--- title: Stockbridge Zoning Ordinance, 16.6. Construction requirements for residential, industrial, and commercial subdivision streets collection: local-codes id: local-code:stockbridge/zoning/16.6 cite_as: Stockbridge, Ga., Zoning Ordinance § 16.6 canonical_url: https://georgiacommons.org/code/local/stockbridge/zoning/16.6 md_url: https://georgiacommons.org/code/local/stockbridge/zoning/16.6.md text_url: https://georgiacommons.org/code/local/stockbridge/zoning/16.6/text source_url: https://library.municode.com/ga/stockbridge/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:stockbridge jurisdiction_name: Stockbridge place_fips: "1373704" corpus_version: local-codes-stockbridge-41fbfc65f02e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/stockbridge/zoning/~title-12/~chapter-16.md previous: https://georgiacommons.org/code/local/stockbridge/zoning/16.5.md next: https://georgiacommons.org/code/local/stockbridge/zoning/16.7.md index: https://georgiacommons.org/code/local/stockbridge.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:stockbridge/zoning/16.6@2026-11-14-b5be9eb0f5 --- # Stockbridge Zoning Ordinance, 16.6. Construction requirements for residential, industrial, and commercial subdivision streets > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. > Tables are shown as their rows, with the cells separated by a bar ( | ). Part of: Title 12 - UNIFIED DEVELOPMENT CODE / Chapter 16 - INFRASTRUCTURE IMPROVEMENTS The grading, base, and pavement for street construction shall be as follows: A. Grading. All streets shall be graded to the elevations shown on the approved construction plans. 1. The contractor may begin clearing and grubbing the project after: a. A development permit has been issued by the city; b. A pre-construction conference has been held, the director or designee duly notified; and c. All required silt and erosion control measures have been installed and approved. 2. Clearing and Grubbing. a. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project. b. A thirty-foot undisturbed buffer shall be maintained on all property lines prior to submission of construction plans. c. No rubbish or other material resulting from the clearing and grubbing of the roadway shall be buried at the site. d. If burning is permitted, all burn pits shall be located outside of the roadway construction limits. After burning, the pit shall be cleared out. A city inspection is required prior to backfilling and must be shown on the final plat. 3. Excavation. a. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material for the roadway with the top twelve (12) inches compacted to one hundred percent (100%) maximum dry density, ninety-five percent (95%) below the top. b. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of twelve (12) inches and backfilled with suitable material. c. All rock and boulders in the roadbed shall be excavated and the space backfilled to the correct grade with suitable material. d. Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the director and then under his/her supervision. e. During the construction of the roadway on a day-to-day basis, the roadbed edges shall be kept lower than the center and the grading shall be done so that the surfaces of the excavated areas and fill shall be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes. 4. Placement of Fill. a. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed. b. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill is begun. c. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six (6) inches. d. Before the placement of fill material is begun, all loosened soil shall be compacted the approximate density of the underlying soil. e. Where a depth of fill and surfacing is three (3) feet or less, the original ground shall be compacted a minimum twelve (12) inches deep to at least ninety-five percent (95%) of the maximum laboratory dry density as determined from representative samples of the material being compacted. f. In areas where layers of organic or other unstable materials exist, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material. g. All fill material shall be deposited and spread in uniform horizontal layers, no more than six (6) inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers, or other approved equipment. h. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. i. Fills shall be compacted to at least ninety-five percent (95%) of the maximum dry density to within the top twelve (12) inches of the fill. The top twelve (12) inches of the fill shall be compacted to at least one hundred percent (100%) of the maximum dry density. j. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers. k. While the work is in progress, contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface. l. The contractor shall have available on the job at all times at least one (1) motor patrol grader with adequate power to blade and maintain the roadbed. 5. Final Finishing of Roadway. a. After all excavation has been completed and all fills have been placed, the entire road bed surface shall be finally shaped with a grading machine supplemented with hand work whenever required to secure a smooth surface and uniform cross-section. b. Slopes of cuts and fills shall also be carefully shaped to the true section specified. c. When final shaping is finished, the road surface shall conform accurately to the line, grade, and cross-section shown of plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top twelve (12) inches of the finished roadbed. d. All ditches and drains shall be opened to effectively drain the roadway. B. Placement of Curb and Gutter. 1. After sanitary sewer lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the director or designee, and the centerline profile has been approved, the installation of the concrete curb and gutter may begin. 2. Any curb and gutter which does not conform to a true section, texture, line, and grade shall be removed and replaced as directed by the director or designee. 3. Water lines shall be installed after installation of the curb and gutter. C. Subgrade. 