--- title: Stockbridge Zoning Ordinance, 8.4.1. Submittal requirements for development plans collection: local-codes id: local-code:stockbridge/zoning/8.4.1 cite_as: Stockbridge, Ga., Zoning Ordinance § 8.4.1 canonical_url: https://georgiacommons.org/code/local/stockbridge/zoning/8.4.1 md_url: https://georgiacommons.org/code/local/stockbridge/zoning/8.4.1.md text_url: https://georgiacommons.org/code/local/stockbridge/zoning/8.4.1/text source_url: https://library.municode.com/ga/stockbridge/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:stockbridge jurisdiction_name: Stockbridge place_fips: "1373704" corpus_version: local-codes-stockbridge-41fbfc65f02e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/stockbridge/zoning/~title-12/~chapter-8.md previous: https://georgiacommons.org/code/local/stockbridge/zoning/8.3.3.md next: https://georgiacommons.org/code/local/stockbridge/zoning/8.4.2.md index: https://georgiacommons.org/code/local/stockbridge.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:stockbridge/zoning/8.4.1@2026-11-14-0ea3ab7e30 --- # Stockbridge Zoning Ordinance, 8.4.1. Submittal requirements for development plans > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Title 12 - UNIFIED DEVELOPMENT CODE / Chapter 8 - ADMINISTRATIVE PROCEDURES / 8.4 - Procedural requirements. A. All site development plans, although not building plans, shall conform to the following standards: 1. Drawings, except final plats and as-built plats, may be submitted either on paper or in digital files. 2. All final plats, as-built plats, and drawings submitted in digital format shall comply with the specifications set forth in the adopted subdivision ordinance. 3. All drawings shall contain the dates of preparation and any revisions. 4. All drawings shall be at the same scale and shall be a minimum of one (1) inch equals one hundred (100) feet. 5. Drawing sheets shall be no larger than twenty-four (24) inches by thirty-six (36) inches and shall be uniform in size for a submittal. 6. All drawings shall contain a graphic and written scale and a north arrow. 7. All drawings shall contain the name, address, and telephone number of the preparer(s), property owner(s) and developer(s). 8. Drawings for development proposed in phases shall contain all required information for the total site, for each phase, and shall depict phase lines on the drawings. 9. All drawings shall contain the seal and signature of the licensed professional preparing the drawings and computations. B. Required Support Data and Plans. 1. All development plans shall be accompanied by a stormwater management plan meeting the requirements of Title 15. 2. Whenever a development proposes to disturb the regulatory floodplain, an engineering study shall be provided, in compliance with the requirements set forth in Title 15. 3. A landscape plan shall include sufficient information to determine whether the proposed landscape improvements are in conformity with the requirements of Section 4.7, including the following: a. Identification of all trees, natural features, and manmade structures that will be retained upon the site; b. A description of proposed landscaping improvements and plantings, including the species, size, quantity, and location of trees, shrubs, and other landscaping materials. 4. Whenever a development contains protected open space, a management plan shall be provided, demonstrating compliance with the standards for resource and open space protection in Section 4.3. 5. Whenever a development contains a floodplain or floodway, a floodplain management plan shall be provided, demonstrating compliance with Title 15, Section 15.9. 6. Applications for new or expanded mines or quarries shall provide information necessary to demonstrate compliance with State and Federal laws and regulations. 7. Erosion and sediment control plans shall comply with the requirements of the subdivision ordinance and shall contain the following additional information: a. Name and phone number of a twenty-four-hour local contact responsible for erosion and sedimentation controls. b. Activity schedule showing anticipated starting and completion dates for the project. Include the statement in bold letters that "Installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land-disturbing activities." c. Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas. d. Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan shall show options for year-round seeding. e. Include the statement: "Mulch, temporary vegetation, or permanent vegetation shall be completed on all exposed areas within fourteen (14) calendar days after disturbance ceases." f. Delineation of disturbed areas within project boundary. g. Detailed drawings and narrative notes to demonstrate compliance with the erosion and sediment control standards set forth in Title 15, Section 15.5 and the requirements in the current edition of the Manual for Erosion and Sediment Control in Georgia. h. Maintenance statement: "Erosion and sedimentation control measures shall be maintained at all times. Additional erosion and sedimentation control measures and practices shall be installed if deemed necessary by onsite inspection." i. Existing and planned contours, with ground slope contour intervals of two (2) feet. Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia. C. Requirements Regarding Permanent Reference Monuments. Materials, size, and location shall conform to the following: 1. Steel pins not less than one-half (½) inch in diameter and thirty (30) inches long, with a survey marker cap showing the land surveyors registration number shall be set at all lot corners. 2. Resetting monuments. Any monuments disturbed by construction or grading shall be reset by the applicant and approved by the director.