Stockbridge · Zoning Ordinance
Title 12 - UNIFIED DEVELOPMENT CODE / Chapter 13 - TREE PROTECTION
13.5. Procedures.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Application Requirements.
1. Pre-Application Conference. Prior to submission of an application for development, the applicant is required to meet with the director or his/her designee to discuss the tree protection ordinance as it relates to the applicant's property. The purpose of the pre-application conference is to clarify the provisions and procedures of the tree protection ordinance and review applicable standards and guidelines for the submittal of documents and required tree protection, replacement, and maintenance measures.
2. Tree Survey. Except as provided elsewhere in this section, a tree survey prepared and sealed by a registered surveyor or certified engineer, arborist or landscape architect, shall be required as part of any application for a land disturbance permit, development permit, building permit or preliminary subdivision plat. All trees eight (8) inches (DBH) and larger shall be identified. Specimen trees shall be identified by size, species, and location with an indication whether they are to be retained or removed. Trees larger than two (2) inches (DBH) may be identified and counted for unit credit on the tree protection plan. All specimen trees and all trees that are to be counted toward meeting density requirements must be shown on the survey and inventoried by size (caliper or DBH, whichever is applicable) and species. All tree protection zones and tree save areas must be delineated on the plan. All buffers with existing trees must be delineated on plans as tree save areas. With the prior approval of the director or his/her designee, sampling methods may be used to determine tree densities for forested areas.
B. Tree Protection Plan. A tree protection plan shall be submitted with other permit drawings as part of the development permits process. This plan may either be a separate drawing, or part of a landscape plan, and shall include the following information:
1. Definition of spatial limits:
a. Limits of land disturbance, clearing, grading, and trenching;
b. Tree save areas;
c. Specimen trees; and
d. Areas of revegetation.
2. Detailed drawings of tree protection measures and their location:
a. Location, species, and size (DBH) of existing significant trees and an indication of which significant trees would remain on the site;
b. Tree fences;
c. Erosion control fences;
d. Tree protection signs;
e. Tree wells;
f. Aeration systems;
g. Transplanting specifications;
h. Staking specifications; and
i. Other applicable drawings as determined by the director or his/her designee.
3. The tree protection plan shall show all utility lines existing and proposed, including irrigation and electric lines. The applicant shall coordinate the location of these utility lines with the utility companies to prevent root damage within the critical root zones of protected trees, and to minimize damage to trees located in protected zones.
4. Procedures and schedules for the implementation, installation, and maintenance of tree protection measures.
5. Calculations of tree density proposed on site per [Section 13.6], Tree Preservation and Replacement Requirements.
6. Tree Protection Inspection. Following the receipt of a complete application, the director or his/her designee shall schedule and conduct an inspection of the proposed development site. The applicant or applicant's designee shall be advised as to the date and time of the inspection and given an opportunity to participate.
7. Following inspection said plans shall be reviewed by the director or his/her designee for conformance with applicable zoning conditions, the tree protection ordinance, and any applicable administrative guidelines, and will either be approved or denied. Reasons for denial shall be noted on the tree protection plan or otherwise stated in writing.
8. No development or building permit shall be issued until the tree protection plan has been approved by the director or his/her designee.
9. All tree protection measures shall be installed prior to land disturbance.
C. Final Inspection. No certificate of occupancy shall be issued by the director or his/her designee with respect to any permit subject to this section unless and until the director or his/her designee shall have inspected the site and confirmed that all existing trees to remain are in healthy condition and all replacement trees have been planted in accordance with this section.
D. Issuance of a building or land development permit shall be conditioned on the approved tree protection plan and conformance to the provisions of these regulations. Any permit may be voided if its terms are violated.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.