1. Before placing any pavement base, the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six (6) inches. If a subgrade stabilization material is required, then it shall be incorporated into the subgrade at this time. 2. After the material has been thoroughly mixed, the subgrade shall be brought into a proper line and grade and compacted to one hundred percent (100%) of maximum dry density just prior to placing the base material. 3. The centerline profile shall conform to the established elevations with an acceptable tolerance of one-half (½) inch. 4. The acceptance crown tolerance shall be one-half (½) inch. D. Base Construction. 1. The director shall be notified twenty-four (24) hours prior to the placing of any base material. 2. The director may authorize the placing of the base material after all equipment necessary for the proper construction of road base is on the project and the subgrade has been brought to the proper line, grade, and crown and compacted to the required density. 3. The director shall check the completed base course after the base material has been placed and compacted to the required density. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified or the exposed edge of the concrete gutter is less than the minimum depth required, shall be reshaped and rolled to obtain the required cross-section. 4. After the compacted material has been approved, field tests shall be taken by the field contractor and by a professional engineer as directed by the director to determine the thickness of the constructed base course. Tests shall be taken at four hundred (400) feet intervals alternating between each lane and center of roadway. Measurements shall be taken per GDT-42, Method of Test for Measurement of Thickness of Bases and Subbases. Areas found to be deficient in thickness shall be corrected as directed by the director or designee. No asphalt course shall be placed until deficiencies in base have been adequately addressed. 5. A copy of all delivery tickets for the graded aggregate base material shall be furnished prior to placing any asphaltic concrete paving material. A shortage in the base material used shall require that the asphaltic concrete surface course thickness be increased. 6. All work and materials shall be in accordance with the pertinent Graded Aggregate Construction sections of the Georgia Department of Transportation "Standard Specifications," latest edition. E. Soil Cement. A soil cement base may be used to improve the subgrade but shall not be used as a substitute for base construction. F. Paving. 1. The contractor shall begin the construction of the asphaltic concrete pavement upon approval of the road base by the director. 2. All asphaltic concrete material and construction shall be in accordance with the "hot mix asphaltic concrete construction" sections of the Georgia Department of Transportation "Standard Specifications," latest edition. 3. The director shall check the cross-section of the finished pavement. Any area found to be deficient shall be marked and a record of deficiencies made by the director or designee. 4. If, in the opinion of the director, the extent of deficiencies will impair the performance of the pavement, he/she shall direct that an overlay of a minimum thickness of one (1) inch be placed before the roadway is opened to traffic. 5. A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the director at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated, then the director or designee may require a minimum one-inch overlay of the streets. 6. As mentioned in subsection 16.6.D.4., the base thickness is to be measured and accepted by the city prior to placement of any asphalt course. The applicant shall have core tests made to verify the thickness and compaction of the two-inch asphalt pavement course. The minimum core diameter shall be such that compaction of the sample can be determined in the lab and subsequent data supplied to the director or designee. The compaction of the course shall be required to meet Georgia Department of Transportation (GDOT) specifications per the asphalt mix placed. If a two-course asphalt section is required, the cores for the binder layer shall be cut, reviewed, and approved by the director prior to placement of the topping lift. Also, in the event that a two-course asphalt section is required, the cores for the topping lift, if between one and one-half (1½) inch and one and one-quarter (1¼) inch in thickness, shall be made to determine the thickness only. All cores shall be made on four hundred-foot intervals, alternating between each lane and center of roadway. If these cores indicate a deficiency in thickness or compaction of the asphalt pavement, an overlay shall be required when the following deficiencies occur: a. When the number of cores deficient in thickness within the allowable one-quarter-inch tolerance, or deficient in compaction exceeds thirty-five percent (35%) of the total cores taken on one (1) street. b. When two (2) or more consecutive tests show a deficiency of more than one-quarter-inch allowable tolerance or a deficiency in compaction. When a core shows a deficiency in excess of the allowable tolerance or compaction additional cores shall be taken to delineate the area of the deficient thickness/compaction. 