any true qualities of the tree.
Landscape plan: A graphic and written document containing criteria, specifications and detailed plans to arrange and modify the effects of natural features. A landscape plan consists of a site plan showing the boundaries of the property and the location of proposed plant materials, in relation to surroundings and improvements, along with a planting schedule and any additional specifications required by the zoning administrator.
Landscaped open space: That portion of a given lot, not covered by buildings, parking, access and service areas, or detention ponds, that is designed to enhance privacy and the amenity of the development by providing open spaces and/or landscaping features, screening and buffering for the benefit of the occupants or those in neighboring areas, or a general appearance of openness.
Landscaped open space may include, but need not be limited to, grass lawns, decorative planting, berms, walls and fences, pervious walkways, ornamental objects such as fountains, statues and other similar natural and man-made objects, wooded areas, and water courses, any or all of which are designed and arranged to produce an aesthetically pleasing effect within the development.
Landscaping: Shrubs, vines, turf, ground cover and other landscape materials which are utilized to enhance the aesthetic and functional qualities of a site.
Opaque: Impenetrable to view.
Overstory tree: Any deciduous or evergreen tree that has the potential to grow to a mature height of 40 feet or more.
Parking screen: A continuous hedge of evergreen shrubs attaining a height of at least 3 feet above grade.
Screening: An opaque visual screen with a height of at least 6 feet.
Shrub: A self-supporting woody plant that normally reaches a height of less than 15 feet.
Tree: Any living, self-supporting woody perennial plant which normally obtains a trunk diameter of at least 2 inches and a height of at least 10 feet, and typically has one main stem or trunk and many branches.
Tree protection area: An area designated for the purpose of saving natural trees, preserving the root system of natural trees and/or preserving natural buffers; tree protection areas include the critical root zones of all trees to be protected, as well as the above-ground portions of the trees.
Turf: Ground cover composed of one or more species of perennial grass that is grown as a permanent lawn.
Xeriscaping: Landscaping characterized by the use of vegetation that is drought-tolerant or low water use.
Sec. 9-103. Zoning buffer requirements.
(a) When required. Zoning buffers are required to be provided at the time of construction of any new development, subject to the requirements of this article.
(b) Disturbance. Zoning buffers when required shall remain undisturbed, except where necessary to add vegetation to meet screening requirements, unless encroachments or grading are specifically authorized by the zoning administrator. Unless encroachments or grading are specifically authorized, or unless a variance is granted, existing trees within a required zoning buffer shall not be removed.
(c) Minimum required screening.
(1) Required buffers shall provide screening, as defined, with a natural buffer of existing vegetation.
(2) Where the full width of the required buffer does not exist or where existing vegetation is sparse such that it does not meet the screening standard, the buffer shall be replanted at the required minimum width.
(3) Natural buffers may contain deciduous vegetation but shall contain evergreen trees suitable to local growing conditions that will provide an opaque visual screen during all seasons of the year.
(4) Unless existing vegetation provides the required screening or another alternative that meets the requirements for opaque visual screening is approved by the zoning administrator, one evergreen tree, with a minimum height of 4 feet at planting, with branches touching the ground shall be planted for each 30 feet of buffer length, for each 10 feet of required buffer width. Rows of evergreen trees shall be staggered.
Evergreen screening shrubs planted 4 feet on center shall also be used where necessary to provide the required screening.
(d) Buffer encroachments. Zoning buffers shall contain no driveways, parking areas, patios, stormwater detention facilities, or any other structures or accessory uses except that underground utilities may be permitted to cross a buffer if the screening standards of this UDC will be subsequently achieved.
(e) Maintenance. Every required buffer required shall be maintained by the owner of the property where the buffer is located, so as to provide an opaque visual screen to a height of at least 6 feet on a continuous, year-round basis.
(f) Shown on plans. All required buffers shall be shown on grading and landscaping plans.
DIVISION II
TREE PROTECTION
Sec. 9-201. Findings.
Trees provide food and shelter for wildlife; reduce noise, glare and provide wind breaks; purify the air through transpiration; intercept airborne particulate matter and reduce some air pollutants;
provide oxygen and reduce the level of carbon monoxide in the air; provide vital roles in erosion control, soil conservation, and the reduction in stormwater runoff; moderate the climate; increase property values; provide aesthetic amenities; and improve the quality of water.
Sec. 9-202. Tree protection required.
Tree protection requirements of this division shall be applied to every activity that requires the issuance of a land-disturbance permit or development permit under this UDC, except for activities otherwise exempted by this division or UDC.
Sec. 9-203. Designation of tree protection areas.
The following areas shall be designated as tree protection areas, within which it shall be unlawful to remove trees unless specifically provided otherwise by this article:
(a) Stream buffers. Stream buffers required by state law and this UDC (see Sec. 8-202(o)) shall be designated and delineated as tree protection areas on grading plans, landscaping plans, and final plats.
(b) Zoning buffers. Natural buffers when required by Table 2-2 of this UDC shall be designated and delineated as tree protection areas on grading plans, landscaping plans, and as buffers on final plats.
(c) Existing trees to be retained. Land developers and subdividers will be required to consider designing land developments and subdivisions in a way that protects existing trees to the maximum extent possible, while allowing for reasonable development of the site. Where a development site or subdivision has existing trees outside of required stream buffers and zoning buffers, and such trees are to be retained, the critical root zones around all such trees to be retained shall be designated and delineated as tree protection areas on grading plans, landscaping plans, and final plats as tree protection areas.
Sec. 9-204. Tree protection fencing required.
(a) Protection. Trees protection areas shall be actively protected during land disturbance and land development with tree protection fencing, installed at the boundaries of all tree protection areas prior to any land development or land disturbance activity.
(b) Barrier required. Tree fencing shall be a minimum of 4 foot in height and comprised of chain-link fencing, orange laminated plastic fencing supported by posts, wooden post and rail fencing, or other equivalent barrier (see figure below).
(c) Duration. Tree protection fencing required by this section shall remain in place until land development and construction activities are complete, or a certificate of occupancy is issued, or until authorization is given by the zoning administrator to remove the tree protection fencing.
Tree Protection Detail Sec. 9-205. Prohibitions within tree protection areas.
Except as specifically authorized in this article, tree protection areas shall remain in a natural, undisturbed condition; activities related to development within a tree protection area shall be prohibited. This specifically includes prohibition of the following within a tree protection area:
(a) vehicle or equipment parking, storage or traffic;
(b) materials or supplies storage;
(c) placement of temporary or permanent structures;
(d) equipment maintenance or washout;
(e) wounding of tree trunks; wounding or breakage of limbs or branches greater than four inches in diameter; topping or other improper pruning, such as stub cuts or flush cuts;
(f) fires or excessive heat from equipment exhausts;
(g) site or lot clearing or grubbing;
(h) soil excavation or soil cuts or fills;
(i) grading; trenching; tilling; soil compaction;
(j) top dressing with fill or soil greater than two inches in depth; and
(k) paving.
The zoning administrator may require that this section of the UDC appear verbatim on tree protection and landscaping plans.
Sec. 9-206. Tree damage.
Any tree within a tree protection area that is damaged during land disturbance, land development, or building or site construction shall be treated according to ANSI 300 standards.
If damage necessitates removal of a tree, it shall be replaced with a tree or trees of similar species and value.
Sec. 9-301. Reference to requirements.
(a) Minimum requirements. Article 2, Table 2-2 of this UDC establishes minimum landscaped open space requirements for certain uses and minimum front landscape strips for certain uses.
(b) Exemption. Single-family and two-family dwellings are exempt from the requirements of this division.
Sec. 9-302. Obstructions to sight visibility.
(a) All landscaping and trees planted adjacent to street rights of way and driveway intersections with rights of way must be installed in a manner that maintains minimum vision clearances on the adjacent right of way and the driveway approach.
(b) No shrub or tree with heights of between 2½ feet and 12 feet shall be located within 20 feet of the intersection of the right-of-way lines of streets, roads, highways or railroads, or within 20 feet of the intersection of a street right-of-way and either edge of a driveway.
