A. Pre-construction Review and Approval. 1. Prior to grading, the applicant shall arrange a pre-construction conference. The pre-construction meeting shall include a review of the soil erosion and sedimentation control plan, street cross-sections and profiles, construction specifications, procedures for inspections and testing, stormwater drainage and detention facilities, and any other matters concerning the development. The applicant shall provide a list of names, telephone numbers, addresses, and business license numbers of all contractors and subcontractors employed on a job. A separate pre-construction meeting is required with the HCWSA prior to any water or sanitary sewer installation. 2. A development permit shall be issued only after the approval of the construction improvements plans and soil erosion and sedimentation control plan. Site grading shall be limited only to those areas clearly defined on the approved plans. Any site grading which is done without an approved soil erosion control plan and development permit is a violation of this unified development code and shall result in enforcement penalties as provided in Title 16. In instances where grading has occurred prior to issuance of a development permit, or when grading has exceeded the area approved according to the approved plans and development permit, the permit fee amount shall be doubled. Any violations of the conditions or limitations imposed by the development permit shall also be subject to penalties provided in Title 16.