A. Applicability. Except as provided in this section, no application for a relocated structure permit shall be approved, nor shall any structure be moved or occupied prior to meeting all requirements of this section. B. A relocated dwelling is defined as a pre-existing structure which has been moved to another property or to a different location on the same property. Factory-built modular and manufactured homes are exempt from this section. C. Relocated dwellings shall be a permitted use in the RR (rural residential) zoning district, only as defined above and subject to all lot size and setback requirements of the RR district. Relocated dwellings shall be subject to all regulations of the Henry County Health Department concerning on-site sewage disposal facilities and private wells. D. Preliminary Inspections. No building permit application for a relocated structure shall be approved until a complete inspection of the structure is made by the city. An application for a relocated structure inspection shall be completed on forms that are provided by the community development director prior to the inspection being made. The inspection shall determine compliance or the feasibility of the compliance to all existing building codes, development codes, and ordinances which have been adopted by the mayor and city council. Depending upon the size, age, condition or design of the structure, the community development director may require an inspection and report from a structural engineer to evaluate the suitability of the structure for relocating. The engineering inspection and report fee for the relocated structure shall be paid by the applicant. If the community development director determines that compliance with existing codes is not feasible, the application for the building permit shall be denied. All such denials shall be in writing specifying the reasons therefore and shall be signed by the community development director. E. Follow-up Inspection. Following relocation of the structure and prior to and for re-inspecting, the owner of the relocated structure shall, at the owner's choice, remove either the interior wall covering on all exterior walls or the exterior wall covering on all exterior walls. If necessary, and at the direction of the community development director regarding the interior load-bearing walls, the owner shall remove one (1) side of these interior walls and the city shall then re-inspect the structure to ensure that its structural integrity has not been compromised and that any required improvements remain feasible. F. Inspection Fee. The inspection fee shall be as set forth in the fee schedule established by the city which shall be paid to the city prior to the inspection being made. G. Performance Letter of Credit or Escrow Letter of Surety Required of Owner of the Structure. To ensure that the structure will meet all current building construction codes of the City of Stockbridge and that the renovation of the relocated structure is completed and ready for occupancy within six (6) months from the date of issuance of the building permit, the owner of the relocated structure shall provide an irrevocable letter of credit or irrevocable bank escrow letter of surety in the amount of ten thousand dollars ($10,000.00) in a form that is approved by the city attorney. Such irrevocable letters of credit or irrevocable bank escrow letters of surety shall be issued from a federally insured banking institution. H. Building Permit. A building permit shall be obtained from the building safety division for a relocated structure prior to locating such structure on a lot. The fee for the permit shall be as set forth in the City of Stockbridge fee schedule. I. Owner Certification. All applications for permit shall be accompanied by a sworn affidavit that the applicant is the owner of the relocated structure and the owner of real property on which the structure is to be relocated. Prior to occupancy, the owner shall be required to obtain a certificate of occupancy (CO). J. Route Approval. 1. Structures to be Located Within the City of Stockbridge. Prior to the issuance of a permit for a relocated structure, the applicant must first submit and receive approval from the police department and the City of Stockbridge regarding the proposed route. The applicant shall provide the name and address of the moving company, owner of structure to be moved, destination of structure, type and size of structure, map of the proposed route, and the name of the insurance company. Such approval and information must be on forms that are furnished by the community development director. 2. Structures to be Located Outside of the City of Stockbridge. Prior to moving a pre-existing structure through the City of Stockbridge, routes must be approved by the police department and the City of Stockbridge on forms provided by the director. The applicant shall provide the name and address of the moving company, owner of structure to be moved, destination of structure, type and size of structure, map of the proposed route and insurance company. Required police escort must be prearranged with the police department three (3) business days prior to moving a structure through the City of Stockbridge. Moving of such structures through the City of Stockbridge shall only be allowed on routes that are approved by the City of Stockbridge. K. Requirements for Moving Companies. Any firm or individual who is moving structures into or through the City of Stockbridge shall provide a valid copy of the Georgia Department of Transportation oversize/overweight permit for the structures and a certificate of liability insurance, naming the City of Stockbridge as the certificate holder, that meets or exceeds the minimum insurance standards that are required by the Georgia Department of Transportation. L. Guarantee of Completion. No application for a building permit shall be approved until a performance bond, an irrevocable letter of credit, or an irrevocable bank escrow letter of surety is first provided, as is referred to in subsection G., above. M. Time of Completion. The work that is authorized by any permit for a relocated structure must be completed in compliance with all codes and ordinances of the City of Stockbridge within six (6) months from the date of issuance of the building permit, unless it is extended as provided herein. In the event that such a structure is not in compliance and/or is not completed within the specified time limit, the building official shall notify the owner in writing, giving specific causes of noncompliance or non-completion. Upon notification, the owner shall have thirty (30) calendar days to correct such noncompliance or non-completion. Failure of the owner to correct causes of noncompliance or non-completion, and the owner has not received an extension of completion time, shall cause a notice to move or demolish such structure to be issued to the owner immediately. Failure to move or demolish such structure within ten (10) calendar days of such notice being given shall be deemed a violation of this section and shall be punishable in the municipal court of the City of Stockbridge and the director shall authorize the surety or bank issuing the irrevocable letter of credit or escrow letter of surety to release all funds to the city. N. Extension of Completion Time. The community development director may issue a ninety-day extension of completion time for cause beyond the original six-month compliance/completion period upon the receipt of a written request by the owner stating the reason for the extension and payment of applicable fees. A second ninety-day extension may be issued following the first ninety-day extension upon written request by the owner stating the reason for the second request. Approval or denial of an extension shall be in writing and shall be signed by the building official. Permission for a greater extension of time may only be granted by mayor and city council in regular session. Applications brought before the mayor and city council shall be on forms provided by the community development director. An extension of the irrevocable letter of credit, or irrevocable bank escrow letter of surety, may be required if sufficient time does not remain on the performance irrevocable letter of credit or irrevocable bank escrow letter of surety to ensure that the structure will meet all current building construction codes of the City of Stockbridge and that the renovation of the relocated structure is completed and ready for occupancy within the specified time. Fees for each extension shall be as set forth by the city. O. Certification of Occupancy. A certificate of occupancy shall be issued upon the passing of a final inspection of a structure and shall verify the completion requirements of this section, including compliance with all existing building and life safety codes.