(c) No landscaping shall be allowed that obstructs or impairs the vision of any vehicle operator at the intersection of any public rights-of-way, at any entrance onto or exit from a public road, or any other location where said obstruction would create a hazard to life or property.
Sec. 9-303. Frontage landscape strip.
(a) Width.
1. Minimum width. The minimum width of a frontage landscape strip shall be as specified in Table 2-2 of this UDC for the zoning district in which the development site is located, except as otherwise provided in this section.
2. Modification of width. The width of a minimum required frontage landscape strip shall typically be uniform across the frontage of the lot; provided, however, the zoning administrator may authorize the width of a minimum required frontage landscape strip to be varied so long as the total area of the frontage landscape strip equals or exceeds the total area that would otherwise be required for the frontage landscape strip. In no event shall a required frontage landscape strip be reduced to less than 3 feet under the provisions of this paragraph.
3. Natural vegetation in lieu of frontage landscape strip. The zoning administrator may authorize the retention of existing natural vegetation in lieu of a required frontage landscape strip, if retaining existing landscaping would provide an equivalent number of trees and shrubs as required by this section.
(b) Trees.
1. Planting rate. For any frontage landscape strip required by this UDC, trees shall be maintained or planted at the rate of at least one tree for every 40 feet of length of street frontage, or portion thereof (excluding driveways), for each 10 feet of required landscape strip width.
2. Spacing and arrangement. Trees may be spaced in a uniform manner or they may be clustered for a more natural or decorative arrangement.
3. Species. Such trees may be hardwoods or softwoods, but must be of a type that is suitable to local growing conditions.
4. Minimum size. At the time of planting, trees within required front landscape strips shall have a minimum caliper of at least 2 inches.
(c) Shrubs.
1. Rate. Shrubs shall be installed within any required frontage landscape strip at the rate of at least 10 shrubs for every 40 feet of length of street frontage, or portion thereof (excluding driveways), for each 10 feet of required landscape strip width.
2. Minimum size. Shrubs installed within any required frontage landscape strip must be at least 18 inches in height at the time of planting and must be capable of reaching a height of at least 2 feet at maturity.
(d) Authorized accessory uses within front landscape strips. The following uses are authorized within frontage landscape strips:
1. Driveways and sidewalks. Driveways and sidewalks may be located within a required frontage landscape strip to the extent needed to cross the landscape strip.
2. Walls. Retaining walls, and walls or fences authorized by the zoning administrator for screening or aesthetic effect, may be located in a required frontage landscape strip.
3. Signage. If permitted by this UDC, a ground sign may be located within a required frontage landscape strip.
4. Utilities. Underground utilities may cross a required frontage landscape strip. Fire hydrants shall also be authorized to be located within a required frontage landscape strip.
5. Stormwater. Detention ponds shall not be authorized within required frontage landscape strips. However, a land development project that incorporates low impact development principles consistent with the Georgia Stormwater Management Manual (e.g., vegetative swale) may be authorized by the zoning administrator to be located within required frontage landscape strip. Stormwater Best Management Practices (BMPs) may be applied or incorporated within front landscaping strips, and a front landscaping strip may if appropriate be accepted as a BMP.
(e) Relationship to utility easements. Where a development site has an existing or proposed utility easement abutting and running parallel or approximately parallel to the right of way in the same location as a minimum required frontage landscape strip, the landscape strip shall be relocated interior to the utility easement that abuts and parallels or approximately parallels the right of way; provided, however, the zoning administrator may authorize part of the minimum frontage landscape strip be located within the utility easement only if the utility easement owner authorizes the planting of trees and shrubs within the utility easement.
Sec. 9-304. Side lot line landscape strips.
Landscape strips along side lot lines are not required except when screening of a parking lot is required, in which case a side landscape strip along the parking lot shall be provided.
Sec. 9-305. Parking lot landscaping.
(a) Applicability. This section shall apply to parking lots with 10 or more car parking spaces.
(b) Planting island. One parking lot tree for each 10 car parking spaces is required and shall be installed. No more than 10 contiguous car parking spaces shall be allowed without a minimum of one landscape island or peninsula containing one or more trees.
Illustrative Parking Lot Landscaping
(c) Minimum dimensions of islands. A landscape island within a parking lot shall have a minimum width of 9 feet and minimum depth of 16 feet measured from interior face of curb to interior face of curb; however, wider (12 or more feet) landscaping islands are strongly encouraged and may be required to provide sufficient growing area for certain canopy tree species selected.
Parking Lot Landscaping Island Detail Sec. 9-306. Approval of plant materials.
The zoning administrator is authorized to promulgate and publish and amend from time to time a list of approved plant species. Specific landscaping, trees, and buffer material are subject to the approval of the zoning administrator.
Sec. 9-307. General landscaping requirements.
(a) Native plants. The use of native plants is encouraged.
(b) Invasive species. Invasive or potentially invasive plants are prohibited.
(c) Xeriscaping and water conservation. Xeriscaping is encouraged. Ground covers should be used to supplement landscaping in appropriate areas to reduce extensive grass lawns that require regular watering in drought conditions.
(d) Trees. Trees selected for planting must be free from injury, pests, disease, nutritional disorders or root defects, and must be of good vigor in order to assure a reasonable expectation of survivability.
(e) Diversity. No more than 50% of trees or shrubs planted on any given site shall consist of any one species.
(f) Grass. Grass lawn areas should be sodded. However, if grass seed must be used, it shall be a variety suitable to the area that produces complete coverage.
(g) Artificial landscaping. No artificial plants, trees, turf, or other vegetation shall be installed.
(h) ANSI 300 standards. Landscaping shall meet the requirements of ANSI 300 unless otherwise approved by the zoning administrator.
(i) Curb Stops. A curb or wheel stop shall be provided along interior parking lot landscape islands, perimeter landscape strips, and landscapes adjacent to street rights-of-ways, to prevent cars from encroaching on trees, shrubs, and landscapes, as approved by the zoning administrator.
(d) Minimum planting. Each landscape island shall contain a minimum of one tree having a minimum caliper of two inches at the time of planting.
(e) Parking screen. If the land development includes 10 or more parking spaces within a front yard, the shrubs must be arranged to provide a continuous visual screen to a height of three feet above grade between the front right of way and the parking lot. If the land development includes 10 or more parking spaces within a side yard, the shrubs must be arranged to provide a visual screen along the front right of way and that portion of the side yard parking lot. Where parking spaces within a front yard are visible from the front public right of way even with the frontage landscape strip, the continuous visual screen required by this subsection shall be extended along the side lot line for the length of the parking area that is visible from front public right of way. Parking lot screening may require the planting of shrubs at a higher rate than is otherwise be required by this article.
Sec. 9-308. Plans.
(a) For any land disturbance, land development, or building subject to the requirements of this article, buffer, tree protection and landscaping plans are required to be submitted with any application for a land disturbance permit, development permit, tertiary land disturbance permit, or for a building permit for new construction of buildings.
(b) Buffer, tree protection and landscaping plans shall be required for only that phase of development for which the land-disturbance permit, tertiary land-disturbance permit, development permit or building permit is being requested.
Sec. 9-309. Contents of tree protection and landscaping plans.
Tree protection and landscaping plans shall meet the following minimum requirements:
(a) A site plan with property boundaries, proposed buildings, parking areas, loading areas, required buffers, utility easements if any, and other pertinent information as may be required by the zoning administrator. The site plan shall show the location of all trees, shrubs, and landscaping.
(b) A planting schedule for all trees, shrubs, and ground covers proposed, with scientific name and common names of each species, the total number of each species planted, and total numbers of trees. Trees and shrubs shall be indicated on the plan using symbols and the symbols must appear in the planting schedule.
(c) Calculations demonstrating the plan meets the following, if applicable:
(1) Minimum landscaped open space specified in Table 2-2 for the zoning district in which the property is located.
