Show the following information on the plan: • All items found on the Erosion and Sedimentation Control submittal checklist pertinent to normal plan review. • Site area. • The locations of existing and proposed structures, paving, driveways, cut and fill areas, detention areas, etc. • Phase lines or limits of construction (See Phased Projects). • A delineation of all protected zones with any required dimensions (See Plan Review Standards). • Calculations showing compliance with the required Site Density Factor using existing trees, and/or replacement trees, (See Density Factor Analysis). • Locations of all existing and proposed utility lines or easements. • Locations of any boring sites for underground utilities. • Locations of all specimen trees and indications whether they are to be removed or preserved (See Specimen Trees). • Locations of all tree protection devices with an indication of whether the measures are active or passive, materials to be used in each location and details (See Construction Standards). • A delineation of tree save areas in which trees have been inventoried for density calculations. • The location of any state waters and the limits of any proposed disturbance in a water quality buffer zone. • If applicable, locations and details of all permanent tree protection measures (tree wells, aeration systems, permeable paving, retaining walls, bollards, etc.) • Additional information as required on a case-by-case basis. • The following notes: NOTIFY CITY OF SUWANEE INSPECTIONS DEPARTMENT 24 HOURS BEFORE THE BEGINNING OF EVERY PHASE OF CONSTRUCTION AT 770.945.8996. NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED UNTIL ALL SITE IMPROVEMENTS HAVE BEEN COMPLETED. ALL BUFFERS AND TREE SAVE AREAS SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR FENCING PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE. TREES TO BE A MINIMUM OF 6’ IN HEIGHT AT TIME OF PLANTING. ALL TREE PROTECTION DEVICES MUST BE INSTALLED AND INSPECTED PRIOR TO ANY CLEARING, GRUBBING OR GRADING. CALL THE CITY INSPECTOR FOR AN INSPECTION. THE DENSITY REQUIREMENTS SHOWN ON THE TREE PRESERVATION/ REPLACEMENT PLAN(S) MUST BE VERIFIED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY OR ACCEPTANCE OF THE PROJECT. A MAINTENANCE INSPECTION OF TREES WILL BE PERFORMED AFTER ONE FULL GROWING SEASON FROM THE DATE OF THE FINAL CONSTRUCTION INSPECTION. PROJECT OWNERS AT THE TIME OF THE MAINTENANCE INSPECTION ARE RESPONSIBLE FOR ORDINANCE COMPLIANCE.