After completion of the physical development of the subdivision, the developer shall contact the building department for a checklist that specifies the procedure in obtaining the various approvals from county departments which will release the subdivision for final plat consideration. As part of this process, the developer/subdivider shall submit a final plat and as-built drawings, including those for sewer, water, detention ponds and stormwater systems, and roads. As-built drawings shall be submitted in electronic form in a format to be determined by the city. The developer shall also be responsible for providing an electronic copy of as-built water and sewer system drawings to the Henry County Water and Sewerage Authority.