(2) Required number of trees and shrubs within any required frontage landscape strip.
(3) Parking lot landscaping requirements.
(4) Zoning buffer and parking lot screening requirements.
(d) Standard details and notes with regard to planting instructions.
Sec. 9-310. Maintenance of landscaping.
(a) Plants that are diseased, damaged beyond point of survival, or are dead shall be removed and replaced with a plant of the same species, variety or cultivator, as approved by the zoning administrator.
(b) All landscape materials shall be maintained and shall be kept clear of refuse and debris.
Sec. 9-311. Inspection.
An inspection shall be made by the zoning administrator of all landscape plantings to assure compliance with plan requirements prior to approval of a certificate of occupancy. The zoning administrator may authorize the delay of planting in cases of drought or inappropriate season for planting, in which case the zoning administrator shall require a bond or other appropriate surety in an amount equal to the estimated costs of the landscaping deferred.
DIVISION I STORMWATER MANAGEMENT
DIVISION II DRAINAGE SPECIFICATIONS
DIVISION I
STORMWATER MANAGEMENT
Sec. 10-101. Findings.
(a) Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, which in turn increase flooding, stream channel erosion, and sediment transport and deposition.
(b) Land development projects and other land use conversions also contribute to increased nonpoint source pollution and degradation of receiving waters.
(c) The impacts of post-development stormwater runoff quantity and quality can adversely affect public safety, public and private property, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters.
(d) These adverse impacts can be controlled and minimized through regulation of stormwater runoff quantity and quality from land development by the use of structural facilities as well as nonstructural measures, such as the conservation of greenspace.
Sec. 10-102. Definitions.
Bioretention: A practice to manage and treat stormwater runoff by using a conditioned planting soil bed and planting materials to filter runoff stored within a shallow depression. The method combines physical filtering and adsorption with biological processes.
Channel: A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
Clean Water Act: The Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto.
Construction activity: Activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES General Construction Permits. These include construction projects resulting in land disturbance. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition.
Conveyance: An aboveground or underground natural or man-made drainage feature, that provides for the collection and movement of stormwater, and shall include but not be limited to concrete or metal pipes, ditches, depressions, swales, roads with drainage systems, highways, city or county streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, drainage channels, reservoirs, rights of way, storm drains, culverts, street gutters, oil/water separators, modular pavements and other similar drainage structures.
Detention: The temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling peak discharge.
Detention facility: A retention basin or structure designed for temporary storage of stormwater runoff and gradual release of stored water at controlled rates.
Drainage: A general term applied to the removal of surface or subsurface water from a given area either by gravity or by pumping; most commonly applied to surface water.
Drainage easement: An easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the terms of the drainage easement.
Drainage structure: A device composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control or flood control purposes.
Drainage system: The surface and subsurface system for the removal of water from the land, including both the natural elements of streams, marshes, swales and ponds, whether of an intermittent or continuous nature, and the man-made element which includes culverts, ditches, channels, detention facilities and the storm sewer system.
Dry well: A small excavated pit backfilled with aggregate, usually pea gravel or stone. Dry wells function as infiltration systems used to control runoff from building rooftops. Another special application of dry wells is modified catch basins, where inflow is a form of direct surface runoff.
Dry wells provide the majority of treatment by processes related to soil infiltration, including absorption, trapping, filtering, and bacterial degradation.
Erosion and sedimentation control plan: A plan designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.
Extended detention: The detention of stormwater runoff for an extended period, typically 24 hours or greater.
Filter strip: Typically, a band of close-growing vegetation, usually grass, planted between pollutant source areas and a downstream receiving waterbody. Vegetation can filter sediment from runoff. Thus grass strips can be used to remove sediment from surface runoff. Vegetation also slows the velocity of runoff and helps maintain the infiltration capacity of a soil.
Georgia Stormwater Management Manual: A three-volume set which provides policy and technical details to implement this article. The manual may be revised from time to time but at the time this article is adopted includes: Volume 1: Local Government Guide (2016 Editions);
Volume 2: Technical Handbook (2016 Edition); and Volume 3; Pollution Prevention Guidebook (2012).
Infiltration: The process by which stormwater runoff percolates into the subsoil.
Infiltration trench: An excavated trench that has been back-filled with stone to form a subsurface basin. Stormwater runoff is diverted into the trench and is stored until it can be infiltrated into the soil, usually over a period of several days. An infiltration trench may include pretreatment such as vegetated filter strips or grassed swales.
Level spreader: Typically, an outlet designed to convert concentrated runoff to sheet flow and disperse it uniformly across a slope to prevent erosion. Level spreaders can be used to convey sheet flow runoff from lawn areas within graded areas to bioretention facilities and transition areas.
Low-impact development: The integration of site ecological and environmental goals and requirements into all phases of urban planning and design from the individual lot level to the entire watershed. In the context of this article, low-impact development is a set of stormwater design practices that are non-structural stormwater controls, specifically stormwater better site design practices.
National Pollutant Discharge Elimination System (NPDES) stormwater discharge permit: A permit issued by the Georgia EPD under authority delegated pursuant to 33 USC § 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.
Natural, undisturbed conditions: For redevelopment projects or where there are no flooding concerns, this term shall mean the condition of the site immediately prior to the implementation of the proposed project.
New development: A land development activity on a previously undisturbed site that has been maintained in a natural state.
Nonpoint source pollution: A form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial plant discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction and subsurface disposal as well as from urban runoff sources.
Nonstructural stormwater management practice or nonstructural practice: Any natural or planted vegetation or other nonstructural component of the stormwater management plan that enhances stormwater quantity and/or quality control or other stormwater management benefits and includes, but is not limited to, riparian buffers, greenspace areas, overland flow filtration areas, natural basins and vegetated channels.
Off-site facility: A stormwater management facility located outside the boundaries of a development site.
On-site facility. A stormwater management facility located within the boundaries of a development site.
Permeable: Soil or other material that allows the infiltration or passage of water or other liquids.
Pollutant: Anything that causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution;
floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; process waste water and wash water; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any kind.
Pollution: The man-made or man-induced alteration of the chemical, physical, biological, thermal and radiological integrity of water.
Regional stormwater management facility or regional facility: Stormwater management facilities designed to control stormwater runoff from multiple properties where the owners or developers of the individual properties may assist in financing the facility and the requirement for on-site stormwater management facilities is either eliminated or reduced.
Stormwater better site design: Nonstructural site design approaches and techniques that can reduce the impact of a site on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management.
Stormwater credits for better site design: A set of stormwater “credits” can be used to provide developers and site designers an incentive to implement better site design practices that can reduce the volume of stormwater runoff and minimize the pollutant loads from a site. The credit system directly translates into cost savings to the developer by reducing the size of structural stormwater control and conveyance facilities.
Stormwater management: The collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, stream bank channel erosion and habitat and water quality degradation, and to enhance and promote public health, safety and general welfare.
Stormwater management facility: Any infrastructure that controls or conveys stormwater runoff.
Stormwater management measure: Any stormwater management facility or nonstructural stormwater practice.
Stormwater management plan: A document describing the manner in which existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this article.
Stormwater management system: The full array of structural and nonstructural stormwater management facilities and practices used to capture, convey and control the quantity and quality of the stormwater runoff from a site.
Stormwater retrofit: A stormwater management practice designed for a developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.
Stormwater runoff: The flow of surface water resulting from precipitation.
Structural stormwater control: A structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff.
Swale: An open drainage channel designed to detain or infiltrate stormwater runoff. Grassed swales consist of two types: the dry swale, which provides both quantity (volume) and quality control by facilitating stormwater infiltration; and the wet swale, which uses residence time and natural growth to reduce peak discharge and provide water quality treatment before discharge to a downstream location.
Sec. 10-103. Applicability.
(a) No person, owner or developer shall perform any land development activities without first meeting the applicable requirements of this article prior to commencing the proposed activity.
