An engineering study is required, as appropriate, to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of subsection 15.9.21 apply. This study shall be prepared by a currently registered professional engineer in the State of Georgia and made a part of the application for a permit. This information shall be submitted to and approved by the department designated by the Henry County Board of Commissioners prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include: A. Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development; B. Step-backwater analysis, using a FEMA-approved methodology and approved by the department designated by the city. Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles; C. Floodplain storage calculations based on cross-sections (at least one (1) every one hundred (100) feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development; and D. The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.