--- title: Suwanee Zoning Ordinance, SECTION 1801. Permits Requirements collection: local-codes id: local-code:suwanee/zoning/1801 cite_as: Suwanee, Ga., Zoning Ordinance ยง 1801 canonical_url: https://georgiacommons.org/code/local/suwanee/zoning/1801 md_url: https://georgiacommons.org/code/local/suwanee/zoning/1801.md text_url: https://georgiacommons.org/code/local/suwanee/zoning/1801/text source_url: https://www.suwanee.com/home/showpublisheddocument/5078/639233573225670000 date: 2026-11-14 status: active jurisdiction: city:suwanee jurisdiction_name: Suwanee place_fips: "1374936" corpus_version: local-codes-suwanee-3be6b1a593a4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/suwanee/zoning/~article-xviii.md previous: https://georgiacommons.org/code/local/suwanee/zoning/1800.md next: https://georgiacommons.org/code/local/suwanee/zoning/1802.md index: https://georgiacommons.org/code/local/suwanee.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website (downloaded by hand) version_id: local-code:suwanee/zoning/1801@2026-11-14-d80aa43d48 --- # Suwanee Zoning Ordinance, SECTION 1801. Permits Requirements > As posted on the city's website, retrieved 2026-11-14 Part of: Article XVIII - ADMINISTRATION, ENFORCEMENT, PENALTIES AND REMEDIES No building or other structure shall be erected, moved, added to or structurally altered without a Building Permit or a Development Permit issued by the Public Works and Inspections Department. No Building Permit shall be issued except in conformance with the provisions of this Ordinance. All applications for Building Permits or Development Permits shall be accompanied by plans in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and the locations on the lot of any existing buildings or structures, the shape, size, height, use and the location on the lot of the building or structure to be erected, moved, added to or structurally altered and such other information as may be necessary to provide for the enforcement of this Ordinance. All dimensions shown on these plans relating to the location and size of the lot to be built upon shall be based on an actual survey and the lots shall be staked out on the ground before construction is started. A Building Permit once issued becomes null and void if the work or construction authorized is not commenced with 6 months, or if construction or work is suspended or abandoned for a period of 6 months after work has commenced.