(b) Unless specifically exempted by this article, all persons proposing development or construction shall prepare and submit a stormwater management plan for approval by the zoning administrator as a part of the development and/or land-disturbing permitting processes required by articles 7 and 8, respectively, of this UDC.
Sec. 10-104. Exemptions.
The following activities are exempt from this article:
(a) Individual single-family or duplex residential lots that are not part of a subdivision or phased development project;
(b) Additions or modifications to existing single-family or duplex residential structures;
(c) Agricultural or silvicultural land management activities within areas lawfully used or zoned for these activities; and,
(d) Repairs to any stormwater management facility or practice deemed necessary by the zoning administrator.
(e) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs.
Sec. 10-105. Approval of stormwater management plan.
No final plat for a major subdivision, no land-disturbance or development permit, and no building permit shall be approved or issued until and unless the stormwater management plan, if required by this article, has been reviewed and approved by the zoning administrator.
Sec. 10-106. Installation of an adequate drainage system.
(a) An adequate drainage system, including necessary ditches, pipes, culverts, drains, inlets, or other stormwater management features which may include better sign design practices, shall be provided for the proper drainage or infiltration of all surface water on all development and construction sites unless specifically exempted by this article.
(b) The location and size of all proposed drainage improvements shall be designed in accordance with and meet all standards relating to stormwater drainage under this article and technical standards of this UDC as applicable.
(c) Stormwater drainage facilities shall be installed in accordance with the approved stormwater management plan. Construction of the stormwater system shall be initiated as part of the grading of the site. Stormwater detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate.
Sec. 10-107. Contents of stormwater management plan.
A stormwater management plan, when required, shall include sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed development on water resources, and the effectiveness and acceptability of measures proposed for managing stormwater runoff. Said information shall at minimum include a site plan of the proposed land development and building and the following:
(a) Size and location of existing storm sewers, drains, culverts, or other underground facilities within the tract or within the right-of-way of streets or roads adjoining the tract.
Grades and invert elevations of storm sewers shall be shown.
(b) Location and profiles of all storm drainage pipes and slopes of receiving channels.
(c) Hydraulic grade lines shall be shown on all pipes that cross streets and on all detention basin outfalls.
(d) Stormwater detention facility location, design and construction details, including a soils map and investigation for all sites proposed as ponds or impoundments or for stormwater detention. Construction details shall include appropriate access (minimum 20-foot wide access easement), a gravel access drive, fencing with locked gate, and landscaping to screen the installation.
(e) Location and typical construction details of all inlets and catch basins, headwalls and other drainage structures.
(f) The 100-year ponding limits above each street cross drain, where provided.
(g) Hydrologic and hydraulic analysis for the storm drainage system design.
(h) Construction schedule for both temporary and permanent facilities in relation to the schedule for development activities such as clearing, rough grading, construction, final grading, and vegetation establishment.
Sec. 10-108. System maintenance.
(a) It shall be the responsibility of the developer to maintain all facilities required by the stormwater management plan during construction and for a two–year maintenance period following approval of a final subdivision plat or issuance of a certificate of occupancy, as applicable. The developer shall be responsible for removing temporary structures or facilities at the completion of the construction.
(b) The owner of the property shall be responsible for maintaining the permanent stormwater management facilities identified by the stormwater management plan to remain after construction is complete, following the two-year maintenance period.
(c) Should an owner or developer, whichever is the responsible party, fail to maintain the stormwater management facilities in a state of service intended by the stormwater management plan, then the zoning administrator shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies.
(d) If the responsible party fails to perform the required maintenance work within a reasonable period of time (30 days maximum), then the owner shall be in violation of this
UDC.
Sec. 10-109. Location of stormwater detention facilities.
(a) In residential subdivisions, any detention facility must be located on a separate lot and owned by a homeowners’ association, which shall be responsible for its maintenance and continuing operation. The lot need not meet minimum lot size requirements for the subdivision or the zoning district in which it is located.
(b) In nonresidential subdivisions, any detention facility may be located on a separate lot and owned by a property owners’ association, which shall be responsible for its maintenance and continuing operation; or located on each lot within the subdivision and constructed when the lot is developed.
(c) In multi-family residential and nonresidential development projects, detention facilities shall be provided for each development. The owner of the property shall be responsible for maintenance and continuing operation of the facilities.
(d) Stormwater detention facilities serving two or more developments may be approved by the zoning administrator , provided that private ownership of the facilities and provisions for their perpetual maintenance and continuing operation are clearly established in a manner acceptable to the zoning administrator.
DIVISION II
DRAINAGE SPECIFICATIONS
Sec. 10-201. All drainage structures.
(a) Allstorm water drainage structuresshall bedesigned tosafely accommodate the 25- year, twenty-four hour event.
(b) The drainage formula used in design of all drainage structures shall bedetermined by thedeveloper’sstate-approved professional and based on sound engineering practice.
(c) Methodology used for the design of detention facilities shall be the Soil Conservation Service method using a Type II rainfall distribution.
Sec. 10-202. Design for detention and retention ponds.
Stormwatermanagementstructures(i.e.detention andretention)shall bedesignedbased upon the 2, 5, 10, 25, 50 and 100-year, twenty-four hour events.
Sec. 10-203. Required pipe materials.
(a) All cross-drain pipes under streets carrying live streams and all bridges shall be designed for a 100-year storm event and shall be constructed of reinforced concrete pipe (RCP) from headwall to headwall.
(b) All piping within the right-of-way shall be reinforced concrete pipe (RCP).
(c) Piping outside of the right-of-way may be reinforced concrete pipe (RCP), aluminized type II corrugated metal pipe, ordouble-walled high-densitypolyethylene pipe.
Sec. 10-204. Headwalls.
(a) The inlet and outlet ends of all storm drain pipes for streets shall have concrete headwalls or ametalflared-end section with safety grates, city-approved grate and frame, or raised pedestal drop inlets meeting the standards of the Georgia DOT.
(b) Reinforced concrete headwalls are required for all pipes on live streams.
(c) All cross drain pipes that carry water from one side of the roadway to the other that are 30 inches in diameter or larger shall have cast in place headwalls on both the inlet and outlet ends per GDOT Standard 1125. No precast headwalls will be allowed.
Sec. 10-205. Pipe sizes.
All drainage pipesin a city right-of-way shall be aminimum of 18 inches in diameter.
Sec. 10-206. Drainage ditches.
All man-made storm water drainage ditches shall be designed by a state-approved professional. The ditch profile and typical cross sections, including the velocity of flow, drainage area, and normal depth shall be shown on plans. All ditches shall be checked for shearstress and appropriate liners, grassing orrip-rap shall be specified. Under no condition will an unlined ditch be approved for velocities in excess of five FPS.
DIVISION I GENERAL PROVISIONS
DIVISION II PERMITTING REQUIREMENTS
DIVISION III PROVISIONS FOR FLOOD HAZARD REDUCTION
floodway (A-zones).
Sec. 11-309. Standards for areas of special flood hazard (Zones AE) with established base flood elevations without designated floodways.
DIVISION IV VARIANCES AND APPEALS
DIVISION V ADMINISTRATION AND LEGAL STATUS PROVISIONS
DIVISION I
GENERAL PROVISIONS
Sec. 11-107. Basis for area of special flood hazard.
Sec. 11-101. Authority.
Article IX, Section II of the Constitution of the State of Georgia and Section 36-1-20(a) of the Official Code of Georgia Annotated have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry.
Sec. 11-102. Findings.
(a) The flood hazard areas of Statham, Georgia are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, flood-proofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.
(c) The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by man-made or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of the City of Statham, or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder.
Sec. 11-103. Purposes.
It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions applicable in the City of Statham designed to:
(a) Require that uses vulnerable to floods, including facilities, which serve such uses, be protected against flood damage at the time of initial construction;
(b) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;
(c) Control filling, grading, dredging and other development which may increase flood damage or erosion;
(d) Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands; and
(e) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.
Sec. 11-104. Objectives.
