A. Purpose and Intent. Understanding the demands placed on the city's transportation network by development is an important dimension of assessing the overall impacts of development. All development generates traffic, and it may generate enough traffic to create congestion and thus require the community to invest more capital funds into the transportation network in the form of new roads, traffic signals, and intersection improvements. Traffic congestion results in a number of problems, including economic costs due to delayed travel times, air pollution, and accidents. By requiring traffic impact studies for proposed developments meeting certain thresholds, the city will be better able to determine the transportation demands of development proposals and provide for reduction of adverse impacts on the transportation system. B. Objectives. The city finds that requiring a traffic impact study for proposed developments that meet certain thresholds will help to achieve the following objectives: 1. To foster and support the coordinated and comprehensive transportation plan. 2. Provide transportation investments that reinforce the land use plans and development vision of the city. 3. Forecast additional traffic associated with new development based on accepted practices. 4. Determine the improvements that are necessary to accommodate new development. 5. Allow the city government to asses the impacts that a proposed development may have and assist the city government in making decisions regarding development proposals. 6. Help so ensure safe and reasonable traffic conditions on streets after the development is complete. 7. Reduce the negative impacts created by developments by helping to ensure that the transportation network can accommodate the development. 8. Protect the substantial public investment in the street system. 9. Provide information relevant to comprehensive planning, transportation planning, and future transit planning, and the provision of programs and facilities for traffic safety, road improvements, transportation demand management, pedestrian access, and other transportation system considerations. C. Thresholds of Applicability. A traffic impact study shall be required for all developments that are expected to generate more than one hundred (100) new trips during a morning or evening peak hour or more than seven hundred fifty (750) new trips in an average day or involves the construction of fifty thousand (50,000) square feet or greater of nonresidential building space, in single or multiple phases. Developments of regional impact (DRIs) are exempt from the aforementioned criteria. All DRIs shall adhere to the guidelines set forth by the Georgia Department of Community Affairs (DCA). The traffic study shall be prepared in accordance with industry accepted standards, including, at a minimum, level of service impacts for adjacent roadways and intersections and a mitigation package to address the cumulative effects from the project's impact. Said applicant shall be also required to coordinate and fund any recommended mitigation measures limited to project related improvements with applicable Federal, State, and local agencies, including the Georgia Regional Transportation Authority (GRTA) and the Atlanta Regional Commission (ARC). The determination of a traffic study shall be made during the zoning request stage or during the phase in which a site plan is submitted for a land disturbance permit. The director or his/her designee shall notify the appropriate departments within five (5) business days. Traffic impact studies shall be required for submittal during the land disturbance stage and shall not be required during the zoning process. D. Exemptions. 1. A traffic impact study is not required if a development proposal is initiated by the city. 2. Any development of regional impact (DRIs) the complies with the rules of the Georgia Department of Community Affairs (DCA), the Atlanta Regional Commission (ARC), and Georgia Regional Transportation Authority (GRTA) shall be exempt from this chapter. 3. A traffic impact study will not be required by the city for those developments with frontage and access along a State route. E. Trip Generation Data. The source for trip generation rates for the purposes of this chapter shall be the most recent edition of "Trip Generation" published by the Institute of Transportation Engineers (ITE), unless otherwise approved by the director. Determinations of whether this chapter applies shall be made based on application of data from ITE Trip Generation, which may change from time to time, or as otherwise approved by the director. F. Determination of Applicability. At the time a development proposal is filed, or during any pre-application meeting for zoning proposal, exclusive of variances and modifications to a zoning condition, the director shall determine whether a traffic impact study shall be required according to this section. Applicants for development proposals shall provide sufficient information about the development proposal (e.g., number of dwelling units, square footage of buildings, number of employees, land area of the development, etc.) for the director to apply professionally accepted trip generation rates to the proposed development. All traffic studies shall be required to be submitted before the issuance of any development permits, including, but not limited to, a land disturbance, clearing and grading, building permit, and/or development permit. G. Cases Where Data is Not Available. If information submitted by the applicant of the development proposal is sufficient to calculate the trip generation that would be expected to result from the proposed development, but trip generation rates or other data are not available or in sufficient quantity of studies to make a determination of applicability, then under the terms of this section, the following shall apply: 1. The director shall determine if: a. Professionally acceptable trip generation rates applicable to the subject development exist from other reputable sources, such as the Journal of the Institute of Transportation Engineers; b. Other trip generations studies of similar development are available; or c. Professionally acceptable trip generation rates for one (1) or more similar land uses can be used in making the determination of applicability. H. Specifications for Peak-Hour Trip Generation Studies. 