A. Sidewalks shall be at least four (4) feet in width and four (4) inches in thickness and shall be constructed of Portland cement concrete. Sidewalks shall be installed no closer than two (2) feet to the back of curb line and shall not be constructed over any underground gas, electric, communications, or water and sewer utilities. Sidewalks and curbs, at street intersections, shall be designed to permit handicapped access. Sidewalks shall be required on both sides of streets within all commercial, industrial, or residential subdivisions and all mixed-use developments. B. Sidewalks shall be installed by the builder on lots upon which a dwelling is being constructed before the issuance of a certificate of occupancy. All sidewalks along common areas, including pond lots, amenity areas, open space, and lots containing existing homes or lots that are unbuildable, shall be installed by the developer before the end of the three-year maintenance period. After the three-year maintenance period has expired, any broken curbing and sidewalk will be repaired by the builder before a certificate of occupancy is issued. C. Twelve (12) months from the completion of at least ninety percent (90%) of the dwellings in any subdivision, or phase of any subdivision, the City of Stockbridge reserves the right to install sidewalks along any areas not yet containing sidewalks. The cost of construction and installation shall be repaid to the City of Stockbridge via a lien placed on the adjacent property upon which the sidewalk fronts. D. The provisions established in this section may be applied to any project currently under review or under bond as of the date of adoption of this Code.