The objectives of this article are to:
(a) Protect human life and health;
(b) Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains
(c) Help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize flood blight areas,
(d) Minimize expenditure of public money for costly flood control projects;
(e) Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(f) Minimize prolonged business interruptions, and;
(g) Insure that potential homebuyers are notified that property is in a flood area.
Sec. 11-105. Applicability.
This ordinance shall apply to all areas of special flood hazard within the city limits of Statham, Georgia.
Sec. 11-106. Definitions.
Unless specifically defined below, words or phrases used in this section shall be interpreted so as to give them the meaning they have in common usage and to give this section its most reasonable application.
Accessory structure: A structure having minimal value and used for parking, storage and other non-habitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and the like.
Addition (to an existing building):Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall.
Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered “new construction.”
Administrator: The zoning administrator of the City of Statham, Georgia.
Appeal: A request for a review of the zoning administrator’s interpretation of any provision of this article.
Area of shallow flooding: A designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
Area of special flood hazard: The land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. In the absence of official designation by the Federal Emergency Management Agency, Areas of Special Flood Hazard shall be those designated by the local community and referenced in this article.
Base flood: The flood having a one percent chance of being equaled or exceeded in any given year.
Base Flood Elevation (BFE): The elevation shown on the Flood Insurance Rate Map for Zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one percent chance of equaling or exceeding that level in any given year.
Basement: That portion of a building having its floor sub grade (below ground level) on all sides.
Building: Any structure built for support, shelter, or enclosure for any occupancy or storage.
Critical facility: Any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include: structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials; hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events; emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and generating plants, and other principal points of utility lines.
Development: Any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.
Elevated building: A non-basement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.
Existing construction: For the purposes of determining rates, structures for which the "start of construction" commenced before the effective date of the initial Flood Insurance Rate Maps for that community.
Existing manufactured home park or subdivision: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before the effective date of the first floodplain management regulations adopted by the City of Statham.
Expansion to an existing manufactured home park or subdivision: The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
Flood or flooding: A general and temporary condition of partial or complete inundation of normally dry land areas from: the overflow of inland or tidal waters; or the unusual and rapid accumulation or runoff of surface waters from any source.
Flood Hazard Boundary Map (FHBM): An official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as Zone A.
Flood Insurance Rate Map (FIRM): An official map of a community, issued by the Federal Insurance Administration, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
Flood Insurance Study: The official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.
Floodplain: Any land area susceptible to flooding.
Flood proofing: Any combination of structural and non-structural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Floodway: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Freeboard: A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. “Freeboard” tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
Highest adjacent grade: The highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building.
Historic structure: Any structure that is: listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either (1) by an approved state program as determined by the Secretary of the Interior, or (2) directly by the Secretary of the Interior in states without approved programs.
Lowest floor: The lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this section.
Manufactured home: A building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.
Manufactured home park or subdivision: A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
Mean sea level: The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community’s Flood Insurance Rate Map are referenced.
National Geodetic Vertical Datum (NGVD): As corrected in 1929 is a vertical control used as a reference for establishing varying elevations within the floodplain.
New construction: For the purposes of determining insurance rates, structures for which the “start of construction” commenced after the effective date of the initial Flood Insurance Rate Map and includes any subsequent improvements to such structures. For floodplain management purposes, “new construction” means structures for which the “start of construction” commenced after the effective date of the first floodplain management ordinance adopted by the City of Statham and includes any subsequent improvements to such structures.
New manufactured home park or subdivision: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed after the effective date of the first floodplain management ordinance adopted by the City of Statham.
North American Vertical Datum (NAVD): Has replaced the National Geodetic Vertical Datum of 1929 in existing and future FEMA Flood Modernization Maps.
Recreational vehicle: A vehicle, which is built on a single chassis; 400 square feet or less when measured at the largest horizontal projection; designed to be self-propelled or permanently towable by a light duty truck; and designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Start of construction: The date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation.
(Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE:
accessory structures are NOT exempt from any ordinance requirements). For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure: A walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank.
Subdivision: The division of a single lot into two or more lots for the purpose of sale or development.
Substantial damage: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred.
Substantial improvement: Any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a 5-year period, in which the cumulative cost equals or exceeds fifty (50) percent of the market value of the structure prior to the “start of construction” of the improvement. Note: The market value of the structure should be (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures, which have incurred “substantial damage,” regardless of the actual amount of repair work performed.
For the purposes of this definition, “substantial improvement” is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. The term does not, however, include (1) those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the Administrator or his or her designee, and not solely triggered by an improvement or repair project, or (2) any alteration of a “historic structure” provided that the alteration will not preclude the structure’s continued designation as a ”historic structure.”
Substantially improved existing manufactured home parks or subdivisions: Where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
Variance: A grant of relief from the requirements of this article, which permits construction in a manner otherwise prohibited by this section.
Violation: The failure of a structure or other development to be fully compliant with the community’s floodplain management regulations. A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this ordinance is presumed to be in violation until such time as that documentation is provided.
Sec. 1007. Basis for area of special flood hazard.
(a) Flood insurance study. The areas of special flood hazard identified by the Federal Emergency Management Agency in its Flood Insurance Study (FIS), for Barrow County, Georgia and incorporated areas effective December 18, 2009, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this article.
(b) Flood insurance rate maps. The flood insurance rate maps for Barrow County, Georgia and incorporated areas effective December 18, 2009, are adopted as if fully contained within this article and shall be the basis for determining areas of special flood hazard.
(c) Additional areas of special flood hazard. Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a Flood Insurance Study.
(d) Repository. The repository for public inspection of the Flood Insurance Study (FIS), accompanying maps and other supporting data and the Flood Insurance Rate Maps is the office of the city clerk, City of Statham.
DIVISION II
PERMITTING REQUIREMENTS
Sec. 11-201. Permit required.
No development activity shall commence within an area regulated by this article until and unless a flood area permit shall have been approved by the zoning administrator. No development activity shall be approved unless it conforms with the provisions of this article prior to the commencement of any development activities. No building or structure shall be constructed within an area regulated by this article until and unless a flood area permit or building permit, or both if required shall have been approved by the zoning administrator. No building or structure shall be approved unless it conforms with the provisions of this article prior to the construction of said building or structure.
Sec. 11-202. Permit procedures.
Application for a flood area permit shall be made to the zoning administrator on forms furnished by the department prior to any development activities, and may include, but not be limited to the following: plans in sufficient number as specified by the department, drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.
Sec. 11-203. Specific information required – application stage.
The following information is required at the application stage:
(a) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
(b) Elevation in relation to mean sea level to which any non-residential structure will be flood-proofed;
(c) Design certification from a registered professional engineer or architect that any proposed non-residential flood-proofed structure will meet the flood-proofing criteria of this Article; and
(d) Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development.
Sec. 11-204. Specific information required – construction stage.
The following information is required at the construction stage:
(a) For all new construction and substantial improvements, the permit holder shall provide to the zoning administrator an as-built certification of the regulatory floor elevation or flood-proofing level immediately after the lowest floor or flood proofing is completed.
Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.
(b) Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The zoning administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed.
Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project
floodway (A-zones).
Sec. 11-309. Standards for areas of special flood hazard (Zones AE) with established base flood elevations without designated floodways.
Sec. 11-301. General standards.
In all areas of special flood hazard the following provisions are required:
(a) Anchoring. New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure.
(b) Flood-resistant materials. New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage.
(c) Construction methods and practices. New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage.
(d) Heating and air conditioning. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(e) Manufactured homes. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable State requirements for resisting wind forces.
(f) Water supply. New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.
(g) Sewage systems. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.
(h) On-site sewage disposal systems. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.
(i) Nonconformities. Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this ordinance, shall be undertaken only if the non- conformity is not furthered, extended or replaced.
Sec. 11-302. Elevated buildings.
(a) In all areas of special flood hazard, all new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
(b) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings shall be no higher than one foot above grade; and,
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both direction.