1. Discounting of "Pass-By" Trips. The peak-hour trip generation study may subtract from the empirical data on actual vehicle trips if those trips are reasonably considered to be "pass-by" trips as defined by this chapter, using professionally accepted assumptions about the percent of "pass-by" trips approved by the director. 2. Reduction for Internal Trips in Multiuse or Mixed-Use Development. In calculating the new trips generated from a proposed development containing multiple uses or mixed-use a qualified professional with the approval of the director my apply a percentage reduction to the total vehicle trips shown in any peak hour trip generation study to account for internal trips, as defined in this chapter, so as to account for (discount) the number of internal trips reasonably expected to occur in such multiuse or mixed-use development. Said reduction shall not exceed twenty-four percent (24%) of total trips generated. I. Study Scope Meeting. Once it is determined that a traffic impact study is required, a scope meeting must be held with the developer or his or her consultant and the appropriate representatives of the city. It will be the responsibility of the developer or his or her consultant to initiate this meeting. The purpose of this meeting is to discuss the availability of site-specific information concerning the development, available forecasts of traffic volumes, and to ensure the applicant understands the content requirements for traffic impact studies. J. Required Contents of a Traffic Impact Study. A traffic impact study must evaluate the adequacy of the existing transportation system to serve the proposed development and determine the expected effects of the proposed development on the transportation system. The traffic impact study must provide adequate information for city staff to evaluate the development proposal and, when appropriate, recommend conditions of approval. The qualified professional preparing the traffic impact study is encouraged to coordinate preparation with city staff and staff from other jurisdictions, as appropriate, to ensure that all necessary components are included in the traffic impact study and to reduce revision and review time. To be reviewed, the traffic impact study must include the following minimum components: 1. Title Page. A title page listing the name of the proposed development and its location. 2. Table of Contents. A table of contents outlining the study shall be provided. 3. Certification. The study shall be signed and stamped by a qualified professional. 4. Executive Summary. An executive summary discussing the development, the major findings of the analysis, and recommendations made by the qualified professional shall be provided. 5. Vicinity Map. A vicinity map showing the location of the proposed project in relation to the transportation system of the area. 6. Study Area Map. A map of the traffic impact study area. For the purposes of this chapter, the traffic impact study area shall be determined according to trip generation rates as follows. In the event there is a difference because of applying peak and total trips, the more restrictive requirement (larger study area) shall apply. Study Area Size Requirements Peak Hour Trips Generated | Daily Trips Generated | Distance from Perimeter of Proposed Development Along Roads 100—150 | 750—1,500 | ½ mile 151—500 | 1,501—5,000 | 1 mile 501—1,000 | 5,001—10,000 | 2 miles 1,001 or more | 10,001 or more | 3 miles 7. Inventory of Transportation Facilities in the Study Area. A description of transportation facilities in the study area, including roadway names, locations, and functional classifications, intersection lane configurations, traffic control (including signal timing), existing rights-of-way, transit routes and stops (if any), pedestrian and bicycle facilities, and planned transportation system improvements. An existing lane configuration sketch shall be submitted for all roadways intersections within the study area. 8. Site Plan and Development Data. A complete description of the proposed development, including a site plan with the best available information as to the nature and size of each proposed used and the proposed location and traffic control of all proposed access points, including the distance from all proposed access points to adjacent access and/or streets, including those across a street right-of-way from the subject development. 9. Existing Traffic Volumes. Peak and total daily traffic volumes on all arterial, collector, and local streets within the study area. Traffic counts should be no more than one (1) year old when the report is prepared. Traffic counts between one (1) and three (3) years old may be used if factored to the current year. Traffic counts older than three (3) years will not be accepted. Utilizing available data from an industry accepted source, i.e., Georgia Department of Transportation, Henry County Department of Transportation, City of Stockbridge, or Atlanta Regional Commission. 10. Facility Performance. Existing performance of the transportation system, including levels of service (LOS) and volume/capacity ratios (V/C) for all intersections and road segments, as appropriate, within the study area. Identification of any project related improvements necessary to mitigate the impact on the level of service (LOS) for the abutting roadways and unsignalized/signalized intersection resultant from the trips generated by the proposal. 11. Trip Generation. Complete trip generation figures for all aspects of the proposed development. The source for trip generation rates shall be most recent edition of "Trip Generation" published by the Institute of Transportation Engineers (ITE), unless otherwise approved by the director. If phased development is proposed, the study shall include projections for the year that each phase of the development is planned to be complete. The traffic impact study shall also include trip generation data for any pending and approved developments that would affect the study area. The city staff shall facilitate the review of applicable files by a qualified professional to determine the names and development characteristics of pending and approved developments in the study area. 12. Trip Distribution and Assignment. Trip distribution for the proposed development. For developments expected to generate more than thirty (30) truck trips per day, the study shall include separate trip distribution figures for trucks. 