7. The applicant shall correct any deficiency with an overlay extending a minimum of one hundred fifty (150) feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement for a minimum of ten (10) feet at each end of the overlay. The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one and one-quarter-inch in compacted thickness. The type of material used in the overlay shall be specified by the director. G. Shoulder and Drainage Improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded, and mulched. An eighty percent (80%) stand of grass shall be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to ninety-five percent (95%) of maximum dry density. H. Compliance with Minimum Standards. Road design and construction for residential subdivisions shall comply with the minimum standards shown below in subsection 17.6.I. Acceleration and deceleration lane construction shall comply with the standards set forth in subsection 17.6.K. For roadways with more than one hundred fifty (150) lots of contributing traffic a pavement design is to be done and submitted to the city for review. The GDOT Asphalt Pavement Design program is an accepted method for the pavement design submittal for roadways with more than one hundred fifty (150) lots of contributing traffic. I. Table of Residential Subdivision Street Construction Standards. Residential Subdivision Street Roadway Standards Roadway Standards | Specifications Surface topping (plant mix) for roadways with 1 to 40 lots contributing traffic | 2-inch 12.5 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Surface topping (plant mix) for roadways with 41 to 100 lots contributing traffic | 1¼-inch 9.5 mm superpave mix with hydrated lime (Level 1), 137.5 pounds per square yard Surface topping (plant mix) for roadways with 101 to 150 lots contributing traffic | 1½ inch 12.5 mm superpave mix with hydrated lime (Level 1), 165 pounds per square yard Tack coat | 0.04—0.06 GAL/square yard Asphalt (binder course) for roadways with 41 to 150 lots contributing traffic | 2-inch 12.5 mm superpave mix or 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Add in "prime application" section to table | 0.20—0.25 GAL/square yard Curbs/shoulder and ditch construction | 24-inch x 6-inch concrete "L" back curb 18-inch gutter; 6 inches high, 6-inch curb width Base construction | 6-inch base (graded aggregate); 100 percent dry density compaction Subgrade | Top 12-inch subgrade compacted to 100 percent dry density Street width | 28 feet back of curb to back of curb Asphalt pavement width | 26 feet Street grade | 12 percent maximum on subdivision streets; 4 percent maximum grade at intersections—100 feet from curb line Turnaround area | 40 feet radius cul-de-sac pavement; 80 feet diameter Intersections | 25 feet pavement radius at intersection within subdivision; 25 feet pavement radius required when intersecting existing county or State roads. 75 [feet] exit curb radius when designing a dual lane exit. Right-of-way | 50 feet right-of-way minimum for local streets (additional right-of-way and/or slope easements may be required for cut and fill areas); 110 feet diameter right-of-way for cul-de-sac. A 5-foot utility easement is required along all street rights-of-way. Fill areas and back slopes | 2:1 maximum slope allowed (2:1 or flatter) Storm sewers and cross drains | See Sections 16.12 and 16.13 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management. Grassed areas | Shall comply with the erosion and sedimentation control requirements set forth in Section 16.5 Core testing | Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement. See subsections 16.6.D.4. and 16.6.F.6. Letter of credit or bond | 3-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit or bond if used for construction access to newer phases. J. Design and Construction Requirements. The design and construction requirements for subdivision developments for industrial, commercial, or office use and urban streets which are to be city arterial roads shall: 1. Be required to have concrete curb and gutter along each side. 2. Comply with the minimum standards shown below. K. Table of Industrial, Commercial, and Office Subdivision Street Construction Standards. Industrial, Commercial, and Office Subdivision Street Construction Standards | | | |----|----| | Roadway Standards | Specifications | | Surface topping plant mix | 1½-inch 12.5 mm superpave mix with hydrated lime (Level 1) asphalt topping, 165 pounds per square yard | | Tack coat | 0.04—0.06 GAL/yard | | Binder (office and commercial) | 3-inch 19 mm superpave mix with hydrated lime (Level 1)—330 pounds per square yard | | Binder (industrial) | 4-inch 25 mm superpave mix with hydrated lime (Level 1), 440 pounds per square yard or 2 2-inch lifts of 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard, per lift | | Curb and gutter required | 24 x 6-inch concrete "L" back curb; 18-inch gutter; 6-inch high; 6-inch curb width | | Base construction (office and commercial) | 8-inch base (graded aggregate), compacted to 100 percent maximum dry density | | Base construction (industrial) | 10-inch base (graded aggregate), compacted to 100 percent maximum dry density. To be on decel/accel also for industrial. | | Street width (office and commercial) | 28 feet back of curb to back of curb | | Street width (industrial) | 30 feet back of curb to back of curb | | Asphalt pavement width (office and commercial) | 28 feet | | Asphalt pavement width (industrial) | 28 feet | | Street grade | 8 percent maximum on industrial/commercial streets; 2 percent maximum grade at intersections; 100 feet from curb line | | Turnaround area | 55 feet radius cul-de-sac pavement; 110-foot diameter | | Intersections | 50-foot pavement radius at intersections; 50-foot straight section from curved streets required; 75-foot exit curb radius when designing a dual lane exit | | Driveway entrances | GDOT specifications | | Right-of-way | 60-foot right-of-way minimum; additional right-of-way or slope easement may be required for cut and fill areas; 150-foot diameter right-of-way for cul-de-sac. A 5-foot-wide utility easement is required along all street rights-of-way. | | Fill areas and back slopes | 2:1 maximum slope allowed | | Storm sewers and cross drains | See Sections 16.12 and 16.13 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management. | | Grassed areas | Shall comply with the erosion and sedimentation control requirements set forth in Section 16.5 | | Core testing | Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement. See subsections 16.D.4. and 16.F.6. | | Maintenance letter of credit or bond | 3-year maintenance letter of credit or bond on all improvements within public rights-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit or bond if used for construction access to newer phases. |