Upon completion of the development, the applicant is responsible for: A. Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis; B. Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer; C. Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan; and D. Delivering to the City of Stockbridge a signed inspection and maintenance agreement that has been recorded by the owner in the property record for all parcel(s) that make up the site. The required certification under Subsection A. shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Stockbridge with the request for a final inspection. The City of Stockbridge shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities.