Sylvester · Zoning Ordinance
Appendix B - SUBDIVISION REGULATIONS / Article III - SUBDIVISION PLATTING PROCEDURE AND REQUIREMENTS / 300 - Procedures and requirements.
Sec. 300.3. Preliminary plat requirements.
About this text
- As published by Municode, current through 2022-12-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The preliminary plat may be a sketch of approximate accuracy and at a scale that is appropriate for the size of the tract and the number of lots platted, and where all dimensions are logical, made directly on a print of a boundary survey.
The preliminary plat will include the following information:*
a. Proposed subdivision name and total acres. Subdivision names shall not duplicate the name of any other subdivision in the city.
b. Name of the owner of the subdivision.
c. The names of the owners of all adjacent land contiguous to the proposed subdivision.
d. A vicinity map showing the relative location of the proposed subdivision.
e. Proposed street names, and right-of-way and roadway widths. (Street names are subject to City of Sylvester approval.)
f. Location of utility and drainage easements. All drainage easements will be clearly marked on the proposed plat and dedicated to the city.
g. Lot lines, lot and block numbers (consecutively numbered or lettered), lot sizes, area in parks, etc.
h. Topographic maps of all land subdivided, with scale and contour interval as deemed appropriate by the planning commission/mayor and council.
i. Minimum building setback lines.
j. Numerical scale, graphic scale, north arrow, and date.
k. All elevations shall be based on sea level datum.
l. Soil characteristics, including soil types and capabilities, health department mapping of high intensity soils, frequency and evaluations of seasonal high groundwater tables, occurrence of rock, and other impervious strata where the subdivision is not to be served by a public or community sewerage system. This should be superimposed on the plat.
m. Plans for control of erosion and sedimentation.
n. Location of all water supplies on or off the subdivision which will bear upon the location of the on-site sewage management systems.
o. Delineation on plat of all wetlands and 100-year regulatory floodplains.
p. If Georgia Department of Transportation approval and permits are required, submit a copy of the Georgia DOT approval letter and permit.
q. Site reservation for garbage dumpsters, with ten or more lots, as needed.
r. Health department statement of approval of all lots.
s. If federal or state agencies, such as, but not limited to, the state department of natural resources, environmental protection division, and U.S. Army Corps of Engineers approval and permits are required, then letters, permits, and site documentation will be submitted prior to plat approval.
t. It shall be required on all proposed subdivisions that are mobile, manufactured, modular, industrialized or site built dwellings be on concrete block or brick foundations walls and piers on a poured concrete footing. This does not apply to dwellings built on a poured slab without a crawl space. All other codes apply.
* Where, in the judgment of the planning commission, any requirements under this section are determined as not necessary, the planning commission/mayor and council may recommend waiver of said requirement(s).
History
(Ord. No. 2008-01, Exh. A, 1-22-2008)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.