Skip to content
Georgia Commons
Menu

Sylvester · Zoning Ordinance

Appendix B - SUBDIVISION REGULATIONS / Article III - SUBDIVISION PLATTING PROCEDURE AND REQUIREMENTS / 300 - Procedures and requirements.

Sec. 300.6. Final plat procedure.

About this text

  • As published by Municode, current through 2022-12-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The final plat shall substantially conform with the approved preliminary plat. If desired by the subdivider, the final plat may constitute only that portion (phasing) of the preliminary plat he proposes to record and develop at that time.

a. Filing. Following approval of the preliminary plat and the completion of all required improvements to city standards, the developer shall file with the zoning administrator an application for final plat approval.

b. Application requirements. The application shall contain:

1. A letter of application containing the name and address of a person to whom notice may be sent.

2. A complete list of deviations, if any, from that which appeared on the approved preliminary plat.

3. A certified copy of all private covenants or deed restrictions, if any, pertaining to land within the subdivision.

4. A copy of the agreement between the subdivider and any other political jurisdiction, if any, regarding the arrangements for providing the necessary water and sewer facilities.

5. Evidence of the posting of a surety bond, or other form of warranty acceptable to the city, to ensure the maintenance of required public facilities and improvements for a period of one year after completion of said improvements.

6. The original reproducible, on plastic or linen, and a minimum of ten prints of the final plat.

7. Design and calculations for the stormwater drainage system, including elevations and capacities of pipes and holding basins sufficient to protect lots and surrounding properties and to control any substantial erosion.

8. A plan showing the location of all water, sewer, gas, and electrical system improvements, including locations of service connections.

9. If the proposed water/sewerage system for a subdivision requires the approval of the Georgia Department of Human Resources and/or the Georgia Department of Natural Resources, the approval shall be obtained prior to making application for approval of the final plat. The approval shall be in writing to the

planning commission/mayor and council.

10. All as-built plans, indicating permanent soil erosion and sedimentation control measures, storm drainage facilities, and public utilities. A copy of this plan shall be provided to the zoning office.

11. Affidavit or lien waiver pursuant to O.C.G.A. § 44-14-361.2 dissolving any potential liens arising under O.C.G.A. § 44-14-361 against the improvements required by article IV of the subdivision regulations of the City of Sylvester.

c. Approved by the planning commission/mayor and council. Approval or disapproval of the final plat by the planning commission/mayor and council shall be accomplished within 60 days after the date of the scheduled regular planning commission meeting following submission of the application. If, after 60 days, the planning commission/ mayor and council have failed to act, the final plat shall be deemed approved, provided that the subdivider may waive, in writing, the requirement and consent to an extension of such period. If the planning commission/mayor and council disapprove the final plat, the reasons shall be stated in the resolution and the subdivider shall be so advised.

History

The history line the source prints at the end of the section.

(Ord. No. 2008-01, Exh. A, 1-22-2008; Ord. No. 2020-01, 6-15-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:sylvester/zoning/300.6@2022-12-19-bf78be6f0b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Sylvester Zoning Ordinance, Sec. 300.6. Final plat procedure | Georgia Commons