3.2.39. Temporary structures and uses.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A temporary building or use in connection with a construction project or subdivision development shall be permitted on the property during the construction period. The following standards shall be met by temporary uses that are established during construction or land subdivision:

A. A building permit shall be required.

B. Timeframe to utilize temporary structures.

1. Temporary structures related to a subdivision development shall be removed when eighty percent (80%) of all lots are occupied by completed homes or within four (4) years of issuance of the permit, whichever occurs first. For all types of projects, if construction becomes inactive for twelve (12) months, then any existing temporary structures must be removed within ninety (90) days.

2. The community development director may issue a one-time, one-year extension of completion time for cause beyond the original completion period upon written request by the owner, including the reason for the request and an updated account of completed houses within the subdivision. Approval will be based upon, but not limited to, current maintenance and aesthetics of the temporary structure and property, and verification that all required erosion control measures are in place. Applicants shall apply for the one-time extension within thirty (30) business days of the expiration date of the temporary structure permit. Granted or denied extensions of the compliance/completion period shall be in writing and signed by the building official within ten (10) business days. All extension approvals will be subject to a fifty-dollar ($50.00) renewal fee as established from time to time.

C. Temporary offices to be used for administrative functions during construction may be located on a construction site. The proposed construction building shall meet tie-down requirements for mobile home structures and have a current contract for sewage pump-out. Construction buildings shall be removed within thirty (30) days of completion of the construction site for which they are permitted.

D. On-site outdoor storage of equipment and construction materials shall be allowed during the period of construction.

E. Portable toilet facilities shall be allowed, provided that applicable industry hygiene standards are maintained.

F. Construction and demolition debris dumpsters are allowed, provided that an active building permit is maintained. Such dumpsters shall be removed within ten (10) calendar days of issuance of a C.O. or expiration of the building permit. Dumpsters are not required to be screened.

G. A temporary office that meets parking, handicapped, and landscape requirements shall be allowed. A temporary office may be used for sales functions or sales offices, allowing for the sale, resale or marketing of dwellings, structures or property within the development in which it is located, or adjacent developments under the same ownership and control.

H. On-site temporary use of structures and equipment for the building of roads, public utilities and government projects shall be allowed.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:stockbridge/zoning/3.2.39@2026-11-14-94299b5723