--- title: Sumter County Zoning Ordinance, Sec. 4.12. Site plan review collection: local-codes id: local-code:sumter-county/zoning/4.12 cite_as: Sumter County, Ga., Zoning Ordinance § 4.12 canonical_url: https://georgiacommons.org/code/local/sumter-county/zoning/4.12 md_url: https://georgiacommons.org/code/local/sumter-county/zoning/4.12.md text_url: https://georgiacommons.org/code/local/sumter-county/zoning/4.12/text source_url: https://library.municode.com/ga/sumter_county/codes/code_of_ordinances date: 2026-03-17 status: active jurisdiction: county:sumter jurisdiction_name: Sumter County county_fips: "13261" corpus_version: local-codes-sumter-county-2df6c25011a5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/sumter-county/zoning/~appendix-a/~article-iv.md previous: https://georgiacommons.org/code/local/sumter-county/zoning/4.11.md next: https://georgiacommons.org/code/local/sumter-county/zoning/4.13.md index: https://georgiacommons.org/code/local/sumter-county.md branch: zoning edition: As published by Municode, current through 2026-03-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:sumter-county/zoning/4.12@2026-03-17-a51a1b47c7 --- # Sumter County Zoning Ordinance, Sec. 4.12. Site plan review > As published by Municode, current through 2026-03-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article IV - GENERAL REQUIREMENTS A. In order to assure that the requirements of this appendix are satisfied, all applications for a building permit shall be accompanied by a building site plan which shall conform to the following list of requirements, and be reviewed by the zoning administrator to determine compliance with this appendix before a building permit is issued: 1. Site location map. 2. The site plan shall be drawn to a minimum scale of one inch equals 100 feet. The building official may request that the plan be drawn by a registered engineer or surveyor certified to work in the state if questions of soil suitability or flood zone locations exist within the property for which a building permit is being sought. 3. The plan shall show all property lines. 4. The plan shall show the complete outline of the proposed building at the location where it is proposed to be built. 5. The plan shall show all required building setback lines: front, rear and sides. No part of any permanent structure shall encroach on any required setbacks. 6. The plan shall show all required parking, landscape buffers and all other requirements as set out in this appendix. B. After the zoning administrator has reviewed the site plan, a letter stating approval/disapproval will be sent to the building official. C. Before inspection of the foundation, the builder shall run string connecting all the iron pins that define the corners of the lot to create an outline of the lot on the ground. D. At the time the building official conducts the foundation inspection, he will measure from the string determining the property lines to the proposed outermost edge of the building to assure compliance with the requirements of this appendix as they pertain to required setbacks. ## History (Ord. of 7-16-24(2), § 2)