13. Forecast Performance Without the Development. Forecast performance, including levels of service (LOS) and volume/capacity (V/C) ratios of the transportation system without the development in the year that each phase is planned to be complete and in the horizon year. 14. Forecast Traffic Volumes with the Development. Forecast traffic volumes with the development, on all arterial, collector, and local roads within the study area, in the year that the proposed development is planned to commence and in the horizon year. 15. Forecast Performance with the Development. Forecast performance, including levels of service (LOS) and volume/capacity (V/C) ratios of the transportation system with the development in the year that each phase is planned to be complete and in the horizon year. 16. Sight Distance. A safety analysis of the site accesses and an assessment whether adequate sight distances are provided at driveways and streets abutting the development. 17. Operational Characteristics. Analysis of prevailing operating speeds, if significantly different than speed limits, right and left turn lane warrants, queue lengths, acceleration and deceleration lanes, including lengths and tapers, throat lengths, channelization, and other characteristics of the site accesses, which exist and may be needed, as appropriate. The traffic impact study shall address whether driveways and intersections are located and spaced safely and designed to accommodate expected traffic volumes and maneuvers. The operational characteristics analysis shall also evaluate the turning and traveling characteristics of the vehicles that will be using the proposed development and the adequacy of the geometrics of the existing and proposed roadway (public and/or private) configurations to accommodate these characteristics. 18. On-Site Circulation. The traffic impact study shall address whether on-site vehicular and pedestrian circulation and parking layouts are safe and efficient. 19. Significant Impacts. Analysis as appropriate of any potential adverse or controversial effects of the proposed development on the transportation system in the area. Examples of possible effects include, but are not limited to, infiltration of nonresidential traffic into residential neighborhoods, traffic noise, creation of potential for traffic violations, conflicting turning movements with other driveways, any new pedestrian or bicycle transportation needs arising from the development, etc. 20. Mitigation Measures and Costs. Listing of all intersections and road segments that are forecasted to be level of service "E" and "F" in the horizon year, or if phased, in the years that each phase is planned to be complete, and an identification and description of specific mitigation measures, including signal, turn lane, or other warrant analyses as appropriate and necessary to bring these intersections and road segments into compliance with a level of service "C" or other city adopted level of service for said road segment or intersection. Should the proposed development reduce the level of service, mitigation factors must be included and will be included as a condition of final plat approval. If roadway improvements are needed, the study shall show a drawing at an engineering scale of one (1) inch equals twenty (20) feet for all recommended lane configurations. If signalization is warranted by the traffic signal warrants outlined in the Manual on Uniform Traffic Control Devices (MUTCD), a warrant analysis shall also be conducted as a part of the traffic impact study. If a traffic signal is warranted, the warrant package in the study shall show a drawing at an engineering scale of one (1) inch equals twenty (20) feet detailing the signal design and phasing plans. The estimated cost associated with implementing all such mitigation measures shall be provided in the traffic impact study. The traffic impact study may consider any city/county/State-approved roadway, traffic signalization and other improvements in determining mitigation measures and providing recommendations. 21. Alternative Transportation. Alternative transportation (sidewalk, bicycle, transit) needed because of the study, shall be identified. 22. References. A listing of all technical documents and resources cited or consulted in preparing the traffic impact study. 23. Technical Appendix. Relevant technical information, including, but not limited to, copies of raw traffic count data used in the analysis, calculation sheets and/or computer software output for all LOS and V/C calculations in the analysis, warrant worksheets for signals, turn lanes, and signal phasing, etc. used in the analysis. K. Additional Technical Specifications. The director is further authorized to promulgate and require the use of additional technical specifications for conducting traffic impact studies, which shall be consistent with analysis methods included in the most recent Highway Capacity Manual, Manual on Uniform Traffic Control Devices, and/or Traffic Access and Impact Studies for Site Development: A Recommended Practice (Washington, DC: Institute of Transportation Engineers, 1991), as may be amended or republished from time-to-time. L. Costs and Fees. The city assumes no liability for any costs or time delays (either direct or consequential) associated with the preparation and review of traffic impact studies. There shall be no application review fee for a traffic impact study. M. Submittal and Review of Study. The applicant for the proposed development or the qualified professional shall submit one (1) electronic copy of the traffic impact study and technical appendix, three (3) paper copies of the traffic impact study, and one (1) paper copy of the technical appendix to the director. The director shall review all calculations and analyses and determine if they are complete, reasonable, understandable, consistent, and fully explained. The conclusions presented in the traffic impact study shall be consistent with and supported by the data, calculations, and analyses in the report. Calculations, graphs, tables, data, and/or analysis results that are contrary to good common sense or not consistent with and supported by the data will not be accepted. In such events, the director shall return the traffic impact study to the development applicant for correction. N. System Improvements. The director shall include system improvement recommendations in the conditions for approval of the development plan.