(c) So as not to violate the “lowest floor” criteria of this article, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area, and
(d) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
Sec. 11-303. New construction and/or substantial improvements.
In all areas of special flood hazard the following provisions are required for new construction and/or substantial improvements:
(a) Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation.
Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of this article for “elevated buildings.”
(b) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above three feet above the base flood elevation.
Sec. 11-304. Non-residential construction.
(a) New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to three (3) feet above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.
(b) A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the zoning administrator as set forth in this article.
Sec. 11-305. Manufactured homes.
Where base flood elevation data are available:
(a) All manufactured homes placed and/or substantially improved on: (1) individual lots or parcels, (2) in new and/or substantially improved manufactured home parks or subdivisions, (3) in expansions to existing manufactured home parks or subdivisions, or
(4) on a site in an existing manufactured home park or subdivision where a manufactured home has incurred “substantial damage” as the result of a flood, must have the lowest floor including basement, elevated no lower than three feet above the base flood elevation.
(b) Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either: the lowest floor of the manufactured home is elevated no lower than three feet above the level of the base flood elevation; or the manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
(c) All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement.
Sec. 11-306. Recreational vehicles.
All recreational vehicles placed on sites must either:
(a) Be on the site for fewer than 180 consecutive days;
(b) Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
(c) The recreational vehicle must meet all the requirements for “new construction,” including the anchoring and elevation requirements of this article.
Sec. 11-307. Floodway.
Located within areas of special flood hazard established in this Article are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
Sec. 11-308. Building standards for streams without established base flood elevations and/or floodway (A-zones).
Located within the areas of special flood hazard established in this article, are streams for which no base flood data have been provided (A-Zones), or where base flood data have been provided but a floodway has not been delineated. When base flood elevation data or floodway data have not been provided in accordance with this section, then the administrator shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a Federal, State, or other source, in order to administer the provisions of this article. Only if data are not available from these sources, then the following provisions apply:
(a) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or twenty feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in more than a one foot increase in flood levels during the occurrence of the base flood discharge.
(b) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (NOTE: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-Zone areas where a limited detail study has been completed). Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of this section for “elevated buildings.”
(c) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.
(d) The administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
Sec. 11-309. Standards for areas of special flood hazard (Zones AE) with established base flood elevations without designated floodways.
Located within the areas of special flood hazard established in this article, where streams with base flood elevations are provided but no floodways have been designated (Zones AE), the following provisions apply:
(a) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles.
(b) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with this article.
Sec. 11-310. Standards for areas of shallow flooding (AO Zones).
Areas of special flood hazard established in this section may include designated “AO” shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:
(a) All new construction and substantial improvements of residential and non-residential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the Flood Insurance Rate Map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of this Article for “elevated buildings.” The administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(b) New construction or the substantial improvement of a non-residential structure may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus two feet, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth in this paragraph and as required in this article.
(c) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
Sec. 11-311. Subdivisions.
(a) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage.
(b) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
(c) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards.
(d) For subdivisions and/or developments greater than fifty lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a Conditional Letter of Map Revision (CLOMR) or Conditional Letter of Map Amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the “as-built” data to FEMA in order to obtain the final LOMR.
Sec. 11-312. Critical facilities.
Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain. All ingress and egress from any critical facility must be protected to the 500-year flood elevation.
Sec. 11-402. Criteria and conditions for variances.
Sec. 11-401. Variance procedures.
(a) The Statham City Council shall hear and decide requests for appeals or variance from the requirements of this article. Procedures for consideration of variances to the requirements of this article shall be the same as provided in this UDC for variances generally.
(b) The Statham City Council shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the zoning administrator, in the enforcement or administration of this article. Procedures for consideration of appeals shall be the same as provided in this UDC for appeals of administrative decisions, generally.
(c) Any person aggrieved by the decision of the Statham City Council may appeal such decision to the Superior Court of Barrow County, as provided in Section 5-4-1 of the Official Code of Georgia Annotated.
Sec. 11-02. Criteria and conditions for variances.
The provisions of this article are minimum standards for flood loss reduction; therefore, any deviation from the standards must be weighed carefully. In reviewing requests for variances, the Statham City Council shall consider all technical evaluations, relevant factors, and the following standards in addition to others in this ordinance. A variance shall be issued only when consistent with the following criteria and conditions:
(a) A finding of good and sufficient cause is made.
(b) A determination is made that failure to grant the variance would result in exceptional hardship.
(c) A determination is made that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
(d) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(e) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
(f) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure. In the instance of an historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.
(g) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
Sec. 11-403. Conditional approval permitted.
Upon consideration of the factors listed above and the purposes of this ordinance, the Statham City Council may attach such conditions to the granting of variances as it deems necessary to further the purposes of this article.
Sec. 11-404. Actions following variance approval.
(a) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.
(b) The zoning administrator shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request.
DIVISION V
ADMINISTRATION AND LEGAL STATUS PROVISIONS
Sec. 11-501. Administration.
The zoning administrator is hereby appointed to administer and implement the provisions of this article. Duties of the zoning administrator shall include, but shall not be limited to the following:
(a) Review proposed development to assure that the permit requirements of this article have been satisfied.
(b) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by Federal or State law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.
(c) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(d) When base flood elevation data or floodway data have not been provided in accordance with this article, then the Administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a Federal, State or other sources in order to administer the provisions of this article.
(e) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with this section.
(f) Review and record the actual elevation, in relation to mean sea level to which any new or substantially improved structures have been flood-proofed, in accordance with this article.
(g) When flood-proofing is utilized for a structure, the administrator shall obtain certification of design criteria from a registered professional engineer or architect in accordance with this article.
(h) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.
(i) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
(j) For any altered or relocated watercourse, submit engineering data/analysis within six (6) months to the FEMA to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained.
(k) Make interpretations of this article. In the interpretation and application of this Article all provisions shall be: considered as minimum requirements; liberally construed in favor of the city, and; deemed neither to limit nor repeal any other powers granted under state statutes. Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. In the interpretation and application of this ordinance all provisions shall be: (1) considered as minimum requirements; (2) liberally construed in favor of the city, and; (3) deemed neither to limit nor repeal any other powers granted under state statutes.
(l) All records pertaining to the provisions of this article shall be maintained in the office of the city clerk and shall be open for public inspection.
Sec. 11-502. Abrogation and greater restrictions.
This article is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this article and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
Sec. 11-503. Warning and disclaimer of liability.
The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by man-made or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of the City of Statham, or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder.
Sec. 11-504. Penalties for violation.
Failure to comply with the provisions of this article or with any of its requirements, including conditions and safeguards established in connection with grants of variance shall constitute a violation. Any person who violates this ordinance or fails to comply with any of its requirements shall be subject to the provisions of the Code of the City of Statham and this UDC relative to violations. Nothing herein contained shall prevent the City of Statham from taking such other lawful actions as is necessary to prevent or remedy any violation.
DIVISION I TEXT AMENDMENT
decisions.
DIVISION II AMENDMENT TO THE OFFICIAL ZONING MAP (REZONING)
DIVISION III CONDITIONAL USE
DIVISION V PROCEDURES FOR CALLING AND CONDUCTING PUBLIC HEARINGS
DIVISION V DEVELOPMENT OF REGIONAL IMPACT
DIVISION VI APPEALS
DIVISION I
TEXT AMENDMENT
decisions.
Sec. 13-101. Authority to amend.
The Statham City Council may from time to time amend any regulation pertaining to any zoning district; or may amend any other article or section of this UDC.
Sec. 13-102. Initiation of proposals for text amendments.
The zoning administrator may propose change to the text of this UDC when public necessity, general welfare or good zoning practice justify such action.
Sec. 13-103. Notice of public hearing.
(a) City Council. At least 15 but not more than 45 days prior to the date of the public hearing before the Statham City Council, the city shall cause to be published within a newspaper of general circulation within the city and county a notice of the public hearing before the Statham City Council. The notice shall state the time, place, and purpose of the public hearing.
