804.1. The requirements set forth in this Section shall govern the location and construction of all towers and the installation of all antennas governed by this Article.

A. Building Codes: Safety Standards To ensure the structural integrity of communication towers, the owner of a tower shall ensure that it is maintained in compliance with standards contained in applicable local building codes and the applicable standards for towers that are published by the Electronic Industries Association, as amended from time to time.

Tower owners shall conduct periodic inspections of communication towers at least once every two years to ensure structural integrity. Inspections shall be conducted by a structural engineer licensed to practice in Georgia. The results of such inspection shall be provided to the City Administrator. The owner shall have thirty

(30) days to bring such tower into compliance with such standards. If the owner fails to bring such tower into compliance within said thirty (30) days, the governing authority may remove such tower at the owner's expense.

B. Regulatory Compliance

1. All towers and antennas must meet or exceed current standards and regulations of the FAA, the FCC and any other agency of the state or federal government with the authority to regulate communications towers and antennas. If such standards and regulations are changed then the owners of the communications towers and antennas governed by this Article shall bring such communications towers and antennas into compliance with such revised standards and regulations within six (6) months of the effective date of such standards and regulations, unless a more stringent compliance schedule is mandated by the controlling federal agency.

2. Tower owners shall provide documentation showing that each communication tower is in compliance with all federal requirements.

Evidence of compliance must be submitted every 12 months.

3. Tower owners shall register ownership annually with the City and ownership changes with the City within thirty (30) days of any change.

4. The tower owner must file with the City a letter of intent for use every twentyfour (24) months and provide the City with a copy of any notice to the FCC of intent to cease operations within sixty (60) days of the date planned to cease.

C. Security Communication towers shall be enclosed by virtually pleasing, decay-resistant security fencing not less than six (6) feet in height and shall be equipped with an appropriate anti-climbing device; provided, however, the City Administrator or the Governing Body may waive such requirements for alternative tower structures.

D. Lighting No illumination is permitted on an antenna or tower unless required by the FCC, FAA or other state or federal agency of competent jurisdiction in which case the City Administrator may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding uses and views.

E. Advertising No advertising is permitted on an antenna or tower. No signs, verbiage, symbols, or information of any kind is permitted on an antenna or tower.

F. Visual Impact

1. Non-camouflaged towers shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA or other applicable federal or state agency, be painted a neutral color, so as to reduce visual obtrusiveness.

2. At a tower site the design of the buildings and related structures shall, to the extent possible, use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and build environment. Tower applicants are strongly encouraged to camouflage towers, such as by designing as a tree type appropriate to the area.

3. Any tower applicant that is not proposing a camouflage tower must provide a detailed explanation why they are not proposing a camouflaged tower.

Explanation must discuss items other than economics.

4. If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible.

5. Towers clustered at the same site shall be of similar design and scale.

6. Towers shall be the minimum height necessary to provide parity with existing similar tower supported antenna, and shall be freestanding where the negative visual effect is less than would be created by use of a guyed tower.

G. Landscaping Landscaping shall be used to effectively screen the view of the tower compound from adjacent public ways, public property and residential property and shall be as follows:

1. Tower facilities shall be landscaped with a landscaped strip of plant materials, which effectively screens the view of the tower compound.

Landscaped strips shall be a minimum of fifteen (15) feet in width and located outside the fenced perimeter of the compound. Landscaped strips shall satisfy the minimum design and planting requirements for buffers established in the Article XVII. Buffer, Landscape and Tree Regulations.

2. All existing mature tree growth and natural land forms on the site shall be preserved. Where natural vegetation around the perimeter of the site would provide an adequate visual screen, an undisturbed buffer may be utilized.

3. Native vegetation on the site shall be preserved to the greatest practical extent. The applicant shall provide a site plan showing existing significant vegetation to be removed, and vegetation to be replanted to replace that lost.

4. In lieu of these standards, the City Administrator may allow use of an alternate detailed plan and specifications for landscape and screening, including plantings, fences, walls and other features designed to screen and buffer towers and accessory uses. The plan shall accomplish the same degree of screening achieved by the provisions above, except as lesser requirements are desirable for adequate visibility for security purposes and/or for continued operation of existing bona fide agricultural or forest uses such as farms, nurseries, and tree farms. In certain locations where the visual impact of the tower would be minimal, such as remote agricultural or rural locations or developed heavy industrial areas, the landscaping requirement may be reduced or waived via written permission from the City Council.

H. Maintenance Impacts.

Equipment at a transmission facility shall be automated to the greatest extent possible to reduce traffic and congestion. Where the site abuts or has access from a collector and local street, access for maintenance vehicles shall be exclusively by means of the collector street.

I. Principal, Accessory and Joint Uses

1. Accessory structures used in direct support of a tower shall be allowed but not be used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a tower facility shall not be stored or parked on the site of the tower, unless repairs to the tower are being made.

2. Towers may be located on sites containing another principal use in the same buildable area. As long as all of the other siting, setback, separation and general requirements of this Article are met, towers may occupy a parcel meeting the minimum lot size requirements for the zoning district in which it is located. The minimum distance between a tower and other principal use located on the same lot shall be the greater of one hundred (100%) of the breakpoint or twenty-five (25) feet for a monopole, lattice or guy tower. This separation is required to assure compatibility of land uses and to provide for the health, safety and welfare of individuals and structures occupying the same site.

3. Joint use of a site is prohibited when a proposed or existing principal use includes the storage, distribution or sale of volatile, flammable, explosive or hazardous materials such as propane, gasoline, natural gas and dangerous chemicals.

J. Tower lot size, setbacks and separation

1. The site shall be of a size and shape sufficient to provide an adequate setback from the base of the tower to any property line abutting a residential district, public property, or public street. Such setback shall be sufficient to:

a. Provide for an adequate vegetative, topographic or other buffer as required in Section 804.1. (F) and (G);

b. Preserve the privacy of surrounding residential property;

c. Protect adjoining property from the potential impact of tower failure by being large enough to accommodate such failure on the site, based on the engineer's analysis required in this Article.

2. A site is presumed to be of sufficient size when it:

a. Meets the requirements of the above subsection (1);

b. Provides a setback equal to the greater of two times the height of the tower failure or the height of the actual tower by being large enough to accommodate such failure on the site, based on the engineer's analysis required in this Article.

c. Provides a setback equal to or exceeding the rear yard setback required for the adjoining property where the adjoining property is not in a residential district nor a public property nor a public street, as long as the setback of the adjoining property is at least 100% of the breakpoint of the tower.

3. Placement of more than one tower on a lot shall be permitted, provided all setback, design and landscape requirements are met as to each tower.

Structure may be located as close to each other as technically feasible, provided tower failure characteristics of the towers on the site will not lead to multiple failures in the event that one fails.

4. For a guyed structure, the site shall be of a size and shape sufficient to provide a setback equal to at least the height of the tower from a guy anchor to any property line abutting a residential district, public property or public street in addition to the size required to comply with subsection (2) above.

Such setback shall be adequate to provide a vegetative, topographic or other buffer sufficient to obscure view to the anchor from such adjoining properties.

5. All structures and uses associated with the transmission use other than the transmission tower shall be located to meet the setbacks required in the zoning district where the tower is to be located.

Read this code where it is posted (city website (downloaded by hand)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:suwanee/zoning/804@2026-11-14-701ddb2031

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Suwanee Zoning Ordinance, SECTION 804. General Requirements | Georgia Commons