Sec. 13-104. Public hearing.
The Statham City Council shall hold a public hearing on all text amendments in accordance with the public hearing procedures specified in this article.
Sec. 13-105. Recommendation and decision.
The Statham City Council shall, following a public hearing or thereafter, render a decision on the text amendment. The City Council may approve or disapprove the proposed text amendment as written, or it may approve modifications of the text amendment originally proposed.
In rendering a recommendation on any text amendment, the City Council shall consider all information supplied by the zoning administrator. In rendering a decision on any text amendment the City Council shall consider all information supplied by the zoning administrator as well as any testimony and information accepted during public hearing.
Sec. 13-106. Withdrawal of text amendment.
Any application for an amendment to the text of this UDC may be withdrawn at any time at the discretion of the initiator of such a request.
Sec. 13-107. Special notice and procedural requirements for certain residential zoning decisions.
(a) Zoning decisions to which this section applies. In accordance with O.C.G.A. 36-66- 4(h), the following zoning decisions shall be adopted in a manner consistent with the notice and procedural requirements of this section:
1. Any decision to amend the zoning ordinance (i.e., this land use management code) to revise one or more zoning classifications or definitions relating to single-family residential uses of property so as to authorize multifamily uses of property pursuant to such classification or definitions; and
2. A decision that grants blanket permission, under certain or all circumstances, for property owners to deviate from the existing zoning requirements of a single-family residential zoning classification; and
3. Any zoning decision that provides for the abolition of all single-family residential zoning classifications within the territorial boundaries of the city; and
4. Any zoning decision that results in the rezoning of all property zoned for singlefamily residential uses within the territorial boundaries of the city to multifamily residential uses of property.
(b) Exclusion. This section shall not apply to zoning decisions for the rezoning of property from a single-family residential use of property to a multifamily residential use of property when the rezoning is initiated by the owner or authorized agent of the owner of such property.
(c) Procedures and requirements.
1. The zoning decision shall be adopted at two regular meetings of the local government making the zoning decision, during a period of not less than 21 days apart.
2. Prior to the first meeting provided for in subparagraph (1) of this paragraph, at least two public hearings shall be held on the proposed action. Such public hearings shall be held at least three months and not more than nine months prior to the date of final action on the zoning decision. Furthermore, at least one of the public hearings must be held between the hours of 5:00 P.M. and 8:00 P.M.
3. The two public hearings required by this paragraph shall be in addition to the single public hearing otherwise required under the zoning procedures law for a zoning decision generally.
4. For these two public hearings, the local government shall give notice of such hearing by: (i) posting notice on each affected premises in the manner otherwise required under the zoning procedures law; provided, however, that when more than 500 parcels are affected, in which case posting notice is required every 500 feet in the affected area; and (ii) publishing in a newspaper of general circulation within the territorial boundaries of the city a notice of each hearing at least 15 days and not more than 45 days prior to the date of the hearing.
5. Both the posted notice and the published notice shall include a prominent statement that the proposed zoning decision relates to or will authorize multifamily uses or give blanket permission to the property owner to deviate from the zoning requirements of a single-family residential zoning of property in classification previously relating to single-family residential uses. The published notice shall be at least nine column inches in size and shall not be located in the classified advertising section of the newspaper. The notice shall state that a copy of the proposed amendment is on file in the office of the clerk or the recording officer of the local government and in the office of the clerk of the superior court of the county of the legal situs of the city for the purpose of examination and inspection by the public.
6. The local government shall furnish anyone, upon written request, a copy of the proposed amendment, at no cost.
[Sec. added via amendment, Ord. 23-04, adopted May 16, 2023]
DIVISION II
AMENDMENT TO THE OFFICIAL ZONING MAP (REZONING)
rezonings.
Sec. 13-201. Generally.
The official zoning map of this UDC, and any overlay district map established in this UDC may be amended from time to time by the Statham City Council following the procedures in this division. In addition, changes to conditions of approval pertaining to any conditions of rezoning approval may also be approved by the City Council following the procedures in this Division.
Sec. 13-202. Initiation of rezoning application.
(a) An application to amend the official zoning map or overlay district map, or a condition of zoning approval may be initiated by the Statham City Council.
(b) A private property owner may file an application to amend the official zoning map or to change conditions of zoning approval, as it pertains to the property owned, in accordance with the requirements of this division.
Sec. 13-203. Rezoning application requirements.
Applications to amend the official zoning map or to change conditions of zoning shall require submittal of an application meeting requirements specified in this section. The zoning administrator may waive the application fee and certain application requirements specified in this section when an application for amendment of the official zoning map or change of zoning conditions is initiated by the Statham City Council.
(a) Application fee as established by resolution of the Statham City Council;
(b) Application form furnished by the zoning administrator, including signed and notarized signature of property owner;
(c) Metes and bounds legal description of the property;
(d) Survey plat of the property;
(e) Letter of intent describing the proposed use of the property, and including an analysis of how the proposed action compares to decision criteria specified for rezoning decisions in this division and a description of any special conditions voluntarily made a part of the request;
(f) Sketch plan of the property at an appropriate engineering scale prepared by the applicant, a professional engineer, a registered land surveyor, a landscape architect, a land planner or any other person familiar with land development activities showing the following information:
1. Name, address, telephone number and e-mail address of the property owner, and of the applicant if different from the property owner;
2. If drawn on a boundary survey, the date of survey and source of data;
3. Date of sketch plan drawing, and revision dates, if applicable;
4. North arrow and graphic engineering scale;
5. Location (land district, address, and tax map and parcel number) and size of the property in acres (or in square feet if less than an acre);
6. Vicinity map, showing the property in relation to the surrounding area with regard to well-known landmarks such as arterial streets or railroads. Vicinity maps may be drawn in freehand and at a scale sufficient to show clearly the information required.
U.S. Geological Survey maps at a scale of 1 inch equals 2,000 feet may be used for vicinity maps.
7. Zoning district classification of the subject property and all adjacent properties;
8. Man-made features within and adjacent to the property, including existing streets and names, county and city limit lines, and other significant information such as location of bridges, major utility lines, existing buildings and structures to remain, and other features as appropriate to the nature of the request;
9. The proposed project layout, including the approximate location of all buildings, and the location of all minimum building setback lines, outdoor storage areas, buffers, parking areas, driveways, and approximate location of proposed storm water detention facilities;
10. Proposed use or uses of the property;
11. A statement from the utility provider(s) as to the source of water supply and the provision for sanitary sewage disposal;
12. Statistics regarding the proposed development, such as but not limited to maximum building height, minimum lot size, minimum lot width, building coverage, percentage of landscaped open space, stream and zoning buffers required, and other information demonstrating compliance with the proposed zoning district’s dimensional requirements as determined by the zoning administrator;
(g) A traffic impact study prepared by a professional engineer registered in Georgia shall be required to be submitted for applications for proposed developments that generate 1,000 or more average daily vehicle trips based upon the latest edition of Trip Generation published by the Institute of Transportation Engineers. A traffic study, a hydrology study, and/or other studies of the impact of the proposed zoning district or development implied in the rezoning application may be recommended by the zoning administrator or required by the Statham City Council as they may deem necessary for adequate consideration and a fully informed decision on an application for rezoning;
(h) The zoning administrator may require a letter of water and/or sanitary sewer availability from the utility provider.
(i) Other information as may be required by the zoning administrator.
Sec. 13-204. Review for completeness.
The zoning administrator shall review the application for completeness within 7 working days of the posted application submission deadline. Incomplete applications will be returned to the applicant and shall not be processed.
Sec. 13-205. Published notice of public hearing.
At least 15 but not more than 45 days prior to the date of the public hearing before the Statham City Council, the city shall cause to be published within a newspaper of general circulation within the city and county a notice of the public hearing before the Statham City Council. The notice shall state the time, place, and purpose of the public hearing. The published notice shall include the location of the property, the present zoning classification of the property, and the proposed zoning classification of the property requested.
Sec. 13-206. Public hearing notice – sign on property.
(a) Requirement and locations. The applicant shall be required to post and maintain signs supplied by the city near the right-of-way of the nearest public street, so as to be visible from the street preceding the date of the planning commission’s public hearing and for at least 15 days and not more than 45 days immediately preceding the date for the Statham City Council’s public hearing on the rezoning application. One such sign shall be placed in a conspicuous location along each street frontage of the property for which the rezoning has been requested. If the property has no street frontage, the sign shall be placed on each street where access to the property will be gained.
(b) Content. The sign providing notice shall state the time, place, and purpose of the public hearing and shall include the location of the property. In addition, the notice shall include the existing zoning classification and the proposed zoning classification of the property.
(c) Time period. It is the responsibility of the applicant to post the signs and to maintain the signs during the posting period. Said signs pertaining to the Statham City Council’s public hearing shall remain posted until a final decision by the Statham City Council has been rendered.
(d) Consequences of non-maintenance. Failure to post and maintain the signs continuously may prohibit consideration of the application at any scheduled public hearing. In the event the signs are not posted continuously, the city, in its sole discretion, may require the reposting and readvertising prior to any future public hearing, for which the applicant shall pay an additional readvertising fee. The city may also in its sole discretion, continue, hold, or dismiss the application if public notice requirements are not met due to applicant non-maintenance of the required public notice sign(s) on the property.
Sec. 13-207. Special notice requirements for halfway houses and related uses.
This section is adopted pursuant to the specific requirements of the state zoning procedures law.
When a proposed zoning map amendment relates to or will allow the location or relocation of a halfway house, drug rehabilitation center, or other facility for treatment of drug dependency, a duly noticed public hearing shall be held by the Statham City Council on the proposed action in accordance with the procedures and requirements established in this article. In addition, the following requirements shall apply.
(a) Such public hearing before the Statham City Council shall be held at least six months but not more than nine months prior to the date of final action on the application.
(b) All published or posted notices of the public hearing shall include a prominent statement that the proposed zoning map amendment relates to or will allow the location or relocation of a halfway house, drug rehabilitation center, or other facility for treatment of drug dependency.
(c) The published notice shall be at least six column inches in size and shall not be located in the classified advertising section of the newspaper.
Sec. 13-208. Investigations and recommendation.
(a) The zoning administrator may send the application out for review by internal city departments and external agencies as may be appropriate (i.e., inter-agency review). Any written comments received in a timely manner shall be submitted to the applicant, and the Statham City Council for consideration, and any such comments shall become an official public record.
(b) The zoning administrator shall investigate and make a recommendation regarding any or all of the relevant matters concerning the application. Any such investigation and recommendation shall if in writing be made available to the applicant, and the Statham City Council prior to public hearing and shall become an official public record.
Sec. 13-209. Public hearings.
The Statham City Council shall hold a public hearing on all rezoning applications in accordance with the public hearing procedures specified in this article.
Sec. 13-210. Standards for rezoning decisions.
The Statham City Council should consider the following standards for any rezoning proposal, giving due weight or priority to those factors that are appropriate to the circumstances of each proposal:
(a) Is the proposed use consistent with the stated purpose of the zoning district that is being requested?
(b) Is the proposed use suitable in view of the zoning and development of adjacent and nearby property?
(c) Will the proposed use not adversely affect the existing use or usability of adjacent or nearby property?
(d) Is the proposed use compatible with the goals, objectives, purpose and intent of the comprehensive plan?
(e) Are there substantial reasons why the property cannot or should not be used as currently zoned?
(f) Will the proposed use not cause an excessive or burdensome use of public facilities or services, including but not limited to streets, schools, water or sewer utilities, and police or fire protection?
(g) Is the proposed use supported by new or changing conditions not anticipated by the comprehensive plan or reflected in the existing zoning on the property or surrounding properties?
(h) Does the proposed use reflect a reasonable balance between the promotion of the public health, safety, morality, or general welfare and the right to unrestricted use of property?
Sec. 13-211. City Council decision.
(a) Time frame for decision. Within sixty-five (65) calendar days of the date of its public hearing held by the Statham City Council, the Statham City Council shall render a decision on the application for rezoning. This time limit may be extended if the applicant consents to extend the time frame.
(b) Decision. The Statham City Council may approve or disapprove the proposed rezoning as applied for, or it may approve the application with conditions. The Statham City Council may also rezone the property to a more restrictive zoning classification than requested by the applicant. The Statham City Council may also reduce the boundaries of the area rezoned to an area that is less than that requested by the applicant.
(c) Consideration of information. In rendering a decision on any such application, the Statham City Council shall consider information supplied by the applicant and the zoning administrator, as well as testimony and information accepted during public hearing.
Sec. 13-212. Withdrawal of application.
(a) No refund. There shall be no refund by the city of an application fee if an application is withdrawn.
(b) Prior to public notice. If a request for withdrawal is received prior to the publication of a notice for a public hearing, the application shall be withdrawn administratively by the zoning administrator without restriction on the refiling of a rezoning application on the property in the future, as described in this division.
(c) After public notice. If a request for withdrawal is received after publication of a public notice has been published or when such public notice irretrievably set for publication but the rezoning application has not been heard by the Statham City Council, the application shall be withdrawn administratively by the zoning administrator, provided that an application for a rezoning of the property shall not be resubmitted for 6 months from the date of withdrawal.
Sec. 13-213. Limitations on the frequency of filing applications.
(a) No rezoning application affecting the same or any portion of property which was denied by the Statham City Council shall be accepted for filing by a property owner until 12 months shall have elapsed from the date said application was denied by the Statham City Council, unless the Statham City Council reduces the 12 month time period to no less than 6 months.
(b) The same or any portion of property previously considered in a rezoning application which was denied by the Statham City Council may not be initiated again by the Statham City Council until the expiration of at least 6 months immediately following the final decision rendered on the application by the Statham City Council.
Sec. 13-214. Concurrent consideration of applications.
In cases where an applicant is proposing a rezoning (i.e., amendment to the official zoning map), and where the applicant files an application to obtain a conditional use at the same time of filing a rezoning application, the two applications may be processed simultaneously, but the conditional use application shall not be voted on until the rezoning application is voted on (which may be the same public hearing or meeting), since the conditional use would not otherwise be permitted without the rezoning.
Sec. 13-215. Amendments to application.
(a) Amendments generally. An applicant may amend their application at any time prior to the conveying of a public hearing by filing an amended application with the zoning administrator that meets all the requirements of Section 13-203 of this UDC.
(b) Amendments after public hearing. After five calendar days following the Statham City Council’s public hearing on an application, no amendment to the application, proposed site plan, or other document may be submitted, and the City Council shall not consider any proposed amendments or changes to the proposed use or site plan made after the five calendar days following the conclusion of the public hearing. This limitation shall not apply where the public hearing is tabled at the public hearing.
[Sec. added via amendment, Ord. 22-01, adopted March 15, 2022] Sec. 13-216. Special notice and procedural requirements for certain city- initiated residential rezonings.
(a) When initiated by the city, any zoning decisions for the rezoning of property from a single-family residential use of property to a multifamily residential use of property shall be adopted in a manner consistent with the notice and procedural requirements of Section 13-107 of this Unified Development Code.
(b) This section shall not apply to zoning decisions for the rezoning of property from a single-family residential use of property to a multifamily residential use of property when the rezoning is initiated by the owner or authorized agent of the owner of such property.
[Sec. added via amendment, Ord. 23-04, adopted May 16, 2023] Sec. 13-301. Generally.
The Statham City Council following the procedures in this division may approve conditional uses authorized in Table 2-2 of this UDC. In addition, changes to conditions of approval pertaining to any conditions of conditional use approval may also be approved by the Statham City Council following the procedures in this division.
Sec. 13-302. Initiation of conditional use application.
A private property owner may file an application for conditional use approval, as it pertains to the property owned, in accordance with the requirements of this division.
Sec. 13-303. Conditional use application requirements.